My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_1995 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:22:38 PM
Creation date
11/5/2018 11:29:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR ACTIVE SIPHON CONNECTION <br />REMOVE 2" PIPE CAP & INSTALL <br />BLACKSTEEL UNION & OTHER <br />HIGH POINT IN SIPHON SYSTEM FITTINGS AS SHOWN TO CONNECT <br />TO 4"x2" DOUBLE TAPPED BUSHING 2" TEE OR ELBOW (ACTIVE CONN.) , <br />SEE DETAILS #6 & #7 THIS - <br />2 " SHEET FOR TURBINE & PASSIVE <br />NEW 2UNION SCR'D <br />NEW TEEL END CONNECTIONS <br />BLA3" BULK HEAD FITTING 22 2 <br />- NEW 3/8" O.D. 2" VENT LINE 22 BULKHEAD FITTING <br />COPPER TUBING TO' <br />TURBINE SIPHON CHECK n 3" BULK HEAD FITTING 22 <br />VALVE / NEW 2" NIPPLE <br />NEW TUBING BLACKSTEEL 3" FIBERGLASS 20 3/8" O.D. \ <br />FITTING 3/8"X 2" 3" FIBERGLASS 20 - PIPE (SECONDARY) TUBING \� 11 2" BLACK STEEL SCREWED CAP <br />MPT - PIPE (SECONDARY) NEW 2" 90 BLACKSTEEL DEG. ELL - - - - I' - _ _ <br />i TO PUMP \\ (TYP AS REQUIRED) <br />NEW 2" TEE SCR'D 1 r - -- - - - �'Y _t _ _ - - SIPHON BODY \\ <br />BLACKSTEEL I -�-- L _ NEW 2" NIPPLE - f \\ 2" PLUG <br />�. BLACKSTEEL ! 2" FIBERGLASS 21 \11 <br />2" FIBERGLASS 21 I PIPE (PRIMARY) <br />PIPE (PRIMARY) I I II <br />I I FOR ACTIVE SIPHON CONNECTION I I 27 BELL X MNPT 0 <br />REMOVE 7 PIPE CAP & INSTALL F.G. ADAPTOR <br />BLACKSTEEL UNION & OTHER I I I d II 2" BLACK STEEL TEE <br />FOR ACTIVE SIPHON I FITTINGS AS SHOWN TO CONNECT FOR ACTIVE SIPHON I II <br />REMOVE 7' PLUG IN I I TO 4"x2" DOUBLE TAPPED BUSHING REMOVE 2" PLUG IN I I FIBERGLASS TANK <br />DBL. TAPPED 2"x4" DBL. TAPPED 2"x4' RISER (REF) // 2" UNION <br />HEX BUSHING HEX BUSHING 1 // <br />// 11 <br />3"x7' TEST REDUCER <br />3"X2" TEST REDUCER 11 I 2" VAPOR 40"xt5"x18"D FIBERGLASS <br />RECOVERY I CONTAINMENT EXTENSION <br />42 I INTEGRAL TO SUMP. SEE <br />NOTE: ACTIVE CONNECTION SHOWN 1 20 DETAIL #9 THIS SHEET <br />NOTE ACTIVE CONNECTION SHOWN 2 <br />BY DASHED LINES BY DASHED LINES 21 (TYP.) <br />Plan View <br />End Tank Connection for <br />End Tank Connection For <br />Turbine Side of Siphon System Passive Side of Siphon System 3/8" O.D. COPPER <br />__- _ "' TUBING TO TURBINE <br />NOT TO SCALE: SIPHON CHECK VALVE <br />NOTTO SCALE: _ <br />— ..,... �— � �__ — —� q --:aa •—..-- Tom— --T+o <br />(4) 10,000 GALLON DOUBLE-WALL GASOLINE STORAGE TANKS 8 9 <br />TO DISPENSERS <br />SEE DWG. TK1-1 <br />FOR SITE SPECIFIC 2" VENT RISERS SEE SEAL OFF <br />DISPENSER ISLAND / / \ / \ / \ DWG. TK1-I FOR <br />LAYOUT i I i i I \ I i `� I SITE SPpECIFIC LOCATION <br />I I I 4vpq <br />I i I I I I I IIII 3/4" GOND. <br />TO TURBINE <br />I V <br />— --LID WITH LIFT <br />56 HANDEL I I I I IIII <br />' EC -1 REG./I I UNLEADED I I UNLEADED I I SUPER <br />I MID -GRADE I 1 #1 1 1 #2 1 1 UNLEADED/11 <br />I EXTRA I I I I (PASSIVE) I I EC -PREM. I ITj j 7' BUCK STEEL TEE <br />II I SEE PRODUCT( I I I IIII L <br />�15" Ii a I I II 1I PIPING DESIGI <br />I ilii <br />EENOTE BELOW $R <br />2" COMPRESSIBLESEE S�HON 25-l' 2- <br />1 I I <br />iF .f FOAM 80ARD SPACER I I 1 PIPING DESIGN IIII 40'x25-1/2"x18"D FIBERGLASS <br />1INACTIVE I ACTIVE I I <br />NOTE BELOW IIII CONTAINMENT EXTENSION <br />Plan View 12 SIPHON I 1 2" SIPHONI I I I IIII 0 INTEGRAL TO SUMP. SEE <br />I I I I I I I I I I I 1 DETAIL #9 THIS SHEET <br />NECKDOWN SECTION III I / I I / t �� �'AI1 f -2" FIBERGLASS <br />'( i 1 i i 1 i t