Laserfiche WebLink
1►L�� ►�`iIlINC SACRAMENTO <br /> The status of the Carbtrol carbon canisters will be closely <br /> monitored to insure that breakthrough of the first canister does <br /> not occur. As soon as evidence indicates the first canister is <br /> saturated, it will be replaced by a new canister which will be <br /> connected in series with the remaining canister. <br /> 6. 0 ATTACHMENTS <br /> Attached are diagrams of the site location, site layout with <br /> building heights and equipment location, flow of operation, and <br /> scaled drawing of the SVX soil vapor extraction system. <br />' Also included are manufacturer-issued equipment <br /> specifications and the remediation plan submitted by Versar to <br /> ISan Joaquin County Public Health Services. <br /> I <br /> 1 <br />