.wwv .,rxswna.ww`Pww oaw.avu.cttrS
<br /> LEX
<br /> ----- ---- - - COFFROTH
<br /> \Suction System - Open Check vaFve, pullpoppet and drain product (earn line Into lank. ALIERNAINE BACKFILL MATERIALS: Defined as an material not meeting above requirements SPECIAL FITTINGS: The ahvl-off vocce Shen ' or 'Sole
<br /> 01 GENERAL. REOUIREMEN TS Do not replace . R pp y ( y' a a) at Ih• onto of lna product pump y �
<br /> p Popped. elrsb111 cover on valve. for approved mole rials, or dispanaar is aecurad In pofilion to the stabilizer tv,, of Iha d'n pen,er <n ninimnanl box at da tailed
<br /> Pra vara System- 'Brook' pipe at union of nn+oto pump. Drain product Into lank or Approval of Company Representative Is raqquired prior to use of Such materlul. In certain on the droving.,
<br /> Thane General Requirements apply to It section, Of the opacification, at 11 staled separately In each\ separate container. rA' Intloncef, the approval of the lank monufadurer may be required to preserve the tank warranty. Poli lion the valve so that the Ilne lest m
<br /> faction. \ Company shall obtain Such approval. part plug if accen7bfe.
<br /> Avoid fpilla. �Do not allow product to drain Into sail. Contractor may be held Jobl 'If sail PIPE WRAPPING: All under round steel a and Idpnls shall be 11eIJ rimed and wrapped
<br /> .
<br /> COMPANY REPRESENTAINE:t. ny RIIIlnfl �E(1'E`.E 4TAiicE.q Roprasa`ila live authorized by him, i Cantaromelion"'occurs during lnnk and line rernovaL f,P Atemote materials, if used, must be dry and free of Ica and now. The lank hole fifes mint be Wfappinf material shoilg be 35 roil p ) P ASSOC .
<br /> harainallar refarrM to In
<br /> those specifications as fon Da,y aprase illlrra. • / shared or side sloped to Petmll entry for campocli°n and le sling. ) Polyethylene lope 'Polrken 930 p Sha ativred by the K width l
<br /> Flush all product, vent and vapor return lines back In lank or eaporote contell,r Ss). (Flushing ComPany (or e,Iuol approved by Cornpuny Reprasentative). Wn1p overlypp shop ba ane-half width
<br /> In separate containers can be dumped into product Tonle for storage.) Flush sect+ line with a of wry Vping mo afial. Wrap 1- /2' and Y filling$ .,in P"i 900 t12 mita) with a 60i
<br /> n.✓}-1 F'Pv-FIJI- If-1 Tc{,riy� G.!rsc4 J'.!ir= } ?to F'!. =rh Ns , If•�c ! minimum+ of 10 gallons sof water. UEOOINO Of iMIKS: A tY minimum Ded a( backfill n+ol erial Is to Da laced In Cha halo, overtop. In difficult areas PoIyken 931 can be used before wrapping with Polyven 9CO. Primer r♦
<br /> v Z 'fnoolhed and sloped D shun be Votykan 427 (above 4U F) or Volyken gig (above Ice F). ARCHITECTS
<br /> p 1 to allow v look lops of 1' In 10' downward lowmd the lilt and prlot (°
<br /> Open all apeninga and flush Inside If each lank wilb a minimum of 200 gqallons of water using ,elbnq the lank,
<br /> high pressure spray equipment ilh and to 'o¢sh down the sldill bo llom of the lank. Es Captions: Oa not wrap the union at the ramate Dump and/or FRP pipe/Ila. connector
<br /> WORK INCLUDED: AI labor, material, utilities and equipment required far III parlonnan<e and \ / When specilled, the hold or lie-do*n 'logi that be Installed prior to be boil rnattelal. c°nnacliens. PLANNERS
<br /> completion of work herein 'pectied or oho+a on occompony'ng dri.Inl Includinq procural+:'! I Company Representative will orran94 for a vacuum truck to collect alt racovered product (liquid
<br /> of and payment for all necessary permits, utilities, ale, unless ohharwne noted on the plana or and siudgo). Vacuum truck 1, to return 'recovered* producl'lo 'slop' at Company facility or Caution - Do not place tanks on concrete slabs, limber, boom,, Clods, or rout the tanks in wet SETTING h BEGGINGaced PINE: A minimum bad of Dackfill malarial, equal l0 2 1/2 ateri the a diiam#le
<br /> r g If Olt,-
<br /> be placed I'o all ,pin afootPonchos. Smooth,the cc Pact pip,
<br /> specifications or ,pacified by Ca moa pony ReV•<,enlallve. approved treating facility with approved all/eater separator/sy dem. cement. the look, *nether lied down ar not, mud never De tell on Iha beJ without o her-k(q to olio+ a slope of I/p4 per tool toward the tanks pact and slope Deriding material
