My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1767
>
2300 - Underground Storage Tank Program
>
PR0232403
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:08:41 PM
Creation date
11/5/2018 11:21:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0232403
PE
2381
FACILITY_ID
FA0009790
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #7
STREET_NUMBER
1767
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07509036
CURRENT_STATUS
02
SITE_LOCATION
1767 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1767\PR0232403\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/031,93 04:44 $714'-l54 9800 MAJESTIC TECH " Z013 <br />8.3.5 <br />in emvloyeea may ne exDcaed to <br />hazards associated with the operation of <br />project. To control these hazards, the <br />requirements will be strictly enforced: <br />vehicle accident <br />vehicles during the <br />following safety <br />Seat belts shall be worn ANYTIME a vehicle is in <br />motion, regardless of speed or distance to be <br />travelled. Seat belt requirements also apply to the <br />operations of backhoe and other construction equipment <br />The basic speed law Shall be followed at all times. <br />vehicles shall be never be operated at a speed that is <br />not safe for the conditions (i.e., road surface. <br />traffic, visibility, weather, etc.). <br />OPEN EXCAVATION HAZARDS: <br />A Significant portion of the project involves the <br />uncovering. excavation, and removal of underground storage <br />Tanks and pipelines. As such, field personnel may be <br />exposed to several serious hazards associated with <br />excavation activities. <br />A primary initial hazard with excavation operations is <br />contact with underground utilities, including electrical, <br />gas, water/sewer, and chemical pipeline. To mitigate these <br />hazards, the Field Supervisor shall take the following <br />action during excavation operations: <br />Verify the exact location of each authorized excavation <br />prior to breaking ground. <br />- Make every attempt to determine the presence or absence <br />of any underground utilities in the region by <br />contacting Underground Services Alert, the Project <br />Manager, and/or local utility services. <br />Hand -dig the first two to three feet of the excavation <br />in areas where contact with utilities is possible or <br />unknown. <br />Arrange for the deactivation of utilities whenever <br />possible and appropriate for the circumstances. <br />An additional primary hazard associated with excavations is <br />exposure tO the open, excavated area, resulting in falls <br />and/er collapse. To mitigate this hazard, the following <br />safety actions shall be taken: <br />- No person shall be allowed to enter any excavation <br />greater than five feet deep, or less than five feet <br />deep when soil testing and conditions indicate that <br />soils are prone to movement. This SHP does not <br />address the entry into excavations that require <br />Protection prior tO entry. WARNING - If a change <br />the scope of work necessitaes entry into <br />excavations as described above, the SHP must be <br />updated by contracting Certified Industrial Hygienist <br />and approved by the Project Manager. <br />
The URL can be used to link to this page
Your browser does not support the video tag.