Laserfiche WebLink
5/28/2014 UST Prog ran Tank Information Permit Application:CF-"Business <br /> .,r111ti��� <br /> California Environmental Reporting System:Business Kulwinder Johars Accountkon 0 Trod Rewrts He <br /> 1p <br /> Submittals Facilities Compliance My Business <br /> UST Tank Information/Monitoring Plan: JIMCO TRUCK PLAZA` <br /> Home » Prepare Submittal(10180637) » UST:UST Tank Information/Monitoring Plan(Draft) <br /> hTstructionsMelp <br /> OO <br /> Use this form to enterdate for new UST systems or revise data for an existing UST system.You must complete a separate form for each affected tank.Fortanks that are <br /> part of a compartmentalized unit,each compartment is considered a separate tank.This information is required within 30 days of permit or facility information changes. <br /> unless your local agency requires approval priorto making the changes. <br /> Select Fdk to modify/add your USTtank/system Infortnatlon. <br /> The former paper version ofthis forth was called'USTOperatmg Permit Application-Tank Information'(Faro B). <br /> �y+ 05cand View Nurturing Plan Edd Carrel <br /> of-Actio <br /> Type of Action(UST Tank) <br /> ConflmledAJpdated Information <br /> JIMCO TRUCK PLAZA' <br /> 1022 E FRONTAGE RD <br /> RIPON , CA 95366 <br /> Tank Description <br /> Tank ID# Date LIST System Installed Tank Configuration <br /> TA0507887 8/1/1998 One in a Compartmented Unit <br /> Tank Manufacturer Date Bdsting UST Discovered Numberof Compartments In the Unit <br /> MODERN WELDING - 2 <br /> Tank Capacity In Gallons Date UST Permanently Closed Additional Description <br /> 12000 <br /> Tank Use Use Tank Contents Type of Tank <br /> Motor Vehicle Fueling Regular Unleaded Double Wall <br /> Other Petroleum Contents <br /> Primary Containment Se condary Containen a nt <br /> Other Non-Petroleum Contents Steel Steel <br /> overfill Protection <br /> No AudIbIBNISual Alarms Yes Fill Tube Shut-Off Valve <br /> No Ball Float NO Exempt <br /> rodact I Waste Piping Construction <br /> Piping Construction Primary Contain ® CERS Help SettiOgs My Business <br /> Double-walled Fiberglass <br /> Piping System Typep.,�m.or <br /> Pressure <br /> aporReco ipe-Plprn9-Conshvetion <br /> Primary Containment Vapor Recovery Primary Containment Riser Pipe Primary Containment Vent Piping Transition Sumps <br /> Fiberglass Fiberglass Steel None <br /> Fill Components Installed <br /> Secondary Containment Vapor Recovery Secondary Containment Riser Pipe Secondary Containment Yes Spill Bucket <br /> None None None No Striker PlataiBonom Protector <br /> - No Containment Sump <br /> der�rspenser Gontarmment{UBE orrosiorrProtecfi <br /> Construction Type Construction Material No Sacrificial Anode <br /> Single-walled Rigid Plastic No Impressed Current <br /> :1 Yes Isolation <br /> FApplicanPCertification <br /> https://cersbusiness2.calepa.m.ga/49409/Facilityl10180637/Submittal/DraNUST/155947rranNnformatiordDetail/512843 1r2 <br />