<br /> The lank must be free from llammoble vapors prior to removal. On• method is to remove all holeto ,
<br /> lap OI the lank It there Is any chance of water, 1Y of more above the tank bollorn, In the 1/8 per foot moy ba used II opeL?ved-in wrillnq Compa _Repnsenlativa, 21155 L STREET, SUITE 213
<br /> DOCUMENTS: L'rawlngl old s;.cificotiam ora coopendive, Execute work indicated In one us If lank Neural, except Icor Cha lank van! °mi-plat• solid carbon dlosWe (dry Ice) In lnk. A
<br /> indicated in bath. 'Nark not delated or specified n+usl be Sarna quality and type as work detailed minimum of 1.5 lbs par 100 gallons of lank capacity mull be added. Pled la
<br /> ug all lank Coalinga SEE SECTION 07 FO12 BACKFILL AUTERULS. SACRAMENTO, CA 95816or spaciliM. Contractor shall verify III dimenslons and conditions on Use site, Report at once except the rant and allow the tank to vent. Plating shall be
<br /> placed any discrepancies found between dm*In9s, tpecilieotions and rile <,Md, i.Ml for odjudmont by \ p mo Cross orae another on prepared ped In such a rsvmnar us to minimize Points of which ane pipe
<br /> p 0,3 ( RODUCF, VENT cot VAPOR RECOVERY PIPING y pipe. At paints where pip:ng must clot, over, a nun,rnurm of 2 1/Y, mutt
<br /> Company Representative before 11Ortlnq work In question. Unaaf no circunn tont ea ,haul) xor4 Aller lank venting, the vapor spots shall be la,ta3•by placing the combustible alible gas Indicator probe soperote In, p'pes.
<br /> In question be started if a discrepancy a discovered after award of Contract, farms of contract Into the fill opening w;01 the drop b•ha, removed, Readings should be token at the bottom, 91 6.443.2560
<br /> apply to this work. Contractor to keep o complete set of drawing, and spoclficutione and an middle and upper portions of (no len k,' The lank atmosphere roust be 205 or lata of the lower Whan piping Is planed on the bed. proceed to 'First Tail (bolo.) prior to Dack Rllim (r r n FAX r
<br /> y 91 6.44b.6�83
<br /> pullnenl wDple,^ental dp<umanls on the Job at an lune s. When IN word VIYWIOE N used on Ilam mebl♦ IInJ Prior to ranmvnl. Rotor to the props manWoclunr'' In slrocllone for testing In MATERIALS: AI pipes, fillingq e, risen, xropDing malarial s, etc., shell be lumi,had and In,1011ed ) alt <s.
<br /> druw!nga or In specifications, it shall be token to made, 'Furnish and IM,dil,' low oxygen c nddlons. \ by the Contractor, Spadfie material' noted In this specification and/or an plant will be LLEAI:IIG SOLVENTS: Remove any accumulation or accidental spill of pipe claonlnq salvenb pn
<br /> furnished by Company. the lank In+medlotaly with a clean cloth. After the piping b completed Inspect he <ontdlnm.QJ
<br /> Prior to removal, all lank opening, should be plugged. One plug, should huva a J/8' vent hole Sump and other collection points for piping claonlnq solvents. Contractor wdl be re,pon,ibla for © 1995 LEX COFFROTH & ASSOCIATES
<br /> LAWS, CODES, ORDINAIICES ANO REGULAIIGN/S: Los,, Coda,, Ordinances and Requlations I to prevent excessive pressure buildup, This vent hole must foot upward at all limes. AJI Plpa run' ore tp be of 'Ilberglmi plea and ,lied In accordance with plant. any dumoga to lank resvlling ream an accumuiotlon of pipe cleaning solvent. PLANS MAY NOT BE REVISED, COPIED, OR
<br /> which apply to tKu work must be rigidly followed. Dalemune handling of any variations \ REUSED WITHOUT PRIOR 'WRITTEN PERMISSION
<br /> between plan, or spaclincutions one governloq ordinance,, ale., with Company Representative Plug any corrosion caused hales cooing ,crowed bailer plugs, Comp°ny 'RopreeanloUv *!II Inspect ! Flay connectors are to be used at the vent riser base and dispenser base piping connections. REPAJR OF PIPING: Replace any damaged piping immediately, Repair of piping using field CIA
<br /> balore etarlinq work. ins removed tanks, then release Use tanks for shipment. �� half Section al pipe I4 not acceptable. if opprovM by Company Ra prey en(otive, repair ue lnq OF LEX COFFROTH, ARCHITECT.
