Laserfiche WebLink
0 0 <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUNDSTORAGETANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54. <br />490.54b <br />® 1. CONTINUOUS ELECTRONIC MONITORING [12. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />❑ 4. NO DISPENSERS 99. OTHER (Specify): <br />_❑ <br />PANEL MANUFACTURER: VEEDER ROOT 4W55 <br />_MODEL n: TLS -350 490.56. <br />LEAK SENSOR MANUFACTURER: VEEDER ROOT 4%-57 <br />MoDELn(s):794380-208 490.58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a. YES ❑ b. NO 490.59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a. YES ❑ b. NO 690.60 <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490"61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a. YES ❑ b. NO 49 62 <br />2. UDC CONSTRUCTION IS ®1. SINGLE -WALLED ❑ 2. DOUBLE -WALLED 490.63 <br />IF DOUBLE WALLED: 490-fi4a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: [11. LIQUID [12. PRESSURE [13. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490.646 <br />VII. PERIODIC SYSTEM TESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br />LEAK DETECTION (ELD) MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUI LED. (23 CCR §2644.p __ <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490. <br />--- --- <br />3. SPILL BUCKETS ARE TESTED ANNUALLY. ----------- <br />490-67 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />® Alarm logs 490-68. ❑ Visual Inspection Records 49a68h ❑ Tank integrity testing results 4906k <br />❑ SIR testing results (and supporting documentation records). 49u68a ❑ Tank gauging results (and supporting documentation records). 490-68, <br />❑ ATG Testing results (and supporting documentation records). 490-6at ❑ Corrosion Protection 60 -day logs 490-689 <br />® Equipment maintenance and calibration records. 49o -68h <br />IX. TRAINING <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to thenjob duties. 49 a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 4W69b <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 49x6% <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-690- <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION' 49069f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g <br />❑ OTHER (Specify): M69h mssi <br />This facility has a "Designated UST Operator" who has passed the Califomia UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator' will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br />D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />D The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />➢ Names of contact person(s) for emergencies and monitoring shams. 4w7o <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 4W71 <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME DENNIS BOCK 490-72 TITLE COMPLIANCE MANAGER 490-73 <br />NAME TIM HURLOCKER TITLE DIRECTOR OF GASOLINE OPERATIONS <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE 490-76 <br />DATE: 490-77 <br />r <br />A3 <br />owmr <br />APPLICANT NAME (print): 490.79 <br />APPLICANT <br />APPLICANT TITLE: 4W79 <br />DENNIS BOCK <br />COMPLIANCE MANAGER <br />Belshire Environmental Services, Inc. <br />