My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_2000 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:30:07 PM
Creation date
11/5/2018 11:31:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� O <br /> roductsCompany � O <br /> ° � <br /> 0 C � 0 <br /> Ow Q <br /> Dispenser and Piping Replacement U <br /> .;n ,,o cd ) h <br /> U <br /> 65 ,rn <br /> 0 <br /> 3515 E HANIiVtER LY <br /> COMPLIANCE NOTES: DRAWING LIST _ Q O <br /> - (q <br /> ARCO ANI I'M T-1 — COVER SHEET (0 <br /> ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR C <br /> REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT Cl-1 — DEMOLITION PLAN +'' O <br /> CONDIrIONS FOR UST INSTALLATION: LOCATIONS. U <br /> CA1—1 — MISCELLANEOUS SITE DETAILS <br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE TK-1 — PETROLEUM PIPING PLAN L <br /> I Notify fire dept. FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO CC <br /> 2 All deviations from approved plans must be approved by THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE TK-2 - EXISTING DOUBLE WALL FIBERGLASS TANK <br /> PHS/EHD. PROCEEDING WITH THE WORK. TK3-1 — SUMP AND VENT PIPING INSTALLATION DETAILS U <br /> 3 Pump shut down must satisfy all conditions listed on Title 23 <br /> CCR 2636 (g). <br /> GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DMSION OF TK3-2 — SIPHON PIPING INSTALLATION DETAILS <br /> 4 All inspection must be scheduled 45 has. in advance. INDUSTRIAL SAFETY, STATE OF CALIFORNIA FOR EXCAVATIONS OF TRENCHES <br /> 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. TK3-3 - PIPING INSTALLATION DETAILS AT <br /> 5 No water well can be within I50' of an underground tank. If MULTI-PRODUCT DISPENSERS C G <br /> water well exist on site notify GILD immediately. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING TK3-4 - TYPICAL MULTI-PRODUCT DISPENSER INSTALLATION se <br /> 6 All interstitial monitors most perform according to AGENCY PRIOR TO TANK INSTALLATION. 711 <br /> manufacture's standards, and must be tested annually in TK3-5 - TANK SLAB, IDENTIFICATION MARKING a. <br /> accordance with section 2630 (d), California Cade of TANK SYSTEM TO BE INSPECTED BY GOVERNING AGENCY AND ARCO ENGINEER AT TK4-1 - VEEDER-ROOT LEAK DETECTION Cd <br /> Regulations (CCR), 'Title 23 Waters, Division 3, Chapter 16. FOUR (4) SEPARATE CONSTRUCTION PHASES AS REQUIRED: <br /> 7 All corrodible piping if in direct contact with backfill material; AND DISPENSER WIRING DIAGRAM <br /> shall be protected against corrosion as specified in -Title 23 1. PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 (WAYNE 2/V580) <br /> 2636 (b). MINUTES. TK4-2 — TANK ELECTRICAL SCHEMATIC DIAGRAM ^C^` <br /> 8 Existing pipingvent lines may be left is place if they are 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN TK4-3 - MATERIAL LIST, ABBREVIATIONS, W `� <br /> uncovered and inspected by EHD to confirm they are corrosion ACCORDANCE WITH MANUFACTURER'S GUIDELINES. <br /> protectcdandstnicturallysound. Lines must pass pressure test TANK ORIENTATIONS AND GENERAL NOTES. <br /> as any new line, or be replaced with new piping. 3. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE W p <br /> 9 I)ispenscr pans must be UL listed, and less than 6 inches deep HYDROSTATICALLY TESTED WITH STANDING WATER FOR A PERIOD OF 24 HOURS <br /> or must be provided with a monitoring probe. TO INSURE THAT THAT THE SUMPS ARE WATERTIGHT. THE ARCO FIELD ENGINEER U <br /> 10 A, B and C forms must be submitted to EHD prior to operation MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION TEST CHECKLIST (a <br /> of the tank system. BEFORE CONTRACTOR WILL BE PAID. <br /> I 1 Monitoring and Response Plans must be