equipment must confirm a hydrostatic change in level no greater than .002-inches in order to <br /> achieve a"pass". <br /> If the containment sump does not pass the test, the contractor may re-inspect the sump, <br /> tighten penetrations/clamps and fitting, and re-test. If after the second test the containment <br /> sump does not achieve a "pass", the secondary containment must be considered not liquid <br /> tight. Repairs may be made using the sump manufacturers procedures per abiding by the <br /> requirements of the local CUPA. <br /> Reporting: <br /> A final report documenting secondary containment testing shall be submitted to the local CUPA <br /> within 30 days of the completion of the test. The report must include all data collected as part of <br /> the testing and indicate any deviation from the approved Work Plan. All reports shall be <br /> evaluated for the completeness and accuracy. Failure to submit a satisfactory report will result in <br /> test results not being accepted and may require additional testing. The Secondary Containment <br /> Testing Report Form created by the State Water Resources Control Board shall be used. <br /> Page 3 of 3 <br />