Laserfiche WebLink
LI <br />KI <br />J <br />izi <br />C, <br />0 <br />V) <br />E <br />0' <br />0 <br />J <br />E <br />0 <br />U) <br />d <br />0 <br />J <br />so a <br />rn E <br />a� <br />E <br />E; c <br />0' o <br />�o <br />� E <br />0 <br />o� <br />r <br />N <br />!N B <br />o, <br />c <br />o p� <br />N8 <br />N <br />C6 <br />N <br />a F.. <br />E <br />CL <br />�b <br />0 a` <br />ri A <br />Z <br />2 <br />3 <br />/ <br />4 <br />5 <br />TRASH ENCLOSURE <br />0 <br />U <br />8 <br />E <br />M <br />11 <br />12 <br />D1 <br />1' . 10'-0' <br />PARTIAL SITE PLAN <br />Bore nr WOPW CFF A5 <br />Al OVERALL SITE PLAN <br />l.. e0'-0 <br />1 2 <br />A/C PAVING- <br />(3D.5 <br />AVING <br />3.5 <br />I / <br />I <br />I Q' O <br />2.11 <br />O / 3.7 <br />2. <br />2. <br />A5 PARTIAL SITE PLAN <br />3 4 5 6 <br />7 <br />A/C PAVING) <br />3.5 <br />8 <br />ErG��h <br />PRE m �ad <br />V FA?otL -- o��a�t� <br />tAv\t_c,J(_lA � b_'C_ <br />tJ <br />10 <br />13 <br />KEY NOTES <br />im <br />15 <br />16 17 <br />T' GENERAL NOTES <br />18 <br />DIVISION <br />2 DEMOI,alOsl <br />1. <br />PIPING RUNS ARE SHOWN SCHEMATICALLY. BEST ROUTE SHALL BE <br />M <br />2.1 <br />SAWCUT, REMOVE AND DISPOSE OF ENTIRE CONCRETE TANK SLAB. EXCAVATE <br />DETERMINED IN FIELD BY CONTRACTOR. INSTALL ALL PIPING PER <br />MANUFACTURER'S INSTALLATION GUIDELINES, FEDERAL, STATE AND LOCAL <br />TO TOP OF (E) TANKS. <br />CODES. PLACE NEW PIPING IN EXISTING TRENCHES WHERE POSSIBLE. <br />2.2 <br />SAWCUT, REMOVE AND DISPOSE OF ENTIRE CONCRETE DRIVE SLAB. <br />2. <br />CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PROTECT EXISTING <br />2.3 <br />REMOVE EXISTING GASOLINE DISPENSER AND ALL ASSOCIATED EQUIPMENT. <br />� <br />UNDERGROUND STORAGE TANKS FROM DAMAGE OR FLOATING DURING <br />DISPOSE OF PER OWNER REQUIREMENT AND LOCAL REGULATIONS. (TYP. OF 9) <br />CONSTRUCTION. <br />2.4 <br />REMOVE ALL EQUIPMENT, RISERS AND SUMPS FROM EXISTING UNDERGROUND <br />3. <br />CONTRACTOR SHALL FIELD MEASURE ALL PIPING RUNS AND EXISTING TANK <br />BURY DEPTHS. CONTRACTOR SHALL CALCULATE AND CONFIRM THAT NEW <br />TANKS. SALVAGE SUBMERSIBLE PUMPS FOR REINSTALLATION. KEEP <br />J� <br />PIPING RUNS SHALL NOT FALL BELOW EXISTING TANKS TOPS. <br />LOCATION <br />CONTAINMENT COLLARS INTACT IF PRESENT. (TYP. ALL TANKS) <br />4, <br />CONTRACTOR SHALL CONFIRM AND SCHEDULE ALL INSPECTIONS REQUIRED BY <br />2.5 <br />EXCAVATE AND REMOVE ALL PRODUCT, VENT AND VAPOR RETURN PIPING. <br />LOCAL BUILDING DEPARTMENT, FIRE PREVENTION, ENVIRONMENTAL