My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_1995 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:22:38 PM
Creation date
11/5/2018 11:29:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME: 72RCO 4H77D/q ADDRESS: 3515 <br />r5 C -14a m rn C,r- <br />SWEEPS# TAR/UL! TANK MODELpMTERIAL: <br />CAPACITY: L PRODUCT: R.E.H.S: �SYiC0kC3-- <br />INITIAL INSPECTIONS <br />A <br />I <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIM- BRINE(LIQUID ANNULAR): OTHER: <br />P <br />M <br />ALL TARE TO BE INSTALLED AND TESTED IN ACCORDANCE <br />4. PRIMARY TANK TEST: PSI: HRS/MIN- <br />P <br />I <br />WITH MARUFACTULER WRITTEN SPECIFICATIONS <br />5- TANK APPROPRIATELY PLACID WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />R <br />T <br />y <br />fr <br />O <br />I <br />NRS: <br />(COR 2635 (A)) <br />V <br />A <br />BALL FLOUT VALVES INSTALLED ��U.1 c%o* <br />9. <br />E <br />L <br />17. <br />/ <br />D <br />S <br />OVERSPILL PERFORMANCE TEST <br />a. <br />(CCR 2635 (A) (4)) <br />'I q 1 <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />1. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR 2635 (A) (5)) <br />(COR 2635 (B)) <br />20. <br />UST PLANS SUBMITTED/ FEES PAID (H -S CODE 25287, CCR 2635 (D) (8) <br />(CCR 2632 (E) (1) (2)) <br />('� <br />L <br />2. BST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />V-49., 6 PIPING INSPECTIONS LI L 7 c) t-1 Sq! P '�011CO <br />2 <br />✓ <br />LI <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIM- BRINE(LIQUID ANNULAR): OTHER: <br />I/ q QS <br />(CCR 2635 (8) (4)) <br />O <br />4. PRIMARY TANK TEST: PSI: HRS/MIN- <br />(CCR 2632 (A) (2)) <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PS11L <br />5- TANK APPROPRIATELY PLACID WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />V-49., 6 PIPING INSPECTIONS LI L 7 c) t-1 Sq! P '�011CO <br />2 <br />✓ <br />LI <br />1 6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIM) <br />I/ q QS <br />(CCR 2635 (8) (4)) <br />O <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PS11L <br />NRB/ W515� OFM. <br />(CCR 2635 (A) (4)) <br />3 G <br />y <br />fr <br />8. <br />LAO= TEST ON ALL SLAPS (24 MR. NININUN) <br />NRS: <br />(COR 2635 (A)) <br />16. <br />BALL FLOUT VALVES INSTALLED ��U.1 c%o* <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />(COR 2635) <br />17. <br />/ <br />(CCR 2635 (E) (2)) <br />10. <br />OVERSPILL PERFORMANCE TEST <br />a. <br />(CCR 2635 (A) (4)) <br />'I q 1 <br />1. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR 2635 (A) (5)) <br />(COR 2635 (B)) <br />I FINAL INSPECTION <br />'� QS <br />12. <br />PERFORMANCE TEST FOR 'ALL' MONITORING PROBES <br />(CCR 2632 (C) (2)) <br />I/ q QS <br />13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />V/ <br />14. <br />PERFORMANCE TEST OF LIME LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />�� (, (js' <br />✓ <br />15. <br />PERFORMANCE TEST OF AUTOMATIC POP SYSTEM SHUT-OFF <br />(CCR 2635 (B) (5)) <br />16. <br />BALL FLOUT VALVES INSTALLED ��U.1 c%o* <br />(CCR 2635 (B) (6)) <br />17. <br />OVERFILL PROTECTION INSTALLED/APPROVED <br />(CCR 2635 (E) (2)) <br />II/9 A S' <br />a. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />19• <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) (1) (2)) <br />('� <br />✓ <br />21_ <br />'C' FORM COPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />(�I�2. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR 2641-2644) <br />23_ <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />(M+S CODE 25284 (E) (F)) <br />EH23-006 3/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.