My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:09:29 PM
Creation date
11/5/2018 10:33:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\816\PR0231470\COMPLIANCE INFO\2016 - PRESENT.PDF
QuestysFileName
2016 - PRESENT
QuestysRecordDate
9/22/2016 7:01:58 PM
QuestysRecordID
3006673
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Semicing RECEIVED <br /> C <br /> Software Version Installed. 331.01 <br /> :om tete thfflNo* <br /> list: <br /> FEB 14 2017 <br /> ,op <br /> Yess the autlible alarm operational? <br /> ® Yes 1-t—he visual alarm operational? CIVVI <br /> ® YesWere all senso s visually inspected,tunctionally tested,and confirmed operational? <br /> ® YesWere all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ YesIf alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® Yesor pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shutdown? (Check all that apply) ® Sumpttrench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirn positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ® Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ❑ N/A installed), is the overfill warning alarm visible and audible at the tank fill points)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger? 90 <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No` Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No` I Is all monitoring equipment operational per manufacturers specifications? <br /> `In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. comments: INSPECTOR ELENA ON SITE . LITTLE WATER IN DISP 3-4 AND 5-6 CLEANED OUT ON SITE <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.