My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_1995 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:22:38 PM
Creation date
11/5/2018 11:29:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e� �^ ( ., <br />TAIT 8 ASSOCIATES, INC. <br />Consulting Engineers Civil • Planning • Surveying • Environmental <br />March 23, 1995 <br />FedEx <br />UST Permit Manager <br />San Joaquin Co. PHS EHD <br />445 N. San Joaquin Street <br />Stockton, CA 95201 <br />RE: ARCO Facility 5569 <br />3518 Hammer Lane, Stockton, CA. <br />Tait Job AR -652 <br />Dear UST Specialist <br />On behalf of ARCO Products Co., Tait & Associates is pleased to <br />submit the following items for Piping Only Removal and Piping Only <br />(UST) Installation Permits. <br />A check in the amount of $858.00 (See fee worksheet). <br />Piping Only (UST) Removal <br />1. 3 sets of plans <br />2. UST Removal Application (in triplicate) <br />Piping Only (UST) Installation <br />1. 3 sets of plans & equipment outsheets <br />2. UST Installation Application'(in triplicate) <br />3. S.W.R.C.B. Form A & B - Piping Only <br />The focus of this project is to replace all product, vapor recovery <br />and vent piping, as well as some tank top equipment. Dispenser <br />spill containment boxes will also be installed at this time. <br />Should any questions arise during your review of <br />don't hesitate to contact me at this office. Thank <br />assistance. <br />Respegkfully <br />TAI ASSOCIATES <br />ZiKomas Schoenstein <br />Project Architect <br />this project, <br />you for your <br />U <br />enc: as noted <br />cc: Ken Lanz, ARCO Products Co., (w/enc.) <br />Jim Martin, ARCO Products Co., (w/enc.) <br />Kyle Christie, ARCO Products C., (w/enc.) <br />1001 Galaxy Way/ Suite 404 /Concord, CA 94520 / (510) 680-6800 / (510) 680-7878 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.