My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996 PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
INSTALL_1996 PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:09:50 PM
Creation date
11/5/2018 11:10:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996 PLAN
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAM\236\PR0231333\INSTALL PLAN 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEX <br /> U TANK GAUGE RISER CC) FFROTN <br /> - 2. 3" MANIFOLDED VAPOR RECOVERY <br /> /- - - -- -- -'- - - --- --- -- - -- -- - - -- - -- - ----- -- - 3, FILL RISER <br /> 4. TURBINE SUMP (TYP. OF 3) <br /> -- -------- - ---- - -- - -- --- -_ ___ 5. 2" FIBERGLASS PRODUCT-IN PIPING ASSOC . <br /> W <br /> [� -`-'- --- / 3' FIBERGLASS SECONDARY CQNTANMENT PIPING <br /> 6. VENT RISERS WiTH PVC VENT CAP <br /> 7. <br /> VEPO LREC E EACH) <br /> 8. VAPOR RECOVERY RISER (STAGE I) /-,I \ Ci H I-j U� I-SJ <br /> / 9. 33'-6" X 41 '-6" X 9" THICK CONK. SLAB OVER CX <br /> UNDERGROUND FUEL TANKS. SEE DETAILS SHEET TI_3. c <br /> ---------==- � t T F LA N N E Fz ., <br /> CONTRACTOR IS TO VERIFY SLAB DIMENSIONS WITH TANK MANUFACTURER <br /> / \ \ 10. GUARD POST. SEE DETAIL `7 ON SHEET A1 .3 <br /> 11 , DOUBLE 'NALL FIBERGLASS UNDERGROUND STORAGE TANKS (TYP. OF 3) 21 15 J STREET, SUITE 213 <br /> 12. TANK MONITOR RISER SACRAMENTO, CA 95816 <br /> 12K SUPER k . 1 ,5. EMERGENCY SHUT-OFF SWITCH <br /> �� 14. ANNULAR SPACE MONITOR (TYP. OF 3) <br /> -- ✓ 15. AIR/WATER STATION (SEE 4 ON SHEET A1 .3) 916.443,2560 <br /> 16. CANOPY COLUMN. SEE SHOP DWGS. (PYP. OF 6) FAX 916,448.6583 <br /> 2K PLus \ ` i �g P \ 0 O �- 17. ISLAND VALET, INSTALL PER CHEVRON HALLMARK 21 SPECS. (TYP. OF 6) <br /> / \ /.v_ � \ ° NN%v --- 18. P.O.S SIGN. INSTALL PER MANUF, STANDARDS (TYP. OF 6) (c? 1935 Lex roFFRorFi e AssoclArEs <br /> / ( \ \ \\\ \\ / - 19. MPU DISPENSER. INSTALL PER MANUF. STANDARDS (TYP. OF 6) PLANS MAY NOT BE REVISED, COPIED, OR <br /> Ica <br /> J \ \\ I ` j ,.r l.( \ V\�� \ \ � --"--- -----`-- 20' REUSED WITHOUT PRIOR WRITTEN PERMISSION <br /> \ I& UNI.EADE9 \� \ /vv / ,` \ \\� OF LEX COFFROTHH <br /> , ARCfTECT. <br /> Woo"�� ///.// \ \ \,•�;\ _--_-_-_.._-_-_ GENERAL TANK AND LINE NOTES (DRY HOLE INSrLLADON) oE4�'r� <br /> ALL TANK AN[) LINE INSFALIAI!ONS SHALL BE PERFORMED BY A LICENSED CONTRACTOR. <br /> / VRI / /j p CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE INSTALLATION OF TANKS AND PIPES. Y1^ r_+Ay42 <br /> ,`\ <br /> II /� P U } \ \ U ,\`;+ - '- ___ 1. T{ESE PLAN'S ARE O!AGRAMMATIC IN NATURE AND ARE NOT INTENDED TO BE AN <br /> \ \\i_-_--- - Y - EXACT REPRESENTATION OF THE FINAL PRODUCT. GENERAL CONTRACTOR TO <br /> -- V V-----�___________________ __�i RELOCATE, hAODIFY, OR PAAXE ADJUSTMENTS TO PROVIDE A COMPLETE