Laserfiche WebLink
"A" SIDE OF "B" SIDE OF 1-1 2" VAPOR RECOVERY <br /> 34 UNDER DISPENSER DISPENSER C B - - 34 UNDER DISPENSER DISPENSER T<DW/ <br /> IMPACT T B VALVE (SHEAR SECTION <br /> USH <br /> CONTAINMENT SUMP TK3-3 TK3-3 CONTAINMENT SUMP STOPEOFL PUMP ISLAND) <br /> O STABILIZER BAR UNLEADED STABILIZER BARi/ <br /> ASSEMBLY PREMIUM VAPOR ASSEMBLY TOP Of CONCRETE DRIVE SLAB <br /> 92 OCTANE RECOVERY VAPOR UNL PREM /-UNLEADED DISPENSER ISLAND 39 <br /> RECOVERY 92 OCTANE ( 87 OCTANE <br /> . .;: . .;: <br /> 9 . 1 �� ', P •. P <br /> O o 1EDUCE x U - G <br /> V <br /> UNLEADED REDUCER BUSHING -�--} <br /> I 87 OCTANE G-1/2" FLEX CONNECTORTO <br /> 32 (TYP. 4 PLCS.) BULKHEAD FITTING 31-1�2"x3" NIPPLEQPECGRAVEL �`Vvt-1/2" STAGE II VAPOR@A KFILL1-1 2" COUPLINGRECOVERY EMERGENCY 31 32 1-1/2"x24" FLEX CONN. 4SHEAR IMPACT VALVE /� �1 -1 2" FLEX 'a -- "-2" BELL x MALE i?�^•- - CON ECTOR �o <br /> A (TYP. 3 PLCS.) iTK3-3 - - - _ JP P _ 34 UNDER DISPENSEREE W/ CONTAINMENT SUMP"B" SIDE OF 2" BELL x MALE CFNATIVE SOILHIN Vd U <br /> DISPENSER + (INSIDE SUMP) + .pd C 4/ <br /> EDGE OF TRENCH is <br /> — — — — — - — — — — — t^(0 <br /> 3" FIBERGLASS STAGE II 20 r 5 "� <br /> 0 o VAPOR RECOVERY PIPE <br /> VAPOR RECOVERY O Q O <br /> - ` T <br /> LINE o co <br /> �� 2" FIBERGLASS 45' ELL. (TYP.) Vapor Recovery Piping at Dispenser I <br /> 0 <br /> PRODUCT _ o - - - 30 1-1/2" PRODUCT EMERGENCY NOT TO SCALE: N <br /> LINE o -a' � 3" FIBERGLASS TEE (TYP.) SH R IMPACT VALVE <br /> Fri <br /> ° W/ 2" REDUCING BUSHING LOO �' W <br /> (TYP. PLCS.) <br /> _ <br /> PRODUCT - _ � \) 0 <br /> PRO - - - THIS IS A VIEW FROM "B" SIDE OF DISPENSER 1�2" IMPACT VALVE W/ UNION TOP 3o V Y <br /> (]SH R SECTION MUST BE FLUSH <br /> NOTES: W/ TOP OF PUMP ISLAND) Lj,� (� <br /> 1. VAPOR LINES TO SLOPE FROM DISPENSERS TO TANKS 1/8" "B" SIDE OF DISPENSER ISLAND 39 <br /> PER FOOT MIN. TOP OF CONCRETE DRIVE-SLAB DISPENSER -- <br /> 2. THE VAPOR RECOVERY SHEAR VALVE SHALL BE A TOP ENTRY VALVE. <br /> _ _ _ _ _ (� <br /> EDGE OF 'TRENCH SEE SECTION B ON THIS SHEET • .? "� <br /> 21 2" FIBERGLASS PRIMARY PIPE (TYP.) 3. ALL SHEAR VALVES SHALL BE SECURELY MOUNTED TO THE STABILIZER <br /> PO 3" FIBERGLASS SECONDARY PIPE (TYP.) BAR ASSEMBLY TO ASSURE VALVES WILL TRIP AND OR SHEAR UPON AN LL <br /> IMPACT ON THE DISPENSER OF DESIGN CONDITIONS. a AW <br /> C B H v c.4 . . G <br /> IL <br /> 3" FIBERGLASS TEE AND 4. ALL UNDER DISPENSER CONTAINMENT SUMPS AND FITTINGS ARE PLUMBED BY o COMPRE SIONN <br /> 3" FIBERGLASS 45' ELL. (TYP.) TK3-3 TK3-3 THE CONTRACTOR. N CLAMP �TYP.) ��.d <br /> (SECONDARY) 5. THE LOCATION OF THE PRODUCT AND VAPOR RECOVERY PIPING STUB-UPS SHALL PEAGRAVEL 1-1/2"x3" NIPPLE W <br /> BE AS SHOWN CONTRACTOR IS RESPONSIBLE FOR CORRECT ORIENTATION BACKFILL BULKHEAD FITTING 36 1 -1/2" COUPLING J <br /> OF THE STUB UPS TO THE DISPENSER. ANY ADJUSTMENTS OF THE INTERNAL WORKINGS <br /> Plan View Detail (Blending) OF THE DISPENSER TO ACCOMMODATE INCORRECTLY INSTALLED PIPING WILL BE AT - ----- <br /> 32 1-1/2"x24" FLEX CONN. <br /> CONTRACTORS OWN