HEALTH, <br />LOCATION OF EXISTING LINES SHALL BE DETERMINED IN FIELD BY CONTRACTOR. <br />HAMMER LANE <br />AIR QUALITY DISTRICT AND ANY OTHER PERMITTING JURISDICTIONS. <br />2.6 <br />REMOVE EXISTING YARD LIGHT. (TYP. OF 2) <br />5. <br />ALL APPLICABLE EQUIPMENT INSTALLED UNDER THIS CONTRACT SHALL HAVE <br />L <br />2.7 <br />REMOVE PORTION OF EXISTING WOOD SHADE TRELLIS. <br />THIRD PARTY APPROVAL FROM AN INDEPENDENT TESTING ORGANIZATION. <br />2.8 <br />SAWCUT AS NECESSARY AND REMOVE PORTIONS OF CONCRETE SLAB. <br />6. <br />ALL NEW PIPING AND EQUIPMENT SHALL BE COMPATIBLE WITH THE MATERIAL <br />2.9 <br />REMOVE AND SET ASIDE YARD PAVERS DISTURBED BY NEW WORK (TYP.) <br />AUTO CENTER DRIVE <br />INTENDED TO BE STORED. <br />2.10 <br />REMOVE CONCRETE DISPENSER ISLAND. (TYP. OF 4) <br />7. <br />OMIT <br />f. <br />?I <br />2.11 <br />SAWCUT AND REMOVE PORTIONS OF CONCRETE ISLAND AS NECESSARY FOR <br />8. <br />ALL ELECTRICAL CONDUIT AND CONDUCTORS SHALL REMAIN IN PLACE AND <br />WORK. PROTECT EXISTING YARD LIGHT. <br />PROTECTED FOR REUSE, WHEN APPLICABLE <br />FtHL REVIEW <br />2.12 <br />REMOVE EXISTING KIOSK, FOUNDATIONS AND ELECTRICAL CONDUIT <br />9, <br />RHL DESIGN GROUP INC. SHALL NOT BE RESPONSIBLE OR HAVE CONTROL <br />DRIVE <br />CEN R <br />AND CONDUCTORS. <br />OR CHARGE OVER THE ACTS OR OMISSIONS, CONSTRUCTION MEANS, METHODS, <br />DR. BY: <br />TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR THE SAFETY PRECAUTIONS do <br />AUTO <br />MOM 3 OONCRETE/PAVINQ <br />PROGRAMS OF THE CONTRACTOR, SUBCONTRACTOR OR ANY OTHER PERSONS <br />PLANNING <br />PERFORMING THE WORK ON THE PROJECT. <br />3.1 <br />BACKFILL AS NECESSARY, FORM AND POUR NEW 8" THICK CONCRETE TANK <br />O.C. EACH WAY. CROWN NEW SLAB AT TANK <br />10. <br />CONTRACTOR IS RESPONSIBLE TO SEE THAT WORK IN FIELD IS DONE IN <br />K <br />SLAB WITH #3 REBAR AT 12" <br />ALL OTHER EXISTING GRADES. <br />ACCORDANCE WITH ALL CURRENT APPLICABLE NATIONAL, STATE do LOCAL CODES, <br />APPR.: <br />MANHOLES 1". MATCH <br />ORDINANCES AND REQUIREMENTS BY GOVERNING AGENCIES, WHETHER OR NOT <br />3.2 <br />BACKFILL FORM AND POUR NEW 6" THICK CONCRETE DRIVE SLAB WITH <br />SAID CODES, ORDINANCES, REQUIREMENTS, ETC. ARE SPECIFICALLY SHOWN ON <br />#3 REBAR AT 18" O.C. EACH WAY. MATCH EXISTING GRADES <br />PERMIT REVS <br />DRAWINGS. <br />3.3 <br />BACKFILLFOM AND POUR PORTIONS OF CONCRETE LAB REMOVEDFORWORK. <br />11. <br />CONTRACTOR SHALL PROTECT ALL EXISTING ITEMS AND FACILITIES TO REMAIN <br />MATCHON <br />THROUGHOUT