Laserfiche WebLink
A B C D E F <br /> TANK COLLAR / <br /> CONTAINMENT SUMP ADDITION PROCEDURE <br /> 52" -- <br /> 42" — <br /> WHITE GROUND AREA <br /> (ENTIRE ATTACHMENT ZONE) <br /> TANK COLLAR/CONTAINMENT SUMP POSITION <br /> LID WITH GASKET ON TURBINE SUMP ONLY <br /> Lt STEP 1 <br /> TANK SURFACE PREPARATION <br /> DETAIL "C" � I <br /> I I I <br /> I I I I <br /> I I I I <br /> DETAIL "B" <br /> 3 LAYER LAY-UP OF MAT AND RESIN � I — �6.. I I <br /> tr I <br /> I I I I I <br /> 2 2 <br /> � � I I I <br /> n TANK COLLAR/CONTAINMENT SUMP POSITION <br /> LI I <br /> DETAIL "A" I I <br /> STEP 2 <br /> INSTALLATION OF CONTAINMENT SUMP <br /> I I I I I I <br /> I II II i <br /> I I I I I j <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I II 38 II I <br /> I I I I I I — <br /> 1I I I I I <br /> CONTAINMENT SUMP CONTAINMENT SUMP TOP HAT I <br /> INSTALL TANK COLLAR/CONTAINMENT SUMP <br /> I I I I <br /> CONTAINMENT SUMP — <br /> 3 LAYER LAY—UP OF MAT BOTH INSIDE <br /> TWO LAYER LAY—UP OF 6" WIDE MAT AND OUTSIDED TANK COLLAR/CONTAINMENT SUMP — <br /> WITH RESIN. BOTH INSIDE AND OUTSIDE CONTAINMENT SUMP Z — <br /> FILLER PUTTYL OF CONTAINMENT SUMP AND TOP HAT STEP 3 <br /> 3 INSTALLATION OF TANK COLLAR/ 3 <br /> FILLER PUTTY CONTAINMENT SUMP <br /> CONTAINMENT SUMP TOP HAT <br /> FILLER PUTTY <br /> FIRST 3 LAYER LAYUP OF MAT <br /> TANK COLLAR/CONTAINMENT SUMP <br /> TWO LAYER LAY—UP OF 6" WIDE MAT TWO LAYER LAY—UP OF 6" WIDE MAT 3 LAYER LAY—UP OF MAT BOTH INSIDE <br /> WITH RESIN. BOTH INSIDE AND OUTSIDE WITH RESIN. BOTH INSIDE AND OUTSIDE AND OUTSIDED TANK COLLAR/CONTAINMENT SUMP <br /> CONTAINMENT COLLAR CONTAINMENT COLLAR <br /> 43" TANK COLLAR TWO LAYER LAY—UP OF 6" WIDE MAT <br /> WITH RESIN. BOTH INSIDE AND OUTSIDE <br /> CONTAINMENT COLLAR <br /> 43" TANK COLLAR <br /> DETAIL A DETAIL "G " DETAIL "B " <br /> ATTACHMENT DETAIL FOR ATTACHMENT DETAIL FOR TOP HAT ATTACHMENT DETAIL CONTAINMENT SUMP <br /> XERXES TANK COLLAR 43 " TANK COLLAR EXTENSION ATTACHMENT DETAIL <br /> 4 REV DATE REVISED e°uxR'"u+c°Yr.UM TE air mer° e° naaROvnl RECORD <br /> v UNION OIL OF CALIFORNIA, dbo UNOCAL, 1994 w RH APPROVALS CONTAINMENT SUMP INSTALLATION DETAIL 4 <br /> MRESNNE DAIS MFROJ41 <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS ISSUED FOR C.U.P. <br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS CMCDKIM BY <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE ISSUED FOR PUN CHECK "�°" °""m°" ""� 041E <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL 'PPS <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE ISSUED FOR GEN. BID <br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT Doh 2/18/97 arsms u wx R) OArE 0R'"'NO NO, qcy Iro <br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL ISSUED FOR CONSTRUCT. PRODUCTS COMPANY <br /> IN WRITING, RECORD DRAWING scuE 3 4"'i' J - 1 . 2 <br /> (mKKsimc'rpK warm) <br /> A B C D E F <br />