My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 3:22:51 PM
Creation date
11/5/2018 10:30:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\BILLING 2010-2015.PDF
QuestysFileName
BILLING 2010-2015
QuestysRecordDate
11/30/2017 8:57:54 PM
QuestysRecordID
3740259
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA °°1 <br /> STATE WATER RESOURCES CONTROL BOARD iP <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �� "° <br /> o Y/ 2 > <br /> D <br /> ;a: <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 6 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: Z ZT Z2919 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.• © B. MANUFACTURED BY: / S j� <br /> C. DATE INSTALLED(MO/DAYIYEAR) G 5 D. TANK CAPACITY IN GALLONS Z e-wc;, <br /> II.TANKCO ENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OILB. C. 1:JUNLEA <br /> laDED DIESEL <br /> ❑ 6 AVIATION GAS <br /> 712 PETROLEUM ❑ 60 EMPTY PRODUCT ❑ lb PREMIUM 4 GASAHOL E-1 ] METHANOL <br /> ❑ 3 CHEMICALPRODUCT F—] 95 UNKNOWN E::] 2 LEADED 2 WASTE ❑ UNLEADED ❑ 99�OTHER L(DESCRIBE IN ITEM D. BELOW) <br /> ❑ <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.s: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.9,AND C.AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANKBARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 6 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED E;� !5"ORRNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONEUNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A(g,,k PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U B 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A®5 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION AUTOMATIC LINE LEAK DETECTORLINE TIGHTNESS TESTING ❑ --- <br /> MONITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> E;efTANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANT'S NAME DATE <br /> (PRI WED a SIGNANAE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# VvALO ZZ <br /> STATE I.D.# � 6 © 1v Ilo <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> /0�7Z <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORO"S R5 <br /> ... .40I �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.