CONSTRUCTION. CONTRACTOR SHALL REPAIR AND/OR REPLACE, <br />SHEET <br />CONSTRUCTION <br />SLAB AS NECESSARY <br />AT CONTRACTOR'S EXPENSE, ANY EXISTING ITEMS AND FACILITIES TO REMAIN <br />3.4 <br />BACKFILL AS NECESSARY AND REPLACE YARD PAVERS REMOVED BY WORK <br />Do not use drawing <br />THAT ARE DAMAGED BY CONTRACTOR'S OPERATIONS, TO THE SATISFACTION OF <br />PERFORMED. <br />THE OWNER'S ENGINEERS. <br />3.5 <br />REPLACE PORTIONS OF AC PAVING REMOVED OR DAMAGED BY WORK PERFORMED <br />12 <br />PRIOR TO EXCAVATION, GENERAL CONTRACTOR SHALL DETERMINE AND VERIFY <br />MATCH EXISTING AG -BASE, PAVING THICKNESS AND GRADES. PROVIDE <br />LOCATION OF UTILITY SERVICES IN ALL AREAS TO BE EXCAVATED. <br />3.6 <br />SMOOTH TRANSITIONS. <br />RE -STRIPE ALL YARD MARKINGS WERE AFFECTED BY WORK. <br />13. <br />CONTRACTOR SHALL COMPLY WITH ALL PERTINENT LAWS, CODES, REGULATIONS, <br />UBC, GOVERNING AGENCIES do MANUFACTURER SPECIFICATIONS, UNLESS GREATER <br />15 <br />3.7 <br />BACKFILL, FORM AND POUR PORTIONS OF CONCRETE ISLAND REMOVED BY WORK. <br />18 <br />REQUIREMENTS ARE INDICATED, AND/OR ARE NECESSARY FOR THE SAFETY OF <br />.1 <br />DOWEL NEW CONCRETE INTO EXISTING AS NECESSARY. <br />THE PROJECT. <br />3.8 <br />INSTALL NEW ACCESSIBLE CONCRETE RAMP AND LANDING PAD, SEE DETAIL, <br />14. <br />THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING <br />SHEET SD3 <br />JURISDICTIONS AS REQUIRED FOR INSPECTIONS AND SHALL PAY INSPECTION <br />DNIMN <br />5 METALS <br />FEES ASSOCIATED WITH THE WORK. <br />15. <br />THE GENERAL CONTRACTOR SHALL PROVIDE BARRICADES AND SAFETY SIGNS <br />5.1 <br />NEW 6" CONCRETE FILLED PIPE BOLLARD (TYP. OF 12). <br />PER OSHA REQUIREMENTS, AND PROVIDE TESTING OF ALL NEW AND MODIFIED <br />FUEL HANDLING AND ELECTRICAL SYSTEMS. <br />DMSION <br />13 SPECIAL CONST1 K (PEINLELIM) <br />16. <br />UNLESS STATED OTHERWISE ALL OTHER PROCEDURES, TESTING, MATERIALS AND <br />-MN <br />EQUIPMENT SHOWN ON THE PLANS SHALL BE INSTALLED BY THE GENERAL <br />13.1 <br />EXISTING DOUBLE WALL UNDERGROUND FUEL STORAGE TANK. <br />CONTRACTOR. <br />1- 12,000 GALLON TANK SPLIT 6,000 / 6,000 <br />17. <br />DRAWINGS SHOULD NOT BE SCALED. (N.T.S. INDICATES -NOT TO SCALE"). <br />1- 12,000 GALLON TANK SINGLE, COMPARTMENT <br />THE LISTED DIMENSION SHALL GOVERN, UNLESS OTHERWISE NOTED. <br />H <br />13.2 <br />INSTALL NEW 3+1 MUTLI-PRODUCT BLENDING DISPENSER WITH DIESEL PACKAGE. <br />18 <br />CONCRETE QUALITY AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH UBC <br />INSTALL HANGING