My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_2000 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:30:07 PM
Creation date
11/5/2018 11:31:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANHOLE C-H GRFX WITH Ad kk <br /> I�+---MANHOLE f C-H GRFX WITH CONCRETE 2 CORD GRIP COVER AND GASKET <br /> CONCRETE I 2 CORALS GRIILIED COVER AND GASKET SLAB SEALS SENSOR ED WEATHERPROOF UNCTIONX <br /> gL,gg WEATHERPROOF JUNCTION BOX <br /> WITH SENSOR JUNCTION BOX <br /> OY SEAL <br /> EPDXY SEAL PER XNFPAA T �Y'{�' - <br /> PER NFPA SPEC �" G. ,> O <br /> SPEC - V (J M <br /> TO LEAK DETECTION MONITOR PANEL TO LEAK DETECTION MONITOR PANEL C <br /> 2 CONDUCTOR #18 SHIELDED CABLE Z 2 CONDUCTOR #18 SHIELDED CABLE V <br /> LEADER IN RIGID METAL CONDUIT. s 2 WIRE CABLE IN RIGID METAL CONDUIT. 0. U <br /> CABLE- 2 WIRE CABLE as 4" API PIPE = •SCHEDULE 40 5 0 <br /> •� <br /> 14" DIA. RISER •Q <br /> SPLICE 1 FT. FROM <br /> BOTTOM OF RISER PIPE / \ <br /> LIP <br /> W <br /> v <br /> SENSOR <br /> MUST REACH H I MAGNETOSTRICTIVE PROBE •�"'� G � � <br /> SENSOR BOTTOM OF TANK C O C <br /> ((0 <br /> O o <br /> FIBERGLASS TANK �.. I <br /> / . 0 <br /> FIBERGLASS TANK( - CL CV <br /> SEE INSET MEW OF SENSOR SWITCH - (Q <br /> AT BOTTOM OF TANK U <br /> WACS /1 <br /> 0 <br /> L <br /> <( U <br /> INSTALLED ONLY IF REQUIRED d <br /> ANCAI_E <br /> ular Sensor Installation Tank Gauging Installation cc <br /> : <br /> EQUIPMENT SCHEDULE Leak Detection System Notes J <br /> 1. WARNING: .}..r <br /> MONITOR SENSOR & PROBE WIRING IS INTRINSICALLY SAFE WIRING AND MUST BE C <br /> „ SEPARATED FROM ALL OTHER WIRING AND INSTALLED IN SEPARATE DESCRIPTION CONDUIT. <br /> ITEMQTY87 OCTANE 87 OCTANE 87 OCTANE 92 OCTANE MAXIMUM CABLE LENGTH BETWEEN MONITOR CONSOLE AND SENSORS IS 1,000 FEET. <br /> NO. REQD UNLEADED UNLEADED UNLEADED UNLEADED <br /> #1 #2 #3 PREMIUM 2. WARNING: <br /> _ 2 TO MAINTAIN INTRINSIC SAFETY, THE JUNCTION BOX MUST I, <br /> GROUND ROD O 1/2" X 8' LONG CONTINUOUS TK4-2 CONTAIN ONLY WIRE SPLICES. (V <br /> 1 INSTALL OUTSIDE - COPPER CLAD GROUND ROD . . CAUTION: / <br /> FOR SITES WITH MORE 12 3 120, VAC WIRING MUST NOT BE CONNECTED TO LOW VOLTAGE V <br /> OF TANK EXCAVATION FUELING POSITIONSA A A A CONNECTIONS. DAMAGE FROM MISWIRING IS NOT COVERED BY (� <br /> IN NATIVE SOIL STRANDED AWG BARE COPPER GROUND [BROWN BOX TK4-2 3/4"C, (1) #18-2 THWN <br /> WARRANTY. <br /> (:D2 WI(TYP.) 4 (TYP.) WIRE. PROVIDE TERMINAL CONNECTORS AT _ <br /> U-8017 CONNECTIONS <br /> TURBINE VEEDER ROOT TLS-350 SHIELDED 4. INSTALL TANK MONITOR SYSTEM PER MANUFACTURER'S INSTALLATION <br /> INSTRUCTIONS. <br /> RELAYTTS LEAK DETECTION <br /> CADWELD y4 CABLE TO -, MOrvNITOORR C C C C 5. INSTALL METAL CONDUIT OR RACEWAY FOR MONITOR CONSOLE POWER FROM L <br /> 3 GROUND ROD •T " CONNECTOR J THE POWER PANEL TO THE MONITOR PANEL LOCATION. CONDUIT MUST <br /> ® MOLD PART NO. GTC-151L, I i -CROUSE-HINDS GRFX SERIES ALIGN WITH THE DESIGNATED POWER KNOCKOUT. <br /> - O (TYP.) WELD METAL #90 i WITH GASKET AND BLANK 0) Z Q <br /> COVER OR EQUAL. 