AND WORKING "f <br /> 5 \� \ / v� -� y (( _� I -3 8 DRAWINGS <br /> LOCAL ONLY <br /> REQUIREMENTS. <br /> AN TS"IEM, CONSISTENT FS THE INTENT CONTRACTOR THE DESIGN. CONTRACTOR $HALL USE THESE c (C FSA <br /> '> ✓ -� � 2 ASTALLL THREEYDOU13LE WLLFIBERGLASS TANKS (ERXES)t11FH ALL FEDERAL, STATE, T_ CALANDF <br /> SHALL COMPLY Ira _- <br /> ���� EE (3) 12,000 GALLON <br /> TANKS TO BE SET 4Fr MINIMUM BELOW FINISH GRADE. TANKS ARE 10'-0" <br /> NOMINAL- DIAMETER ( 30'--0' IN LENGTH ) AND SHALL BE INSTALLED <br /> APPROXIMATELY Y-0' APART. SEE SHEET TL2 FOR SCHEMATIC LAYOUT. <br /> TANKS SHALL BE INSTALLED PER TANK MANUFACTURER'S RECOMMENDATIONS k SPECS. <br /> /f /U 4.. TANK dURIPtl. DEPTH SHALL BE DETERMINED BY THE FOLLOWING METHOD. <br /> VIZ I� ar�4/v / A VENTTING RSERSI THE OR PRODUCTST PIPE LINES FROM DISPENSERS.WHETHER AU_OWJNT LINES <br /> FROM <br /> /4" PER FOOT <br /> ^ / ' SLOPE BACK TO TANK TURBINE CONTAINMENT SUMP. <br /> B. ADD ADDITIONAL VERTICAL DROP FOR EACH SWING JOINT, EOUIVALENT TO <br /> / THE DISTANCE BETWEEN THE CENTER LINES OF EACH FEMALE FITTING <br /> ( WHEN APPLICABLE ). <br /> C. ADD 12" TO ARRIVE AT TOP OF TANK. W ALL CASES MINIMUM BURIAL OF <br /> TANK SHALL BE 4' -0" FROM PROPOSED TANK SLAB GRADE ELEVATION. <br /> (DO NOT EXCEED TANK MANUFACTURERS MAX. BURIAL DEPTH.) <br /> CONSTRUCT A REINFORCED 9' CONCRETE SLAB. SET MANHOLE COVERS 1-1/2" <br /> o- ABOVE SLAB. ( SLAB CROWN I-172' MINIMUM CONCENTRIC ). SEE DETAILS ON -W�-•�Y-'����_� � <br /> CRAHINGS. <br /> 6. INSTALL BLACK IRON RISER FOR PHASE 11 VAPOR RECOVERY AND VENT ! <br /> o \ - CONNECTIONS WITH EXTRACTOR TEE AND BALL FLOAT VALVE PER DETAIL ON <br /> DRAWINGS. <br /> o <br /> 7. INSTALL THREE (3) 1-1/2 HORESPOWER SUBMERSIBLE PUMPS WITH NEEDIER ROUT P LUX DETECTORS (MANHOLE COVERS TO BE WATERrICIii ). <br /> < -- B. ALL PRODUCT LINES (2') AND SECONDARY CONTAINMENT (3') PIPING $HALL BE I \ f- \ /I C' ( �\ TK <br /> \ t 100% METHANOL COMPATIBLE. SMTfH RED HREAD IIA OR AMERUN ALCOHOL IS <br /> \ L_ V J V T <br /> SPECIFIED, ALL CLUES SHALL BE PERMATED 51-0. ALL VENTS UP TO GRACE <br /> /� •- SHALL BE 100% METHANOL COMPATIBLE. ALL NEW PIPING TO BE INSTALLED PER <br /> MANUFACTURER'S SPECIFICATIONS. � <br /> 9. INSTALL 2' MANiFOLDED VAPOR RECOVERY LINES. SLOPE 1/4' PER NOT INTO <br /> r <br /> --- <br /> \ - o <br /> `•�. ilii N.-.-- <br /> TANK. <br /> REFER <br /> 5 VAPOR RECOVERY LINE. SLOPED 1/4- PER FOOT INTO LOWEST GRADE DEVELOPER : <br /> I __----- �� o \ /' 111 f•YA - TANK. REf ER TO SCI{EMATIC DIAGRAM ON DRAWING. <br /> ;111 t _ 10. INSTALL- THREE (3) 2" SINGLE 'WALL VENT LINES (ONE FOR EACH TANK COMPARTMENT). <br /> Rill SLOPING 1/4' PER FOOT MINIMUM BACK TO TANKS ( REFER TO SCHEMATIC <br /> -" S-- +1� avnC1 DIAGRAM ON rL2 ). PIPING MATERIALS TO BE SAME AS PRODUCT PIPING <br /> BELOW GRADE, GALV. AT VENT RISERS ABOVE. <br /> 11. INSTALL ANNULAR SPACE MONITOR (MANHOLE COVERS TO BE WATERTIGHT). (SEE <br /> TANK INSTALLATION DELL 4/11). •w PAIGE <br /> 12. PROJECT TO BE $UFFIOENTLY BARRICADED DURING CONSTRUCTION TO PREVENT 236 N . HAM I.ANE <br /> � 1 i - t`'` ANY UNAUTHORIZED TRESPASS (VEHICULAR OR PEDESTIRAN). <br /> .