My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_2000 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:30:07 PM
Creation date
11/5/2018 11:31:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE WORK AND HEALTH SAFETY PLAN <br /> 1. GENERAL <br /> This Health and Safety Plan has been designed to conform to and/or exceed guidance standards <br /> promulgated by EPA and the California Department of Health Services, Federal OSHA <br /> regulations (29CFR1910.120) and CAL/OSHA regulations. Because considerable experienced <br /> judgement must be applied to decisions that will be made while actually working on site, it is the <br /> goal of this plan to provide maximum work efficiency while maintaining an uncompromisingly <br /> safe working environment. This plan is not a substitute for experienced judgement and direction, <br /> or for common sense during construction activities. <br /> The contractor will provide services and equipment for the completion of the scope of work. The <br /> contractor will adhere to the Site Work Health and Safety Plan. <br /> 2. WORK OBJECTIVE <br /> The overall work objective is to provide for proper and safe completion of scope of work. <br /> 3. SAFETY MANAGEMENT <br /> The field supervisor is the site and safety officer and will ensure that all personnel comply with all <br /> applicable regulations and requirements of this plan. Due to the various aspects of the work, <br /> specific personnel are not assigned to this project at present. Basic requirements are: <br /> A. Personnel shall be physically able (and mentally willing) to comply with safety <br /> requirements. <br /> B. A copy of this safety plan shall be posted at the job site and a copy made available to <br /> each individual who will work at this site. <br /> C. These plans should also include and/or address as a separate plan,the following: <br /> 1. A Worker Hazard Communication Program <br /> D. Periodically scheduled "tailgate safety" meetings shall be held to review the safety <br /> program. Attendees will sign the Safety Meeting Notice. <br /> E. Unsafe acts shall be stopped when discovered. <br /> F. Required safety equipment shall be present on site and shall be checked to verify <br /> completeness and function prior to being put into service. <br /> G. Sources of ignitions will be eliminated where possible. Smoking will be strictly <br /> forbidden on site. <br /> H. Personnel may change depending on field conditions. Changes will be noted in the field <br /> logbook. <br /> Employee Training Assignments <br /> All on-site employees will be trained in accordance with T8 CCR 5192 (e). The person service as <br /> Site Safety and Health Supervisor will have completed a standard first aid course. <br />
The URL can be used to link to this page
Your browser does not support the video tag.