My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:46 AM
Creation date
11/5/2018 11:18:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2013-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*IST SYSTEM RETROFIT OR REiGR <br /> (Submit minimum of 3 sets ofplans'&applications as originals will'be retained by EHD). <br /> 1._Site map enclosed?._ YES_[j NO[]. -- <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing..or•testing any component-that.is.repaired or,replaced, Ensure a copy of the!Site Health and Safety <br /> Plan..".Is.available.on the Jobsite.as,required by TIDe 8. ' <br /> 3. Detailed description of work'to be completed. List components to be repaired or replaced,and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done; (if <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> G&1." d-- <br /> J <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-partyapproval): <br /> 333-IddlVajig <br /> 3 <br /> ............... <br />
The URL can be used to link to this page
Your browser does not support the video tag.