6. RUN RIGID METAL CONDUIT FOR PROBE AND SENSOR WIRING FROM <br /> (TYR. 8 PLCS) THE MONITOR CONSOLE TO THE LOW VOLTAGE WIREWAY. CONDUIT MUST ENTER C Q <br /> U SURNDY III YGHC2C2 THE MONITOR CONSOLE WHERE KNOCKOUTS ARE PROVIDED. NO OTHER CONDUIT '� U <br /> o (0 6 (TYF.) COMPRESSION GROUND TAP 7 SEE TK4-1 FOR 3/4"C, (2) #18-2 THWN+ <br /> ENTRY IS PERMITTED. ALWAYS KEEP PROBE AND SENSOR WIRING IN A SEPARATE -J ++ <br /> 3 ( ) SPECIFIC WIRING SHIELDED CONDUIT OR WIREWAY FROM ALL OTHER WIRING. O QS <br /> O_ 7. ALL U.C. CONDUIT TO TANKS & DISPENSERS SHALL 13E RIGID GALVANIZED (RSG) GG <br /> FILL SIDE SUMP TYP,) LIQUID TIGHT CONNECTOR, OR PVC SCH. 40 AND SHALL BE BURIED 0 24" MIN. WITH FINAL 24" TO ANY Q� <br /> ( ENVIRON FEB-3075 4 1 LOCATION TO BE RSG. ALL OTHER FITTINGS TO BE GALVANIZED STEEL. <br /> 87 OCTANE 87 OCTANE 87 OCTANE 92 OCTAN B TB <br /> B -G 0 <br /> BOND GROUND WIRE TO TK4-2 W V <br /> UNLEADED UNLEADED UNLEADED UNLEADED ALL METALLIC RISERS 8, WIRING BETWEEN PROBES, SENSORS AND THE MONITOR CONSOLE IS DESIGNED C 'r� m <br /> #1 #2 #3 PREMIUM AS REQUIRED (TYP.) 4" DIAMETER BRONZE GROUND CLAMP WITH SUCH THAT ELECTRICAL POWER TO THE PROSE AND SENSOR WIRE IS ��,,{{ z vJ <br /> SEE BONDING DETAIL CEDANCHORING PLATE AND DOUBLE HEX NUTS 18 TURBINE SUMP (TYP.) LIMITED SO THAT THERE IS INSUFFICIENT ENERGY PRESENT TO IGNITE CV < <br /> EACH SIDE FOR GROUND WIRE TERMINAL THE FUEL. TO MAINTAIN THIS SAFETY FEATURE, PROBE AND SENSOR � �� 0 <br /> o O O o CONNECTIONS OREQUAL <br /> CROUSE—HINDS EYS2 WIRNG.IRES MUST <br /> NEVERERUNINSTALLED <br /> THESE WIRES SEPARATE <br /> THECSAMEICONDUIT ORALL <br /> WIRING U E <br /> ^^`` U <br /> 0 0 O 0 TURBINE SIDE �'� (TYP. 12 PLCS.) TROUGH AS POWER WIRES. W W 4 <br /> 0 0 0 o SUMP (rrPJ `=�� T&B IN RELIEF 8 9. INSTALL A WEATHERPROOF ELECTRICAL JUNCTION BOX WITH z <br /> ' <br /> 344"C, 3) #18-2 TIHWN+ GASKETED COVER ON THE END OF EACH CONDUIT RUN AT THE PROBE C O r <br /> 1"C, (12) #18-2 THWNSHIELDED AND SENSOR LOCATIONS. GASKETING OR SEALING COMPOUND MUST //���� F- a <br /> SHIELDED BE USED AT EACH ENTRY TO THE JUNCTION BOX TO ENSURE A W Q �[ W <br /> TTERMINAL CONNECTION #18-2 THWN' WATERPROOF JUNCTION. NEC DOES NOT REQUIRE THESE JUNCTION BOXES = u <br /> TO BE EXPLOSION PROOF CLASS I DIVISION 2 RATED (SEE NOTE N8). U �Cc <br /> �f4 STRANDED AWG 10. PULL TWO CONDUCTOR 100% SHIELDED CABLE, THWN O C, BETWEEN THE MONITOR AND EACH PROBE AND I•'� <br /> ` ' SHIELDED SENSOR LOCATION. SINCE UP TO FOUR PRO13ES AND EIGHT C0 <br /> Plan View CONDUIT FILLS SHOWN ASSUME TANK GAUGING INSTALLED. SENSORS WILL BE WIRED THROUGH THE CONDUIT, BE SURE TO USE A <br /> ANCHORING PLATE If TANK GAUGING IS NOT INSTALLED, ROUTE 3/4 CONDUIT LOOP DIFFERENT COLOR CODE FOR EACH CONNECTION. (ABEL OR COLOR <br /> F1 ALL FIELDED WIRING TO ENSURE POLARITY. <br /> NOT TO SCALE: WITH PULL ROPE BETWEEN FILL SUMPS AND CUTE TO BUILDING / <br /> 4" DIA. BRONZE -{- FOR FUTURE INSTALLATION OF LEVEL GAUGE PROBES. 