I I 1 I I IIII VENT LINES <br />�Jt�p`'y� � I <br />1'14 iv( "c.i� r IIII 2" BELL & FNPT <br />—�_--_ / --- 11 ADAPTOR <br />�I <br />NECKDOWN SECTION— <br />WITH <br />ECTION III ( r I — <br />WITH LID 32" <br />A� \O I I LI L-- -------------- ------ j <br />' 46" INDICATES PHYSICAL END TANK SIPHON CONNECTION (TYP. 2) <br />BREAK AND CAPPED SEE DETAILS #6 & #7 THIS SHEET NOTE: ALL PIPING SHOWN IN SOLID FOR CLARITY <br />3" FIBERGLASS FUTURE SIPHON LINES FOR FUTURE ACTIVE & PASSIVE <br />VAPOR RECOVERY UNE SEE DETAIL #8 THIS SHEET SIPHON HOOK—UP DETAILS NOTE: ACTIVE TURBINE END OF SIPHON <br />SINGLE WALL SHOWN, SEE DETAIL #7 THIS SHEET <br />FOR PASSIVE CONNECTION (LESS <br />7' SIPHON LINES TO SLOPE UP 1/4" PER FOOT FROM DOUBLE WALL PIPE) <br />- 2" FIBERGLASS EC -1 REGULAR/MID—GRADE EXTRA TO SUPER UNLEADED/ SHOWN FOR FIBERGLASS. STEEL SIMILAR) <br />PRODUCT LINES EC—PREMIMUM TANK. SEE DETAIL #8 THIS SHEET FOR TURBINE <br />DOUBLE CONTAINED END ACTIVE CONNECTION <br />M 1 N <br />_ SIPHON PIPING DESIGN NOTE: / Siphon Piping at Center Tanks <br />IT IS THE INTENT OF THE SIPHON SYSTEM DESIGN TO PROVIDE FUTURE VERSATILITY OF VARIOUS SIPHON CONFIGURATIONS. / p <br />'L v <br />48, 40" 3 PRODUCT FACILITIES SHALL HAVE: (2) UNLEADED -TANKS, (1) SUPER. UNLEADED/EC-PREMIUM TANK & (1) EC -1 REGULAR/ SCALE: 1"=1'-0' <br />MID -GRADE EXTRA TANK. THE (2) UNLEADED TANKS SHALL BE SIPHONED TOGETHER & THERE SHALL BE INACTIVE SIPHONS <br />1t`// INSTALLED BETWEEN THE UNLEADED #1 & EC -1 REGULAR/MID-GRADE EXTRA TANK AS WELL AS BETWEEN THE UNLEADED #2 <br />48' DIA: FIBERGLASS SUMP' AND SUPER UNLEADED/EC-PREMIMUM TANKS FOR POSSIBLE FUTURE RECONFIGUATION OF PRODUCTS STORED. <br />FOR ACCOMODATING SIPHON PIPING <br />AT MIDDLE TANKS <br />Side View Isometric View PRODUCT PIPING DESIGN NOTE; <br />FOR FACILITIES THAT HAVE (8) "UNLEADED" HOSES, THE "PASSIVE" UNLEADED TANK SHALL NOT HAVE A TURBINE INSTALLED, <br />—� FPO FACILITIES THAT HAVE MORE THAN (8) "UNLEADED" HOSES, A TURBINESHALLBE INSTALLED AT THE "PASSIVE" <br />UNLEADED TANK. THE TWO TURBINES $HALL BE MANIFOLDED TOGETHER AS�SHOWN. 2" CHECK VALVES SHALL BE <br />INSTALLED IN THE PRODUCT LINES INSIDE THE SUMPS FOR BACKFLOW PREVENTION. <br />t <br />DATE R E <br />Sump Riser For Middle Tanks Typical Piping_ A ISSUED FOR PLAN CHECK <br />15 1 G N $ <br />at Turbine Side (Siphon Piping) Arrangement at Tanks <br />NOTTO SCALE NOT TO SCALE: <br />4VA <br />O C <br />ClNO <br />C <br />E <br />r <br />J <br />0 <br />m <br />_,, <br />Y/ <br />0 <br />O. <br />N <br />C <br />T <br />c`v <br />�'vl>0 <br />tm <br />C <br />G <br />(.' <br />U2w <br />O <br />0) <br />40 <br />m <br />O+ <br />to <br />`od <br />mU <br />4VA <br />O C <br />'4) <br />® <br />C <br />J <br />5 <br />LO <br />O <br />c`v <br />O <br />tm <br />x <br />G <br />(.' <br />fi <br />O <br />CL <br />LAW <br />W <br />® <br />C <br />J <br />c`v <br />x <br />G <br />fi <br />O <br />CL <br />m <br />O+ <br />J <br />w <br />a <br />� <br />ow <br />U <br />N <br />W <br />� � <br />• <br />Q <br />7 o <br />2 <br />U <br />U <br />• <br />1 <br />W o <br />Z I w <br />z <br />U <br />LL <br />ally <br />W z <br />Sam <br />rs <br />c <br />UW <br />L <br />CLC <br />ca a <br />2 C <br />I = Co <br />Z a� <br />app: 3194 <br />L.S. ANDREWS <br />date drawn by <br />3-1-94 SHK <br />sheet / file <br />TK3-2 <br />A of <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.