Laserfiche WebLink
• 0 Page 4 of 11 <br /> 1. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Additive <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> Additive Secondary line not tested—under vacuum <br />