<br /> ' Above ground vent dear Is to be golvan!ted steel pipe. manufacturer supplied Pipe fillings and procedures is acceptable. Repaired pipe require'
<br /> Al U.L. labab shall be removed old given to the Company Reprasendiy,:\\ eomplele lesUng of retell using procedure, below.
<br /> PRECAUTIONS: Protect adjoining property, oorthwark, Yeas, etc., tram damage, and give proper ; f \ Dlack Iron plfe and/or flli!ngt Shot be used •ilh diesel fuel. Do not use golvanlsed pip. or filling,
<br /> written notice of proposed work to adjoining properly o*n,rs. Rapalr any domar7, to adjoining AI lank, mud be property labeled prier to troosporlallan from the lila. transport and disposal with rile,of cal. SECONDARY CWITANMENT fIi11NGS'. Two plata lilllnys require more adne aH: Ihan normal _
<br /> propertles caused by this operation to Qlidadlon of Company Repro a onlat Iva. Protect completed I at the ton and product line, mud to dons In ctcafdonce with all stale and local raqulallans. betl and stalgaI joints. Two 7/16 wrenches of a reelable torque Impact wrench Is required to q
<br /> work from dampge until accepted by Company Representative. / 1. FIBERGLASS PIPE: PIP, and fittings to be UL approved for patrolewn and alcohol fuels, non- lighten the fillings, Make sura adhesive !Ills all goof bel.aen pipe encs nmol fit ling wckeh. .ABED ARraiiowC
<br /> tanks.�,any mala or to Cal reyulalions regarding ,o!I sornplu at Inspection of Cooly hole\pnd/or metallic, (or underground piping of petroleum products. A;I pipe will hove bell and spigot joint,. {LEX CONNECTOR BOOTS: Encoea all (!as Connector' .hon In conloct with Soil In on bolotlon v0?'vGx ANpFe oaTf,C
<br /> tanNs. AJI product piping will have secondary containment. Vent and vapor recovery piping do not require
<br /> MATERIAL To be new, purchased lotollyy i( possible, gild of brand herein epa'a"I'd Drnnda and .✓ secondary containment unless 1pwIRM aleewhera. boot. Move the Iaolatlon boat t° Inspect and feel all primary piping and flax connector. r
<br /> pprods, Specified are °pprovM and (actuate to alabneh type and gvollly r,,10ramenh. If 11 ..When free pproduct Is found during any phase of the removal of underground lank(s) or piping .k. � c-13x42 p �.
