My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
2300 - Underground Storage Tank Program
>
PR0231052
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 3:43:17 PM
Creation date
11/5/2018 11:37:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231052
PE
2381
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\B\1603\PR0231052\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/28/2011 8:00:00 AM
QuestysRecordID
107580
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OFCALIFORMA y•`` ....,`®„` <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B a o <br /> COMPLETE A SEPARATE FORM FO ACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION O 7 PERM Y CLOSED SITE <br /> ONE REM 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 8 TEMPORARY TANK CLOSURE <br /> B TAN REM <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: x(003 •l " �Y O u <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN ✓�K <br /> A OWNERS TANK I.D.a O S. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) u D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-IISMARKED,COM IE ITEMC. <br /> A. ❑ 1 MOTOR VEHICLE FUEL 4 OIL 8. C. ❑ 7aUREGULAR <br /> NLEADED 3 DIESEL ❑ e AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY ❑ 1 DUCT ❑ lbUN UNLEADED PREMIUM <br /> 8 5 GASAHJET L ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN 2 WASTE 2 LEADED <br /> ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED <br /> C. <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,8.AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM V� SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASSREINFORCEDPLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ e POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 1001 METHANOL COMPATIBLEW/FRP <br /> (Primary Tank) 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ I RUBBER LINED ❑ ALKYD LWING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR <br /> GL <br /> ❑ 5 ASS LINING S UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCEO"PLASTK:_.. <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 97 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U I A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 1 LE LL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 R A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 8 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 'MON ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ e TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAV/YR) 2ESTIMATED QUANTITY 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ O❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE. IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> (PRINTED&SIGNAL REI DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE I.D.# <br /> COUNTY 9 JURISDICTION x FACILITY 9 TANK 9 c�LTR A l b <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION OAT <br /> FORM 8 (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORMA HAS BEEN FILED <br /> %!C////WR00%9B5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.