My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:09:29 PM
Creation date
11/5/2018 10:33:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\816\PR0231470\COMPLIANCE INFO\2016 - PRESENT.PDF
QuestysFileName
2016 - PRESENT
QuestysRecordDate
9/22/2016 7:01:58 PM
QuestysRecordID
3006673
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 3 0 2016 <br /> SWRCB,January 2002 ��[ , . Page of <br /> 7. UNDER-DISPENSER CONTAINMi <br /> i(Zgt���ppFSTING <br /> Test Method Developed By: I UDC Manufacturer :. Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC# 1&2 UDC#3&4 UDC#5&6 UDC# <br /> UDC Manufacturer: Western Fiberglass Western Fiberglass Western Fiberglass <br /> UDC Material: Poly Plastic Poly Plastic Poly Plastic <br /> UDC Depth: 30" 31" 30" <br /> Height from UDC Bottom to Top 12" 11" 13" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 10" 8" 6" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested' Water Line 14" Water Line 13" Water Line 15" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes Yes Yes <br /> product and water)?' <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes Yes <br /> safe shutdown?' <br /> Was fail-safe verified to be No No No <br /> operational?' <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 10:00 10:05 10:10 <br /> Initial Reading(Ri): .001 .001 .001 <br /> Test End Time: 10:30 10:35 10:40 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor properly replaced and yes Yes Yes <br /> verified functional after testing.? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.