<br /> Ed.,
<br /> would prefer to substitute brands and grades that ors equal to these 1pea1Red. W ryehm(f),.Immedlaldy notify lhf company Ii,prseenlulNe. Approved Flb•rglaee Plp•: TESTING OF PIPING: Notify the Cornpany Rspraeanlalive, wno MUST obs.,, OIL Last,. at host -o+
<br /> Information on proposed lubatilullans must be submitted to Company Representative prior to - '""'__-" '"- --- --\I 24 hour, In advance of any tali. Contractor to coordinate tatting with local Inspector. and
<br /> procurement to delarnlne acceptability to Cornpony. EXCAVATIONS: Excovgte only to the depth, required by the plant or os InsWcted by Company Ayneran Company Repreeanodl,s. 9p aFecnceu- P�
<br /> Representative. Ouolay - 3000/L Pipe S nlern to rn:c O
<br /> the Contrydrool t.t)tor IS rel Prada los all labor, material, and equipment to conduct pre cure led, (ole OF CAJf
<br /> SUPERVISION MID C ubcontructor Demerol Contractor dl responsible for progress, exetuof final If pra s 'tot Iv wotar sanction or rock b rncong with, ImmMlol'ly coma<I the C°rnpany Red T Fod gloss, Inc. or hydm,loL<) o! all produd, veal and vapor race r.ry D;DI^9
<br /> and quality of $u ofo work of sort and If es andrd!ubc and or,, la procurement of tohve Reprasenlo live for in,Uvttlam before proceeding with Cha exenva lion. Red Thread II Pipe System
<br /> and performance of work a( respective trades and Subcunllocto r, Ganaral Contractor to have TES PING DM.ATION$: Do not deviate Irons The folio wing lasting prac Mure o, Parte rn alternate
<br /> the same qualified responsible representative who understands and Speaks English fluently on the TANK HOLE SIZE IN STABLE SOIL- Site excavull°n perimeter to allow 21 minimum between Adhe,ivaf for Primary PrWucl Piping Adhesives ,for Vent, Vapor, and Seconds Containment Piping testing procedures required by local lesPedirl after Chevron teals are completed and
<br /> job at all lime,, including time of final Inspection, Genual Contractor h responsible for tanks and 24 minimum belween tank side, and and caps and the woll of the tank ho:a. D5--8014 (Must bo Heal Pocked) OS-7069 Secondary D 9 documented.
<br /> 01 tablishin and malnloinlnq ail Knee, !ovals and grade, shown On plana or olher+lsa required. 05-6069
<br /> General onlroctor In maintain site in accn sole condition far other hada and eanlradonI. F1RSI TEST (Prior to Back Filling Pipe Trenches): Co "I Connect pDing to lank,, remota
<br /> . ung or Clspenaers. Do not seal or install seconds lTMIK HOLE 511E IN UNSTABLE SU,,l soil It defined os hav having la !hap Ibf./aq. No -melollit filing, are to be thole monufnclured by the Supplier of the Alpe being used. P secondary ronlainment until prim'1'Y DIVi^9
<br /> It. cohesion. as calculated from an uncon(ned as e
<br /> compression ll, or soils with ann n
<br /> ullimale pooling n leafed.
<br /> RESPONSIBIL-ITY: Th. Contractor accepts full responsibility for )raper handling and inlaf!otion capacity of las Ulan 3,500 lbs./sq,R. Loose sand, muck. bog, peal, asarnp or landfill where Soil Instoll primary and secondary pipe and fitings In accordance with the monufoclurarsInelrucllons.
<br /> Of the fiberglass reinforced plodie (FNP) or composite underground tank, Ind FRP piping, and is sell are generally conaldlered unslable soil,, fast the entire piping System. in„ product, vont secondary containment and vapor recovery
<br /> shall ensure that good workmanship, practical and conslruction proteduras ore followed during 2. STEEL PIPE: (Oaivonlud or Black Iron) (where cpplicoble), In accordance wdh the folloorag protadura.
<br /> line handling and installation of the tanks and piping. Site excavation perimeter fro allow 24' minimum between tanks and o minimum of half the tank
<br /> diameter between the lank da/end cups and the wall of the tank hole, Schedule 40 (ASTM A-120) Steal Plpe
<br /> The Contractor b responsible for Inspection of the tanks for domage upon recelpt at the job site, 300 (( Railroad Unions Step Ona: Install pressure application sTslem that Includes loo pressure gauge, (15
<br /> Note any risible Compile on the delivery recelpt. Filler !code will be used to line tank hole for Flip tanks In unstable soil. 150 J Malleable Iron Fllhing, pal maximum). Apply pleasure air 10 per Into the piping system.
<br /> Soap all Aoinb ufmq approved loop solution.
<br /> The presence or the Company ndlinq, install onnile does not sieve es. Contractor of the Pennanent shoring may n used to stabilize the walls of the sh lank hole, , the discretion of IM Do mol use standard you Piings typically furnished with the pipe. C'eralu!ly o Sarva tach joint for evidence of looks.
<br /> responsibility for proper lank hu ndliro), installation, and safety measure,. - Contractor and or Compo nye Neppro sanlative. N pemionenl shoring b used, fallow 'Stable $ail'
<br /> site criteria, alar to Atmrnale Dackfill Malarial,, below. I'ANDLINO OF PIPE h FITTINGS: NI piping installations ,hall Conform lo. pipe manufacturer's Step Two: Protect area around pipinq systems to prevent workmen, panes-by, etc..