11. THE INSTALLATIONS SHALL COMPLY WITH THE NATIONAL ELECTRICAL <br /> COILS <br /> TATIC , GROUND CLAMP ALL MONITORING SENSORS AND PROBES ARE SERIES WIRED AT PANEL FOR CODE; FEDERAL, STATE AND LOCAL CODES; AND OTHER APPLICABLE <br /> CABLE UP 3 & (Typ ) EACH TANK PER WIRING DIAGRAM. SAFETY CODES. <br /> SECURE TO SIDE SEE MANUFACTURERS WIRING DIAGRAM FOR SPECIFIC WIRING 12. SPECWL NOTE; IT IS THE INTENT OF THIS DESIGN THAT ANY FAILURE <br /> OF BLACK STEEL RISER (TYP.) a <br /> RISER TANK TANK TANK TANK AND FURTHER INFORMATION. WIRE THE EQUIPMENT AS OF THE LEAK DETECTION SYSTEM, THAT ALL POWER TO THE PRODUCT v N N <br /> (TYP.) REQUIRED BY THE MANUFACTURERS WIRING DIAGRAMS. PUMPS WILL BE INTERRUPTED z in m <br /> CCOpNN FINISH <br /> (NP ) 4 BOXT(TYP. SURFACE ALL U.G. CONDUIT SHALL BE PVC COATED, RIGID GALVANIZED (RSG) 13. CERTIFIED INSTALLERS- ALL MANUFACTURERS TRAINING REQUIREMENTS SHALL BE. vi = •v <br /> Bonding Detail MET BY CONTRACTOR INSTALLING PROBES AND WIRING TO MONITORING SYSTEM <br /> 3 . , .•1.• •.,_. g * INTRINSICALLY SAFE WIRING. NO OTHER WIRING PERMITTED IN CONDUIT. AS WELL AS DISPENSER WIRING. <br /> 4" BLACK STEEL -- 14. IT IS THE RESPONSIBILITY Of THE INSTALLING CONTRACTOR TO NOTIFY THE g <br /> FILL PIPE (TYP.) NOT TO SCALE: 2 G <br /> 6 FILL SIDE A-MONITORING SENSOR IN ANNULAR SPACE VEEDER ROOT DISTRIBUTOR FOR STARTUP. a R = 8 <br /> 2 (TY P.) (TYP.) CONTAINMENtT 15. SEE MANUFACTURERS WIRING DIAGRAM FOR SPECIFIC WIRING <br /> SUMP (TYP. B-MONITORING SENSOR IN TURBINE SUMP AND FURTHER INFORMATION. WIRE THE EQUIPMENT AS <br /> REQUIRED BY THE MANUFACTURERS WIRING DIAGRAMS, 9 r U N ofm m <br /> DOUBLE WALL <br /> —� TANKS C-LEVEL GAUGE MAG PROBE (IF INSTALLED) 16. EACH TURBINE RELAY IS TO WIRED TO THE MONITORING CONSOLE'S OUTPUT <br /> RELAY MODULE, AND THE VEEDER ROOT CONSOLE IS PROGRAMMED SO THAT AN mas er re ease da e <br /> PEAGRAVEL/CRUSHED ACTIVATION OF A TURBINE SIDE SUMP LIQUID SENSOR OR AN ANNULAR SPACE <br /> ROCK OACAFILL Tank Monitoring .LIQUID SENSOR WILL SHUT DOWN THE TURBINE FOR THAT TANK. <br /> �—EARTH EARTH —• Conduit Schematic NO. DATE _ REVISIONS - PROJECT RELEASE prof. exe. drawn by <br /> (GROUND ROD INSTALLED IN SOIL NOT PEAGPVEL/CRUSHED ROCK BACKFILL) 5 - 3/19/00 -J.V. <br /> '� - ��, PERMIT - <br /> NOT TO SCALE: project facility <br /> BID 5569 <br /> Static AS-BUILT Grounding Detail <br /> CONST. sheet / tile <br /> `M TK4- <br /> NOT TO SCALE of <br /> AR10918/SELF SEii\;i 5569�hTC42.DW�3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.