Laserfiche WebLink
Monitoring System Certification ` RECEIVED <br /> UST Monitoring Site Plan <br /> Site AddressRIPON PACIFIC PRIDE CARWASH 818 S.FRONTAGE ROAD RIPON CA 95388 FEB 14 2017 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . ENVIRONMENTAL HEALTH <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> DEPARTMENT . . <br /> . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . <br /> CAS <br /> OUT <br /> . .O. . . . . ROUSE . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . _ .DSL. <br /> . ATG <br /> T 00 a <br /> .nx . . . .X <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> A <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> KEY - <br /> A=ANNULAR <br /> F=FILLS ' <br /> T=TURBINE <br /> P=PROBE <br /> V=VAPOR <br /> X=SUMP SENSOR <br /> M=Manway <br /> B=Brine Sensor . . . . . . . . . <br /> =Smart Sensor <br /> S=STP <br /> C=Floats&Chains <br /> E—E Stop <br /> Date map was drawn: 1-31-17 <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />