Laserfiche WebLink
'SWRCB,January 2002 Page 60of l'7 <br /> 9. SPILLOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> 't Pe MY'-- 3i_4i <br /> r <br /> 5.7,2Spill Box#t/,aftof/ Spill Boz Spill Boz# Spill Boz# <br /> Bucket Diameter. 'felt <br /> Bucket Depth: /40 k `l <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RO: .3l{ Cl <br /> Test End Time: .2 2 <br /> Final Reading(Rr): :3H 23 b5 <br /> Test Duration: /2 .6" .r 1. <br /> Change in Reading(AFRI): 0 . 30.00613 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Test Result: Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommendedfollaw-up for failed tests) <br /> SB 989 6 mo. test <br /> WO#: 040920-117 <br /> Costco#38 <br /> 1616E Hammer Lane &West <br /> Stockton; CA 95210 <br />