Laserfiche WebLink
SWRCB,January 2002 • <br /> 5. SECONDARY pIpE TESTING Page of 3 <br /> Test Method Developed By: p <br /> Piping Manufacturer Industry Standard p Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: Pressure <br /> ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spew) <br /> Test Equipment Used:Dial Gauge <br /> Equipment Resolution:0-15 psi <br /> Piping R # — <br /> P gun Piping Run# PiRun <br /> Piping Material: r Piping� #_ Piping Run# <br /> Piping Manufacturer. — - <br /> Piping Diameter: <br /> Lengthof Piping Run: z S� <br /> Product Stored: VR t fw,.1a <br /> Method and location of <br /> i in -run isolation: Test boot in sump Test boot in sum <br /> Wait time beiweem applying P Test boot in sump Test boot in sump <br /> Pre SIW acuum/water and 30 minutes 30 minutes 30 minutes <br /> star test: 30 minutes <br /> Test Start Time: <br /> Initial Reading W: o=a O <br /> Test End Time: <br /> d r7 <br /> Final Reading(RI,): S.?y t` <br /> Test Duration: 1 how <br /> Change in Rey 1 hour 1 how <br /> Reading(RF-R�: 1 how <br /> Pass/Fail Threshold or <br /> Criteria: 0.00 0.00 0.00 <br /> Test Result: 0.00 <br /> Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Pass ❑Fail <br /> COTTeuts— include information on re airs made Prior to testing, and recommendedfollow-u for ailed tests <br /> Costco#038 <br /> 1616 East Hammer Lane <br /> Stockton,Ca 95210 <br /> Nick Harvey <br /> #11590 SB 989 <br />