My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 3:22:51 PM
Creation date
11/5/2018 10:30:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\BILLING 2010-2015.PDF
QuestysFileName
BILLING 2010-2015
QuestysRecordDate
11/30/2017 8:57:54 PM
QuestysRecordID
3740259
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ 'PIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> - MONITORING PLAN-(Pftze 1 of 2 Hut <br /> TypZQ0MrrjON ❑1.NEW PLAN -02.CHANGE OF INFORMATION d90,2 <br /> PLAN• YPE 1.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( <br /> I. FACILITY <br /> FACQdTY INFORMATION <br /> t <br /> FACILITY ID#(Agency Use Only) T �y 3. <br /> BUSINESS NAME(Same as FACILITY NAME) Ti-y-ncO 1 f ` 'Q-Z� 1w. <br /> CITY <br /> BUSINESS SITE ADDRESS aLL I <br /> IL EQUIPMENT STING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of11equipment(e.g.,sensors,probes,line leak detectors,etc.)must be perforlrxd at the frequency <br /> specified by the equipment manufacturers'mstructtw5,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 26322634.263- 2641 --- x90.38 <br /> MONITORING EQUIPMENT IS SERVICED �,l ANNUALLY ❑ 99.OTHER(Specify): _ 490.3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN• Z.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632. <br /> 2634 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): 4o-5 <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTmAL)SPACE(S)OR SECONDARY CONTAINMENT <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) 490,6 <br /> SECONDARY CONTAINMENT IS: X a DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49 8 <br /> PANEL MANUFACTURER: MODEL#: T LS- 5 <br /> V- a9o-to <br /> LEAK SENSOR MANUFACTURER �ef.dgk 090.9 R S - a O <br /> -CT2-.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 49x11 <br /> x90.12 MODEL#: 490.13 <br /> PANEL MANUFACTURER: 4ais <br /> aAIL MODEL#(S): <br /> IN-TANK PROBE MANUFACTURER: <br /> 490.16 <br /> LEAK TEST FREQUENCY: ❑ a CONTINUOUS ❑ b.DAILY/MGHTLY ❑ c.WEEKLY <br /> ❑ 49x27 <br /> d MONTHLY ❑ e.OTHER(Specify): <br /> 490.18 <br /> PROGRAMMED TESTS: ❑ a 0.1 gp.b. ❑ It.0.2 g p.h. ❑ c.OTHER(Specify): 4919 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.29 <br /> El4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a 36 HOURS [I It.60 HOURS 49021 <br /> 490.21 <br /> El 5.TANK INTEIT <br /> GRY TESTING(23 CCR§2643.1): 40.23 <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490.]3 <br /> 490.26 <br /> ❑ <br /> 99.OTHER (Specify): 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONTTORING OF PIP`V PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: a DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM 490.29 <br /> 49oa640.31 <br /> PANEL MANUFACTURER: V -P-( - MODEL#: � - <br /> LEAK SENSOR MANUFACTURER: 490.31 MODEL#(S): '-(C{c{;�90-r3Q(�j a9oa3 <br /> PIPING IEAR ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. X,a YES ❑It.NO a9o-3a <br /> FAILIR E/DISCONNECITON OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. X8.YES ❑b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 gp.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 190'M <br /> MILD MANUFACTURER(S): - Q: ° 3r MODEL#(S): ) 5 49x36 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLD MANUFACTURER(S) 49DAe MODEL#(S): 4911 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I.MINIMUM MONTHLY 02 gp.h. ❑ 2.MINIMUM ANNUAL 0.1 gp.h. d90'42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 4043 <br /> ELLD FAI.UREIDISCONNEC ION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 490.00 <br /> 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS ) 490.46490.0 <br /> 5.VISUAL PIPE MONITORING. 496276 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MrK MONTHLY&EACH TIME SYSTEM OPERATED' 4919 <br /> Allowd 6r mon¢mi u}'„Mrid fuel i unl HSC 25281 5 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490.50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> st <br /> 40.$2 <br /> ❑ 99.OTHER(Specify) 490.53 <br /> UPCF UST-D(Iaf3007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.