� <br /> `d l\'J IK` 13. PROVIDE A STATIC GROUNDING SYSTEM AS SHOWN ON DRAWING r� <br /> ✓ / ` 14. INSTALL GUARD POSTS PER DETAIL 7 ON SHEET AI..S15. L©UI , CALIF. 95?_4U <br /> DAM- _ /� J 16. NOSTALL (6 NNSTRUCT EW MPD DSNSIER PE SERDS BS (WITH BOOD DRIVE TLESS NOZS AS ZLES) WITED H INVERTED T]{�-J ( "j� �� A 1 <br /> COAXIAL VAPOR RECOVERY, HOSES, INCLUDING INVERTED COAX BREAKAWAYS, (209) 3 1 <br /> NOZZLES, AND RETRACTORS. INSTALL NEW PUMP RELAYS AND DISPENSER CONTROL <br /> EQUIPMENT AS INDICATED ON PIANS, <br /> 17. REFER TO SUPPLEMENTAL FUEL DRAWINGS FOR ADOITONAL INFORMATION AND <br /> SPECIFICATIONS. LAK <br /> (} rl <br /> 1 18. EMERGENCY PUMP SHUT-OFF SWITCH BETWEEN 15' .AND '75' FROM PUMP ISLANDS. L.AKEW®00 CHEVRON <br /> SEE SITE PLANS. (( [[ j" T R <br /> 19. PLEASE NOTE: COORDINATE INSTALLATION OF PIPING, CONDUITS, AND LUMN FOOTINGS. FAVI V.� L I A.I I O I V <br /> 20. NISTALL- VEEDERSPENSER EROOT TLS TO S-35011 INVENTORY CONTD CONFLICTS WITH ROL INTERSTITIAL LEAK <br /> SYSTEM PER MANUFACTURERS INSTRUCTIONS. SEE ELECTRICAL AND SITE <br /> SENSING ' FOOD MAR <br /> T/CARWASH <br /> j PLANS. <br /> _ ^•' - t l- --` -" " r� 2 COUPLINGS. <br /> SEALANTS, <br /> SfETC., HALL BE (COMPATIBLE WITH EACH <br /> '2 1. INSTALL ALL NEW PIPING MANUFACTURER'S <br /> 2. ALL PIPING, COUPLI GN <br /> OTHER AND 'WITH PR E , <br /> --�'-`- • -��' -• �"" 23. ALL TIJR61NES ARE TO BE 'WIRED INDIVDUALY INTO MONITOR CONTROL SO THAT AN <br /> ACTIVATION OF THE SUMP MONITOR WILL SHUT DOWN THE TURBINE FOR THAT TANK, 236 N . HAM LANE <br /> LODI , CALIF. 95240 <br /> A _______.� _ _._ <br /> �--- 4_a.' ---9'-7 I/2- ------T i5'-9' ._-.-----__-_ - 5'-7 1/2' I 4'_9° y, 1 dC' <br /> _._.- --- -- VERIFY WITH CHEVRON U.S �._._ -- - TA(114 I INR <br /> LEGEND AQCHITECTURALI SITE PLAN <br /> - u -- -- - UNLEADED - z' DIA. LANoscAP,e - 5CAI_E <br /> - - -- s - SUPER UNLEADED 0PLAN TER3. <br /> 10' 20' DRAWING <br /> -- - --P - - <br /> PLUS UNLEADED rl -_-.-- ' �(� 17 16 Cg C� <br /> utllllllll 95-0804 <br /> - --VR- - VAPOR RECOVERY - - - SEE CHEVRON T+ALLMARK 21 ORAWiNG FOR OMITTED NOTES AND DETAILS PROJ. +# <br /> --------- ENr----- vLINE NORTH <br /> SCALEi ) " __ IC, -o" TYP1�.4L LIEL ISLAND l� 1 .�� <br /> . 1172 vrrz wor sLwE oPtc w n masa rs'.7-©' 12/20/95 <br /> <�F <br />
The URL can be used to link to this page
Your browser does not support the video tag.