<br /> specifications and Imiallallon quidelmea. Iron+ entry. Install pressure application System that include, too pressure gauges (150
<br /> TESTING AND INSPECTION: The nature and type of tats and or Inspections to be Conducted, In pal maximum) Apply 100 pal pressure to each
<br /> p piping sydern, hold for one minute,
<br /> addition to those at.ve mond culled for on the plans of In the such
<br /> tests ons, rill paid
<br /> listed by DEPTH OF TANK HOLE: Contra rotor a reapon l" ler establishingno led lank note depth, consideringsop. 1, FlOERG1p a, PIPE: object
<br /> ; handling of piping b uilicol, Protect piping cgainet obroslan tel pressure, Repeal for Inc cycles.
<br /> Company liepre,enbl live under 'Scope or Work.' the clot o/ wch lash will be paid by the the length of piping runt. Ito the pump blac4t and van! dun, pips burial depth, yard slope and Iron sharp or hard objech; Impost da muga from unproper storriq transporting, laying or
<br /> Campony. Ihs foliodng criteria: (Meas urs al lh< Remota Pump opening). EackRlliny. Inspect all pipe for damage prior to indoilolio^ in tl. piping system. Step Throe: Repeat Step One.
<br /> If the Company R•pres,rod'vo dalenninas, during the course of construction, that additional 1. A mirlmum of 12' of baeklill malarial I, required under Cha links. 2. STEEL PIPE AND FITTINGS: Protect against damage to prolective cog tingle fop ping. Record off 'last results on the Company-sup Plied Janus. Company Repreoentolive'# opprovol of
<br /> inspections or testing, another by Con+pony Representative ar a testing agency, ora necusary, las( is required. Alter obtaining such o b
<br /> approval, the Contractor shoo Irenchas to
<br /> the Contractor shall cooperate in making arongaa+enle for such lash. If work in questlen he, 2. Flip; The minimum depth of saver Is 3'-Gy and the moxlmum lAT10N S 7'-ft. R61 REQUIREMENTS: Interior ,urfec: of all pipe and fill;' s roast be free from dirt Subgrade, lthe requirements of Section 02 and molariab in Section 07.
<br /> not gyel boon initoded and questioned material a Sailpayment for the led ,had be made Composite: The minimum depth of cover !s V-6 and the maximum la 5'-if. Scale, meet, Lbarglma particles, etc. before connaotin q
<br /> by Company, if the material is uneatil ler/, d Shall be ,-oplQctd at no additlanol cost ho q' 2. SECORD TEST (After feeling secondary piping): Apply 10 pd to the secondary cantolnmenl
<br /> Company, and the cost of Ihs tat shell be paid by Conlraetaf. 3, Pilch Iha product tines II/4' foal from the pumpblaeks hooded the lank!. Product piping must be pitched upward continuously from tanks to filer a minimum of 1/4' par system. Soap Olt faint, using approved loop sola Han'.
<br /> 4, Pilch the vent and vapor fool. Trip. or lags *ill lot be p7ennilted, Croup all piping and locale of shown on the plans,
<br /> For work already installed (.rich mud be uncovered In order to be tested), If It Is da/ective, the por rerun+ line, 1/4' par tool towafd the tanks. Lina ore to be told straight, ming fittings far direr,Lionel and elevation chore ea. 3. TNHO TEST (Altar connectinq pi Ing to tank' but prior to backridbw)): Apply 45 pal pressure air REVISIONS
<br /> ---���
<br /> Contractor than boor the expanses of such uncovering, leafing, Inspection and replacement of ) (Oo not escaed 50 pd) to taaP eye tem. Keep pressure on all Noe, until PuvMg Is completed, y-� �\ /ICI I� c
<br /> detective material ar construction. If Una work Is not found defective, Contractor will be allowed 5. Mlnimtun of 2 1/2 Inch laparalion bal clamshell anlage It pipe wall exterior for oil +hare should be no pre,sura loss during the remainder of the construction. \ V .J O �I S
<br /> an Increase In led conbac, price or on extension of hh, conlrctl Uma, or both, directly Iibergiet, piping of croaa-oven. Minimum 6 1/2 inch leporulion Do not support Piping with foreign objech, such as scrops of wood, pipe, that may damage 4. FOURTH FEST 'After Back lill'rn, and Polon Ppvin
<br /> attributable To such uncovering, leafing, etc. { between libi gtaas piping In ilia trench, and the walls or the nation. Oping. Use foam suppari s. ( ) 9): 40141 to product line' alter Dackllll
<br /> and palc hinq of concrete Islands, 'labs, and yard paving h completed.