EXPENSE. r. <br /> Three Product MPD Piping Section Shear Valve Section ^ 2" BELL x MALE <br /> (PRIMARY PIPING) <br /> 11 --- - <br /> CA) <br /> NOT TO SCALE: NOT TO SCALE: tO P P V 34 UNDER DISPENSER <br /> 11 3"x2" TEST REDUCER CONTAINMENT SUMP <br /> DISPENSER AUXILIARY C <br /> NOTES; JUNCTION BOX (INTERCOM) NATIVE SOIL Q fA <br /> UNDER DISPENSER CONTAINMENT SHALL BE EQUIPPED 'A" SIDE OF <br /> WITH A POSITIVE SHUTDOWN ELECTRONIC SENSOR THAT DISPENSER •� <br /> WILL INTERRUPT POWER TO THE DISPENSER, ALL FITTINGS "B" SIDE OF <br /> IN UNDER DISPENSER CONTAINMENT SUMP ARE INSTALLED DISPENSER DISPENSER <br /> BY THE CONTRACTOR. JUNCTION BOX Z <br /> ELECTRICAL PENETRATIONS ENTER FROM THE "A" SIDE OF C O <br /> THE DISPENSER. PRODUCT AND VAPOR RECOVERY —MULTI-PRODUCT 26 <br /> PENETRATIONS ARE LOCATED ON THE "B" SIDE OF THE DISPENSER <br /> DISPENSER, 1/2" IMPACT VALVE W/ UNION POP 30 •� O <br /> ](SHEAR SECTION MUST BE FLUSH /// Product Piping at Dispenser 0- _ <br /> W/ TOP OF PUMP ISLAND) SEAL OFF / <br /> SPLASH GUARD 1\ j � <br /> GASOLINE RESISTANT SEALANTT NOT TO SCALE: W C m <br /> AROUND BASE OF DISPENSER2 6" RAISED FULL RADIUS DISPENSER ISLAND 39 Q T <br /> SEE DETAIL #1 ON CA1 -1 C , <br /> c <br /> a <br /> d ' O ' 6 'd P '. A e.. O U E <br /> TOP OF CONCRETE DRIVE SLAB " - < P . P 'A W -a <br /> PEACRAVEL BACKFILL <br /> '. P, °, 6' BLASE OR SURFACE V! Z �"" r <br /> ° ° ° a ' MAT RIAL WHERE r <br /> a " 'a°a. 1 <br /> ENGINEER TOP Of FINISHED SURFACE C O <br /> REQ ID. BY OWNERS Q Q �••-- C <br /> d' ° ' a. d � _ /x(�/ u <br /> d9 dd <br /> 21 2" PRIMARY CIOAMMP E(TYIC 1-1/2"x3" NIPPLE X - -+ mce) 6O <br /> CONTAINMENT PIPE X x <br /> 20 3" SECONDARY 36 BULKHEAD FITTING 1-1/2" COUPLING 3/4"C, DISPENSER POWER x xx xx ra <br /> AND COMMUNICATION TO BLDG. �O XX O x <br /> CONTAINMENT PIPE 32 1-1/2"x24" FLEX CONN. �(1 CONDUIT HOMERUN PER .DISPENSER) <br /> --- ---- - - xx'' 3/4"C, VEEDER ROOT MONITORING )v X X x x zxx <br /> .._. )� COMMUNICATION CABLE TO BLDG. VAPOR RECOVERY LINE N a <br /> (ONE CONDUIT PER DISPENSER) <br /> -- __ <br /> --- 12" t10" t10" 2 PRODUCT PIPING LINES � <br /> TYP. z N x <br /> 38 N V <br /> �3/4"C, INTERCOM TO BLDG. ¢ W m o <br /> 34 UNDER DISPENSER CONTAINMENT (ONE CONDUIT PER DISPENSER) <br /> O 11 3"x2" TEST (REDUCER SUMP. SIZE TO MATCH NOTE: CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT HOLE AND 6 <br /> DISPENSER FOOTPRINT. TRENCHES FROM SURFACE WATER RUNOFF UNTIL PAVING IS REPLACED, a � <br /> 2" BELL x MALE NOTE: SEE TK4-3 FOR DISPENSER MONITORING - J a <br /> (PRIMAR`Y PIPING) MATERIAL LIST 35 SENSOR. MOUNTING <br /> OF SENSOR NOT SHOWN. Typical Piping in Trench <br /> D a e <br /> NOT TO SCALE: master release <br /> NO.1 DATE I REVISIONS PROJECT RELEASE prof. exe. drawn by <br /> 3/19/00 J.V. <br /> VAPOR RECOVERY NOT SHOWN THIS VIEW PERMIT <br /> Typical Under Dispenser pro,ect facility <br /> 569 <br /> Containment Sump BID tfe <br /> 12 CONST. sheet / ffile/ <br /> NOT TO SCALE: - TK3-3 <br /> AS-BUILT of <br /> ' AR HM10{SELF SEfIV(,5,>9/TK33.0WG <br />