Laserfiche WebLink
Piping (cross-sects anal diagram, including coMectimmvs to tank and dispensers). <br /> ff- <br /> ;A) vent and tank Haar primary eeRta irrtCrt system equipped with overfill prevention systx endo: <br /> ReStriets delivery of flow to tank (Section 2535 (b) (Z) (S) or [6)), or <br /> Provide positive shut off of flow to the tank at no more than 95 X [Section 2£35 Cb)C2)(C)], or <br /> ;g) Vapor recovery piping designed so it cannot contain Liquid phase product, or <br /> (C) /VA' sweeten piping (below grade piping operates at lass than atmosphere pressure) lSettiaii 2636 (a) (3)] <br /> Stoped to Ganten Ls of the pipe will drain hack into the storage tank it the auction is <br /> reteasad. <br /> No valves or pups installed below grade. <br /> _ Inspection aofftad provided to denonstrate compliance with section 2636 [a) C3). <br /> (0) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (G) Undergrand primary piping will Beet all of the fot(wing requirements <br /> Pr:mery piping in contact with hazardous substance under normal operation conditions shall be: <br /> tmraLled inside a secondary containment system in tie form oft_s andary pipe__Vautt or <br /> _lined trench to be sloped to a collection sump at the low point of Ll:e piping. <br /> Primary piping and secondary contair+oent systems will W installed in aecordarcr with industry <br /> Code of prwti Ce and voluntary consensus standards.. <br /> Lined trench usea as secondary containment <br /> Material compatible with Lie substance stored. <br /> :Aver Ed and capable of Supporting any expected vehicular traffic. <br /> (F) underground ptpirg with secondary cmcain enc will be equipped and monitored as follows: <br /> XSecondary containment will be equipped with a continuous aonitoring systema cwrwctM to ar audible <br /> 1+y/ and visual alarm system. <br /> `r Automatic !into,e��ak to5 -++i t be instal/I�•�T`�' zed piping <br /> Manufacturer:_ &MAiL Medal:_v!'J V-!! <br /> Annual p. troring wilt be conducted on the pressurized piping with seeagary creta irmehc. <br /> Angel line tightness tort will not be required if the aontirxeua monitor shuts down the pump and <br /> activates the alarm system when A release is detected and when the Opritinuous monitoring system <br /> fails at is discorwieetad. <br /> 20-N�� State water Resources Central gourd "Favi Lity (A)" and '?twat Permit (g)" application forma submitted. <br /> 2;, plan. review and operating permit fees paid. <br /> 22. whet is the eppronimote depth to ground water. <br /> '— (inctuse source of information - borehole logs, rani�oring well data, water <br /> studies, etc.) _ <br /> 23. Total sober of tanks on site after installation: rw1( <br /> 24. County/City Fire District and euilcting 0epertmermt notified. <br /> 25. In the event contamination is observed, confirmed or suspetted as a result of a leaking LST swto' it is your <br /> responsibility Cin actoedance with (CCR) Title 230 Division 3, chapter 16. Article 71, Corrective Action <br /> Requirements),}s an owner or operator to submit a workplan :o P4S-E40 Site Mitigation Unit prior to inicia:ing any <br /> ass t /Fenediation activities. for further assistance contact Lie Site Mitigation unit at (209) x.69-3430. <br /> The aparator acknowledge this respo . itiry f r , plan tttal by sigratare a betou- <br /> Name Tn 'e Oate <br /> =NO!TIONS OF APPROVAL <br />