<br /> For bedding of piping ecti runs and bac kllll of plea trtncnu, later to Section 02 and to wb,eguenl r
<br /> SAfEIY; Contractor Shan perform the work n acconlur,cs with sale pradicse, laking a.l rya aanu0h SAFELY REQUIREMENT: No Poison 'hall enter o lank hole axcovollon below the S Ih tlaepp level porllont of this section. Teri lino using Petra lila Hy Croslollc Lne Tattling agvipna nL or approved equal. Company
<br /> precaution, to pprotect the Faallilyy and odlaeonl fcelliths, werknun and the public and providing, unless the rolls are shored or Iha sides doped of prescribed by current OSVU regulations each as Represengiva to dellrnate last fluid. Taal fluid shall be q,3nM*d product, diesel fuel, or water,
<br /> where roosonably nae,Ssary barriers, curds, I.rnporary bridge,, lights and watchmen. While on 54 CFR 45894 and 29 COU 1926.650, 651, and 652. No oxcsppons. Slate or local ralulrtm4nh CUTTING OF PIPE: Canlraolor Io comply �udy with the Procedure Monuui for the Qpralian of Una fate,. DEVELOPER :
<br /> the promises of Co.,pony or its CHITo�as pt of Company's safety lulu anal be stict obfenM; that aro mor ralrlclive them Company specifications are to be adhered to as though speclRed In
<br /> In particular, smoking Shall be limited to such locations unit occasions at ore spetlllcolilyy Coinpgny epacincollo^s. This Contractor 1, responsible for Car dedgn, materials, equipment, pormlh, 1, FIBERCL.SS PIPE: Cul with a fLu-loalhtd hacksaw blade or on obraaiw whoel on a Test prawn shat! be 50 psi (max.) 11.5 times oparaCaq prouveo (150A)l (at a funola pump
<br /> MAIlortred in wnling by Companyy. Contractor that not perform or pernR any act on lh, CO., for ,haring or aide dopinq o hole. circular power woe Un a low aide or 'Wry Around' T° solar o ' u°rs cul and. Cvl system with an allowable laluance °f 0.010 gol/hr,
<br /> premises of Cornpony or Its arlifolee which Inrahes a fire or upfo ton hoaord, Inctudln,) and must be within 1/8' °I square, p q P pa _
<br /> waiding, torch Cu llnq and Ji,Vaeui of debris by burning, *line. prior .rifler, consent of FILL AAD RodCKFlLL! NI if rine l shall be of a granular nature, free from vegelohian Ind Vent lines (no phase 11 vapor recovery): KEN
<br /> 't�\
<br /> Cc ns pony. •xtroneom mol Company Representative shall In,pact and approve the motedof before It 1. STEEL PIPE: Cul with a hand or power or po*ar-oper,ded pipe culler, a, in normal flllin ' ` E 1 V PAIGE
<br /> Is spread. Spread motedal n title not to exceed 12 Inches and lamp thorough y. When .qufr.d practice. 9 Unlav raq.fred by local agency, no second lest regoirM. tr'�+
<br /> The Contractor la respon siDlo for certifying Ihat employees and slbccntroelorse an twined and by local coda. Ganarof Canlroclor ,hall provide a eon+pOCllan lel for earllllcolon of fit. Vent lines and vapor recover/ 23 V N . H
<br /> CoTdiiM In Natardou, Walla Operation, and Emergency Response (IIALWOPER) In accordance TAPERING It PEA ilo: toper all cul Rbarglon pipe end, to 1-3/4 degrees using ane of ire ° P 7 piping (.dh phase I vapor ecQvr y): AM LAN E
<br /> with 29 CFR 1910.120. lepenng tools available from the pipe manufacturer, Protect pipe during tapering to pprevent
<br /> WARNING) Test, Indicate that alone• BALLAST: Use wafer as ballot under all conditipnf whore bulla sl la required. damage to pipe, The Irish toper ,hall be smooth, clean and Ira: from surface detach. The Contractor is responsible for vent and roper retovuy piping ly'ltan`s Paasing any goalie
<br /> pr M or repealed exposure 4> petroleum wpalonau, In Ilquld length of taper for Y diameter pips Is 1-5/6" old for Y dlarneler pipe ie 1-3/4 For other sits ""pofe•J teal regolremeote, LODI CALIF. 95240
<br /> or vapor form, moy be hue mful. Refer le, Moleriol Safety No Shoals lar spaclfic Infonnotlon p'.Pa, consult pipe manufacturer's Instructions. L )
<br /> an variow palro!wm prudvch, DRY HOTS CONDITION: Tank,, with backfin to tap of r the mud be to ade N there Is any I H: (209) 334-2241
<br /> Chance that surface or fubnurtoca water will enter the lank hole to a depth of 2S of grantor Steal pipe end, ora to be rearmed.
