My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:39:03 PM
Creation date
11/5/2018 11:33:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K.E. CURTIS CONSTRUCTION CO. , INC. <br /> 1400 OLD CONEJO RD, NEWBURY PARK, CA 91320 <br /> SAFETY PROCEDURES FOR <br /> UNDERGROUND TANK JOBS <br /> ------------------------- CHECKLIST ------------------------- <br /> r= removal <br /> i= installation <br /> r 1 . (2) FIRE EXTINGUISHERS RATED 60 BC & NO SMOKING SIGNS <br /> r 2 . BRASS HAMMER AND OTHER NON-SPARKING TOOLS <br /> i 3 . 5-MINUTE BREATHABLE OXYGEN <br /> ri 4 . DELINEATORS / CAUTION TAPE / FENCE PANELS <br /> ri '5. HARD HATS' <br /> ri 6 . SAFETY VESTS & STOP/SLOW SIGNS <br /> OPTIONAL EOUIPMENT - DEPENDING ON CONDITIONS & PROCEDURE USED <br /> ri 1. TEATHER LINE 5/8" <br /> ri 2 . TEATHER POSTS & CHAIN <br /> ri 3 . BODY HARNESSES / LANYARDS / CARABINERS <br /> ri 4. COME-ALONG <br /> r 5 . RESPIRATORS / CARTRIDGES <br /> ri 6 . THREADED LIFTING EYES <br /> ri 7 . . WALKING PLANKS / EXTENSION LADDER <br /> ri 8 . LIFTING CHAINS/CABLE - APPROPRIATE LENGTH <br /> ri 9 . OPEN-END OR "S" HOOKS <br /> r 10. LEL / OXYGEN METER <br /> ri il. ALUMINUM EXTENSION <br /> ------------------------------------------------------------- <br /> 1. DISCUSS PROCEDURE TO BE USED WITH SAFETY ENGINEER PRIOR <br /> TO TANK REMOVAL OR INSTALLATION. THIS WILL REDUCE DELAYS <br /> AND WILL PROVIDE FOR A MORE SAFE AND PRODUCTIVE JOB. <br /> 2 . INITIALLY, THE BOLE DEPTH SHOULD NOT EXCEED BELOW THE <br /> TANK TOP SURFACE (3-5 FT) . ONCE EXPOSED, PIPIN" AND <br /> OTHER MATERIAL CAN BE REMOVED. TRIPLE RINSERS SHOULD <br /> COMPLETE AND ALL OTHER ACTIVITIES THAT REQUIRE ANyOL::, <br /> BEING PLACED IN THE HOLE, IF POSSIBLE, BEFORE EXCAVATIGI <br /> CONTINUES. <br /> 3 , WORKERS AROUND EXCAVATING EQUIPMENT SHOULD WEAR AN ORANGE <br /> SAFETY VEST AND MUST NEVER GET CLOSER THAN FIVE FEET OR <br /> WITHIN THE ARC OF EXCAVATING EQUIPMENT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.