submitted to EHD 4. FINAL INSPECTION, INCLUDING ALL PORTIONS OF THE LEAK DETECTION <br /> prior to operation of the tank system and, one copy kept at the SYSTEM. <br /> facility. <br /> 12 Piping installation instructions for AO Smith must be available TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS <br /> at the job site. FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM ✓ <br /> BEING PLACED IN OPERATION. z <br /> Please call, Vidal Pedraza at 209-468-0333, if you have any ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE C d <br /> questions or concerns regarding these conditions. Thank you. AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING <br /> AUTHORITIES. T <br /> GENERAL NOTES: (� <br /> 8t�Vi Ntw� i;"i is s�lM DP ISroa C z <br /> A. ALL TANK AND LINE INSTALLATIONS SHALL BE PERFORMED AS SHOWN ON <br /> 1; t yn tur A,r T'n`.rd Floor (� Q <br /> p,l},);1,>, q ✓ 4wr;aton CA $5201-0388 ARCO TANK DRAWINGS (TK-SERIES) AND ARCO MASTER CONSTRUCTION � ±a <br /> rhoPte ('2G9) 4&8.342U SPECIFICATIONS (SECTIONS RELEVANT TO THIS PROJECT). E <br /> W -f+ E <br /> MA ,99 B. THESE PLANS ARE DIAGRAMMA11C IN NATURE AND ARE NOT INTENDED TO W�I r u: :aed rviih Ch8ng2s: See pernatks BE AN EXACT REPRESENTATION OF THE FINAL PRODUCT, GENERAL CONTRACTOR W 2 <br /> SHALL RELOCATE MODIFY, OR ADJUST TO PROVIDE A SYSTEM CONSISTENT <br /> ;toyed: 360 FFienme" �7 ,J NTH THE INTENT OF THE DESIGN. THE GENERAL CONTRACTOR SHALL PREPARE u <br /> AS-BUILT PLANS AT THE COMPLETION OF THIS JOB. 4/ Q_ <br /> C. INSTALL CONDUITS AND CONDUCTORS AND/OR PULL ROPES FOR PUMPS U 000 0 o <br /> AND MONITORING EQUIPMENT AS SHOWN ON ELECTRICAL DRAWINGS. ALL O a <br /> Jc�,.(� CONDUITS LEAVING CLASS HAZARDOUS AREAS SHALL BE SEALED PER N.E.C. In F" <br /> —8y 1 AND LOCAL REQUIREMENTS. � co (J) V@ <br /> F ;,,WVal of these plans extends only to that <br /> 1tily iu shown and described hereon but D. ARCO SHALL PERFORM LINE TESTING AND AIR QUALITY TESTING. <br /> . .ark 1101 authorize Or approve any omission CONTRACTOR REPRESENTATIVE SHALL BE PRESENT DURING TESTING, <br /> r. r,n3.tlon of requirements of State laws or <br /> Lmual QrdlnanCes. E. FENCE JOB SITE WITH 6 FT. HIGH CHAIN LINK FENCE DURING <br /> CONSTRUCTION. <br /> N <br /> F. UTILIZE EXISTING ELECTRICAL/SIGNAL CONDUIT WHEREVER POSSIBLE. N n <br /> REPLACE/ALTER/INSTALL NEW CONDUIT AS REQUIRED. REPLACE DETERIORATED z N m <br /> CONDUIT AS REQUIRED. x tS <br /> d U 11 <br /> G. ALL IMPROVEMENTS ARE EXISTING AND TO REMAIN UNLESS NOTED m o <br /> OTHERWISE. PROTECT FROM DAMAGE DESTRUCTION. y aoo N N <br /> H. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES. AND REGULATIONS. a <br /> t- z ala i2 <br /> I. INSTALL EXPANSION JOINTS (E.J.) AND CONTROL JOINTS (C.O.) IN ALL NEW a V Mal <br /> CONCRETE WORK ASSHOWNAND REQUIRED. <br /> - master release dote <br /> J. CIRCUIT DISCONNECTS TO OR THROUGH THE DISPENSING PUMP SHALL <br /> PO <br /> DISCONNECT ALL CONDUCTORS, INCLUDING ANY GROUNDED CONDUCTORS PER <br /> N.E.C. 514-5. <br /> K. IF STRONG ODOR OF GASOLINE OR DIESEL FUEL IS PRESENT IN EXCAVATED No. DATE REVISIONS PROJECT RELEASE praj, exe. drawn by--- ------ ---- - - 3/ip/ci0. J.V. <br /> MATERIALS, STOCKPILE CONTAMINATED MATERIALS ON PLASTIC FILM AND COVER PERMIT _ <br /> WITH SAME. NOTIFY ARCO ENVIRONMENTAL ENGINEERING FOR DISPOSAL. al-- t / facility <br /> COORDINATE ALL ENVIRONMENTAL MATTERS WITH: PAUL SUPPLE, ARCO <br /> ENVIRONMENTAL ENGINEERING. PHONE: (510) 299-8891. PROVIDE ALTERNATE BID 5569 <br /> BID ITEM: UNIT COST ($/CUBIC YARD) FOR OVER-EXCAVATION WORK. -- <br /> CONST. sheet 7 file <br /> AS-BUILT of <br /> '. u4til( 1F ;fiRb,-'7b.'%;�N.G1d7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.