<br /> above the bottom of the tmnke.
<br /> Follow syste lOduren pc a.uutimv !or (IDuglaas pipinq, ndns, or aalvanl' used In o'e,mbllnq the ODNOINO h Apr{ESh'E SYSTEMS (Flberglae, Pipe): AI fiberglass pipe mrfaeae to be bonded
<br /> DTVInq sy,lar^. Caution - Do not ballad locale until backfli I' to lop of tank,. flail be cleaned with solvent supplied by pipe rnanufac Wrar. 11 toper" section If wet or Matti
<br /> dry with propane forth - d° not ovoehaai or burn the pipe. If temperature to below W F (21' C),
<br /> .arm oil tapered wrfacae prior to applying ffeln at use epoxy adhesive p, recommended by the
<br /> WET HOLE CONDITION: Attempt to pump eater from the tank hole to moinloin a 'Dry Hoi• manufacturer on all boil and spigot lomle. Mix Cohost" thoroughly In ctcafdonce with
<br /> 02 EXCAVATION AND BACKFILL Condttlon. It unable to Cataln aI'Dry Mala Condition, notify Company Representative who wit manufacturer's Instructions Ord apply to both sortocu. Insert Ino spigot end into Una bell using LAKEWOOD CHEVRON
<br /> delemka the Course of action. 'Sell filter fabric, lie-down •logo and bedding oa spec!Pad a dight turning motion (one-half turn to a full turn Is net es,cry) and push.
<br /> (Supplement to Caminud'on Specifications) sleewhora. Sat lank In hal,:, artiallyy fill 'with water until Il finks firm) on ins bed. Uu only
<br /> naugh water to ballast lank i backfill I' to lop of lank. After b ckfli to top of tank, XI Apply caesura until mechanical lock h achieved. Molledn bock oslal pressure on all prvlously
<br /> SERVICE STATION
<br /> REMWAL OF EXISTING TANKS AND PIPING $'[STEMS: Contractor will rami#M1 Icnk with water until completion of Imlallallon, m>em lad Jolnh to reduce led Mance of laparallon,
<br /> p"f"'tf '°°°' FOOD MART/CARWASH
<br /> ond"'p art.. equlpmenl, evctVl p' noted, to ro=now existing tank' nmol Iinaa par rlha (olio aing Coupon a Ballast level must never exceed baler or backfill level In Iha Hole during Installation. Inspect all Illlinge Ior proper all omen( and aaslbla 'back-cul a1 the clots.
<br /> race r .
<br /> 9 P j
<br /> D Curt Do not remove balls al until tank dab hos be,' poured. Do not Sat remote pump motor until
<br /> ballad baler has bean removed from lank. fellow PIPs mcnulaelunr'' rseomrnendallons on cure lien: before disturbing joints or testing.
