Laserfiche WebLink
..W <br /> HEALTH AND SAFETY PLAN <br /> RE: Farmington Fire Dept. <br /> 25474 E. Hwy. 4 <br /> Farmington, CA 95230 <br /> Tank and Product <br /> One(1) 250 gallon gasoline tank <br /> One(1)250 gallon diesel tank <br /> The project manager and health and safety coordinator is Lou Tvedt of Paydirt <br /> Excavating Co. Inc. 269 Oregon St. ,Ripon, CA 95366,Phone#(209) 599-2347 pager <br /> no. (209)995-0122. The site safety officer will be Lou Tvedt of Paydirt Excavating Co. <br /> Inc. The alternative site of safety officer will be George Gilmore of Paydirt Excavating <br /> Co. Inc. <br /> Paydirt Excavating Co. Inc., will have on site two(2)fire extinguishers and one(1) first <br /> aid kit within 50 feet of tank location(see map). No smoking will be permitted within 50 <br /> feet of the tank or areas where flammable vapors are present. Two no smoking signs will <br /> be posted at job site. Paydirt Excavating co. Inc. shall notify USA Dig 48 hours before <br /> excavation shall begin. Tank will be emptied of product before start of job. Tank will be <br /> triple rinsed,the rinsate will be pumped from the tanks, stored in barrels and the barrels <br /> will be hauled by Refinery Services phone number 1-800-874-4444 address: 13331 N. <br /> Hwy 33,Patterson, CA. Dry ice 30 pounds per tank will be used to inert the tanks. <br /> Before lifting of tank,Paydirt Excavating co. Inc. shall monitor tank with a low <br /> explosion level(LEL) monitor. We will seal an openings and one(1)plug will have an <br /> 1/8 inch opening before tank will be transported along with piping. At no time will <br /> Paydirt Excavating co. Inc. cut or weld on site. Tank will be secured on truck after <br /> excavation for transportation. Tank and plumbing will be hauled by by Paydirt <br /> Excavating Co. Inc. to Cal-Coast Mfg. 1540 Lynwood, Turlock, CA 95380,phone(209) <br /> 668-9382. Paydirt Excavating Co. Inc. will approach all tank excavations with possible <br /> cave-ins. The following rules will be followed to prevent any mishaps: <br /> 1. Soil will be inspected for stability before and after removal of tanks. <br /> 2. Soil to be at least two (2)feet from edge of an excavation. <br /> 3. If excavation is five(5)feet or more,the hole shall be tapered, braced, or other <br /> equipment methods shall be used to prevent possible cave-ins, precautions will be at all <br /> times. <br />