My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_2000 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:30:07 PM
Creation date
11/5/2018 11:31:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u,iZt as 1V;Za ran 4Zu ni bJf5Z riaNGH.9LSEN �pjuooiuv�oo <br /> Califomta Edition:SeptOMber 1997 <br /> Marley Pump Co. <br /> Red Jacket PPM 4000, RLM 9000, RLM 10000,ST 1401L,and ST1801 L t��r <br /> AUTOMATIC ELECTRONIC LINE LEAF.DETECTOR <br /> Certification: Leak rate of 3.0 gph with Pb=1000,o and Pr,q=O%. <br /> Leak Threshold: 2.0 gph. A leak is declared if the output of the measurement system <br /> equals or exceeds this threshold. <br /> Applicability: Gasoline, diesel, aviation fuel and solvents. <br /> Specification: System tests pressurized fiberglass and steel pipelines. <br /> Tests are conducted at 6-10 psi. <br /> Pipeline Capacity: Maximum of 55.1 gallons. <br /> Waiting Time: None between delivery and tasting_ <br /> None between dispensing and testing. <br /> Test Period: Response time is 1 minute. <br /> Test data are acquired and recorded by a microprocessor. <br /> Calculations are automatically performed by the microprocessor. <br /> system Features: Permanent installation on pipeline. <br /> Automatic testing of pipeline_ <br /> Preset threshold. <br /> Single test to determine if pipeline is!eaking. <br /> Recording and display of day,date, and time of positive test. <br /> Dispenser shutdown,message display,and alarm activation if leak is declared. <br /> Calibration: System must be checked annually and calibrated if necessary in accordance with <br /> manufacturer's instructions. <br /> %/JlS 15 .4 A'Ji'`� �fzrN7 <br /> iNet'aVe- Tri " gy /e <br /> 1 T 15 71716" X51 yp ' e UA1 i 7" <br /> Marley Pump Co. Evaluator. Ken Wilcox Associates <br /> 5800 Foxridge Dr. Tel: (816)443-2494 <br /> Mission, KS 66202 <br /> Tel: (913)813-5700 Date of Evaluation:03/11/91; Rev.04/94 <br /> 157 <br /> Appearance an this list is sotto be constmee as an endorsement byany regulatory 298M)11`1017 is it any guarantee of the perfon + nee of <br /> the method or equipment. Equipment shou,d 09 installed and operated in ae=oance with all applicable laws and reguladwl!,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.