My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:09:29 PM
Creation date
11/5/2018 10:33:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\816\PR0231470\COMPLIANCE INFO\2016 - PRESENT.PDF
QuestysFileName
2016 - PRESENT
QuestysRecordDate
9/22/2016 7:01:58 PM
QuestysRecordID
3006673
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR srrP 15 2016 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retainetW(MENTAL HEALTH <br /> PERMIT/SERVICES <br /> 1. Site map enclosed? YES [] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> bts� cz�(7zl�o(�� ��Ny�� o flscrs Ci�(r) St I> <br /> N3aaC- g� ymri <br /> 14 ,y uu-(eA Coe Vise a <br /> y) /RlS-Ac"_ QE,( r, �a��1� 4/V 59-5 Mss se42fES <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> EH230038(revised 7-26-2016) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.