<br /> Contractor, a' port of Cha contract, will oxocule Ind comply .1h x(h a`Compuny's 'Aldindunl If It Io a^I!ClpOad That the larnperolura velli drop below 70' F (21' C) at any Ilene during the
<br /> Tank Oi,pasal C.TiflcaJlon Agrame^t' sed curing pfocass, apply heal to the alma. Only ehamlcai or alecldcol devices recommended b
<br /> •�`1TANK i(OLD-DOWNS (Il•-Oa bas): Indall hold-down 'lagi °l all locallone with known x°ler pipe manufcclurer are acceptable for this purpose. Do nal ate open flame or #parking devices, ry��
<br /> AI lank, and cgtiC loan 'ba rMaved and dhposad nf.iri accordance with Ill, Addamdum Tank conditions and a those locations wham octal to found during tank Indonalions. Rafe, to 'Tank such 0s propane torches, to cure raaln. 23V N . HAM LANE
<br /> Disposal CarhR<otlan A)rasn+anl rung oppllcobla s^ora*and Tocol regu!allons. I Hold-Down drawing for dasl.In, fabrication and Installation raqulramenb, and to Section 05 of
<br /> Iha: apacl!(caL'ons ams drasmq F-10 (N-V[T-110-5.OWG) THREADED JOINTS: Threaded sisal pip, joints mut be roomed and have <Iwn Cul, perfect LODI CALIF. 95240
<br /> Rernoral of tants and Imes ,hall cam prPrikS'h.,Uo Raca r mended ifs Marc 1Iii supplement
<br /> u ovalprem Ind
<br /> Mescal, and be made up .Ilh non-hardening Joint compound Insoluble In petroleum products 1
<br /> Oiaposol of Used UnJergfound Slaruga ignkf''�-.�Daun+bar 1987 4nd March 1979 fuppiem'nl.
<br /> •."' 1. 1 REMOTE 1UR01NE: Contractor to verify turbine head will be 4-8' above lank bottom. Do not approved by Company Repruwtalive, TA�iQLll5E1p1 (YE_L9(LpiAEFDCO_CCIpiECL'OtlS,
<br /> Contractor shall Olay comply wlth;tlirtmt NF1sA Ond loculi regulallonf. 1111th turbine If turbine shall length exceeds lank diameter plus burial deplhl Typical joint compound:
<br /> Company Representative h responsible for rsroovoi of an ' rwanph product hon, the lunks Notify Cam any Representative, who .III determine the court, of dollar, If 'haft exceed, lank RI-PRO THREAD SEALANT: REFER 10 A 0. SMITH BULLETIN No. D4510. ''I7 �/`
<br /> Product .III be return di'to Iermincl or other compony facility. w., ! diameter plat burial daplh, Racloraaf 1 AN K Vl. LINE
<br /> Exaavule to h -
<br /> ' 1 Pumobx 51-D
<br /> t a, lop of each 41'4. Can mud ba linen to prevent bre aking.cto plping and or approved equal _��
<br /> _ rale.el It product In Ihs 'Circuit, nal. Prior ul darling • cthe ex Iha conlrad or ,I all town — ----_—_- -
<br /> power It shut all la any circuli nose candid may clow IM oacavgllon, h FIBERGLASS 70 STEEL PIPE OR FLEXIBLE CONNECTORS: IbeaO Iibarglon Ihranded-end
<br /> �TMSA'Y I adapters Into the steel pip• Or fl tingp bafor bonding °ata the libsrgfofs P;P4. us. mala and
<br /> .✓.... - - -....,.,..... ...-..... _. _-,..._... _ . -_.____ ... .- - --.. ... _. ...._ _._. IAefglaas filling when connecllnq to flexible conneclon, All flexible connector, ore male-swPral by ALL TANK AND LiNE INSTALLATIONS SHALL DE
<br /> hmott. The sample and connects to ma iroerglaaf piping.
<br /> PERFORMED BY A LICENSED C61 —D40 CONTRACTOR.
<br /> LA-L!QLVSE1D11LSlvLEQfllklfiEN1EL�OtUiECOQfiS. '
<br /> THESE PLANS ARE DIAGRAMATIC IN NATURE AND ;CALL AS NOTED
<br /> ARE NOT INTENDED TO BE AN EXACT REPRESENTATION
<br /> v —�--- — — — OF THE FINAL PRODUCT, THESE PLANS SHALL. BE DRAWING #
<br /> USED BY THE CONTRACTOR AS AN AID ONLY, 95-0804
<br /> CONTRACTOR SHALL BE RESPONSIBLE FOR THE
<br /> COMPLETE INSTALLATION OF TANKS, PIPES, AND
<br /> ALL EQUIPMENT ASSOCIATED WITH SCOPE OF WORK.
<br /> 12/20/95
<br />
|