HARDWARE, DISPENSER CONTAINMENT WITH LIQUID <br />CH. 26. <br />SENSOR, AND ALL OTHER NECESSARY EQUIPMENT (TYP. OF 3). <br />13.3 <br />INSTALL NEW 42'0 CONTAINMENT SUMP TO COLLAR. FIELD CUT SUMP AS <br />19. <br />CONCRETE SHALL HAVE AN ULTIMATE MINIMUM COMPRESSIVE STRENGTH OF 2,500 <br />NECESSARY FOR FIELD CONDITIONS. (TYP 6 LOCATIONS) <br />PSI AFTER 28 DAYS WITH SIX (§) SACKS OF CEMENT PER YARD OF CONCRETE. <br />13.4 <br />INSTALL NEW 36"0 STEEL MANHOLE AND SKIRT AT STP CONTAINMENT. (TYP. <br />20. <br />MATERIALS: <br />ALL PRODUCT TANKS) <br />A. CEMENT SHALL BE ASTM C150 PORTLAND CEMENT, TYPE II <br />13.5 <br />INSTALL NEW 36"0 MULTI -PORT FILL/PHASE 1 MANHOLE WITH VAPOR RETURN <br />(OR TYPE V IF SULFATES ARE PRESENT IN SOIL) <br />AND FILL SPILL BUCKETS, EXTRACTORS, FILL DROP TUBES, RISERS, AND ALL <br />NECESSARY EQUIPMENT REQUIRED BY C.A.R.B. EVR REGULATIONS. (TYP <br />B AGGREGATES SHALL COMPLY WITH ASTM C33 WITH A <br />OTHER <br />BOTH GASOLINE TANKS) <br />MAXIMUM SIZE OF ONE INCH (1-) <br />13.6 <br />INSTALL NEW 36"0 MULTI -PORT FILL MANHOLE WITH FILL SPILL BUCKET, <br />C. WATER SHALL BE CLEAN AND FREE FROM INJURIOUS <br />AMOUNTS OF OIL OR OTHER DELETERIOUS MATTER <br />VENT EXTRACTOR, FILL DROP TUBE, RISERS, AND ALL OTHER NECESSARY <br />Q <br />EQUIPMENT. <br />21. <br />ALL CONCRETE SHALL BE MIXED IN ACCORDANCE WITH ASTM C94 AND BE NATURAL <br />13.7 <br />INSTALL NEW VENT RISER ASSEMBLY WITH NEW P/V VALVES. <br />COLORED. <br />ATTACH TO BUILDING. <br />22, <br />ALL REINFORCING STEEL SHALL MEET THE REQUIREMENTS OF ASTM A615 GRADE 60. <br />13.8 <br />INSTALL NEW 2" 0 FIBERGLASS PRODUCT PIPING WITH 3" 0 SECONDARY <br />TOWARDS TANKS. (TYP.) <br />23. <br />THIS DESIGN IS BASED ON DRAWINGS AND INFORMATION PROVIDED BY THE FACILITY <br />CONTAINMENT. SLOPE LINES 1/8" PER FOOT MIN. <br />OWNER. EXISTING SITE CONDITIONS HAVE NOT BEEN FIELD VERIFIED BY RHL DESIGN <br />13.9 <br />INSTALL NEW DOUBLE WALL FIBERGLASS VENT LINES SLOPE LINES 1/8" <br />GROUP, INC. <br />PER FOOT MIN. TOWARDS TANKS. (TYP.) <br />13.10 INSTALL NEW DOUBLE WALL FIBERGLASS VAPOR RETURN LINES. <br />SLOPE LINES 1/8" PER FOOT MIN. TOWARDS TANKS. <br />13.11 <br />INSTALL NEW VEEDER-ROOT TLS -350 TANK MONITORING PANEL WITH INTEGRAL <br />PRINTER. MONITORING PANEL SHALL BE HARDWIRED AND PROGRAMMED TO <br />PROVIDE POSITIVE FUEL SYSTEM SHUT DOWN AT LEAK DETECTION, SYSTEM <br />F <br />FAILURE OR LOSS OF MONITOR PANEL POWER. EXACT LOCATION OF NEW PANEL <br />TO BE DETERMINED IN FIELD. <br />O+ SEE EQUIPMENT LIST SHEET SD2 <br />13.12 INSTALL NEW VEEDER-ROOT LIQUID SENSORS IN NEW CONTAINMENT SUMP. <br />PROVIDE ALL NECESSARY CONDUIT AND CONDUCTORS PER SENSOR <br />MANUFACTURER'S REQUIREMENTS. (TYP. OF 6) <br />PIPING LEGEND <br />13.13 INSTALL NEW VEEDER-ROOT MAG 1 AUTOMATIC TANK GAUGE AND ASSOCIATED <br />INSTALLATION AND FLOAT KIT. (TYP. ALL TANKS) <br />13.14 INSTALL NEW VEEDER-ROOT ANNULAR SPACE SENSOR AND 18"0 MANHOLE <br />D DOUBLE WALL DIESEL FUEL PIPING <br />AND COVER. (TYP. ALL TANKS) <br />RU DOUBLE WALL REGULAR UNLEADED PIPING <br />13.15 INSTALL NEW EMERGENCY PUMP SHUT-OFF SWITCH WITH NEW CONDUIT AND <br />CONDUCTORS. MOUNT SWITCH NO GREATER THAN 54" ABOVE FINISH GRADE. <br />SU DOUBLE WALL SUPER UNLEADED PIPING <br />E <br />LABEL PER UFC AND LOCAL FIRE CODES. <br />_ _ _ _ _ _ _ <br />-VR DOUBLE WALL VAPOR RETURN PIPING <br />13.16 IF NECESSARY INSTALL NEW 20A -408C FIRE EXTINGUISHERS, CABINETS AND <br />SIGNAGE PER LOCAL FIRE CODE REQUIREMENTS. <br />V DOUBLE WALL VENT PIPING <br />13.17 EXTEND EXISTING CONDUIT TO NEW DISPENSER LOCATION. NEW CONDUIT SHALL <br />MATCH EXISTING CONDUIT. INSTALL NEW CONDUCTORS PER DISPENSER <br />MANUFACTURER'S REQUIREMENTS. (TYP.) <br />13.18 INSTALL VEEDER-ROOT OVERFILL ALARM AND ACKNOWLEDGMENT SWITCH. ALARM <br />SHALL BE LOCATED IN DIRECT VIEW OF FUEL DELIVERY DRIVER DURING <br />OFF-LOADING PROCEDURES. PROVIDE NECESSARY CONDUIT. PROGRAM <br />MONITOR PANEL TO ACTIVATE ALARM AT 90% TANK CAPACITY <br />CALL BEFORE YOU DIG <br />"UNDERGROUND SERVICE ALERT" <br />IN NORTHERN CALIFORNIA IN SOUTHERN CALIFORNIA <br />1-800-642-2444 U.S.A. 1-800-422-4133 K4A W, DATE REV18110N8 IfVIIAL <br />VICINITY MAP SITE PLAN <br />FBI <br />B <br />A <br />STOCKTON AUTO CENTER CAR WASH <br />3434 EAST HAMMER LANE <br />Q <br />STOCKTON, CA <br />� <br />0 <br />SITE <br />��P4 <br />J� <br />LOCATION <br />HAMMER LANE <br />Al <br />ARCWZ=• &NGDUMG • SNMNMXM SE MCES <br />AUTO CENTER DRIVE <br />3001 DOQ.AS BLVD. STE. 210 R06EVLLE, CA 95661(916) 771-2555 <br />f. <br />?I <br />as= ICL bBRIAN F. aTA. ARCHITECT JAMES H. RAY. CIVIL ENGINEER <br />FtHL REVIEW <br />raTIAL <br />DATE DATE: 04/10/03 <br />PRELIMINARY <br />DRIVE <br />CEN R <br />DR. BY: <br />AUTO <br />Nam <br />PLANNING <br />STEEL BID <br />( 1' <br />APPR.: <br />BLDG PERMIT <br />GENERAL BID <br />RHL / 9013.60 <br />PERMIT REVS <br />SHEET <br />CONSTRUCTION <br />Do not use drawing <br />SID1 <br />construction <br />unless initialed <br />11 12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />FBI <br />B <br />A <br />