Laserfiche WebLink
4. PIPING TESTING: TESTING OF LINE SF�CONDARY CONTAINMENT PIPING IS [REQUIRED. THE SEAL!NC <br /> Sheet Notes BOOT IN THE SUMP IS 1-0 BE INSTALLED WITH THE VALVE TURNED DOWN. AFTER 8 PREFABRICATE[) ASSEMBLIES: A CERTIFICATE OF APPROVAL SHALL BE FURNI'SHED WITH EACH 13. U.C. CONDUIT: AT--[.- U.C. CONDUIT TO TANKS SHALL BE RIGID STEEL GALVANIZED (RSG) <br /> TESTING, THE VALVE IS TO BE OPENED TO ALLOW DRAINAGE Or" THE SECONDARY SCHEDULE 40, PVC CONDUIT MAY BE SUBSTITUTED FOR RIGID GALVANTZE[_) _'XC <br /> 1 , SUMP PIPING PENETRATIONS: PIPING TO THE SUMP MONIFOR PROBE, PREFABRICATION ASSEMBLY, CERTIFYING THAT THE ASSEMBLY OR STRUCTURE IN QUESTION HAS I—() ANY LOCATION. PVC CONDUIT MINIMUM BURY DEPTH IS 24" PER CODE. I EPI FINAL 24" <br /> SUMP PIPING PENETRATIONS SHALL. BE MADE USING BULK HEAD FITTINGS 5� PIPING PENETRATIONS: ALL PENETRATIONS OF THE SUMP TO BE ON A LIHE TOWARD THE CENTER BEEF) F�SPECFED MEETING THE REQUIRE"MEN'T OF THE CODE� <br /> ("ENVIROLI"). ELEC1"RICAL PENETRATIONS SHALL BE MADE TANK STABILITY: TANK STABILITY SHALL BE C�-TECKED AGAINST FLOATATION, 14. RISER GROUNDING: RISER GROUNDING: ALI-. RISERS IN THE FILL SUMP AND THE ANNULAR <br /> WITH APPROPRIATE WATER IIC',ILT COMPRESSION FITTINGS WI-11-1 SEAL----OFF'S. OF THE SUMP TO ENSU IRE THE PROPER INSIALL-ATION O_rF ALL BULKHEAD AND COMPRESSION FITTINGS 9. -_ - S R ACE RISER SHALL BE GROUNDED AND BONDED PER DETAIL #4 ON DWG. TK4­2, <br /> (I.E. ENVIRON). AND RESULTANT WATER TIGHTNESS. ALL.. PIPING, CONDUIT AND GROUNDS FFIAT PENEIRATE 10. DROP TUBE CRITICAL DIMENSION: THIS DIMENSION IS CRITICAL AND MIJST BE ADHERED TO. 15� ANNULAR SPACE LOCATION: FOR A 20,000 GALLON 10' DIAMETER TANK, <br /> THE SUMP SIDE WALI_ S MUST BE SEALED IN SUMPS, SUMPS Sl--IAL,[-. BE HYDROSTATICALLY CONIRACTOR WILL BE REQUIRE[) TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED SPACE RISER IS LOCATED ON JH1 FILL SIDE AS SHOWN, THE ANNULAR <br /> 2 SIPHON PIPING: JESTED WI-1-1-1 SFANDILIG WATER FOR A PERIOD OF 24 HOURS TO INS(JRE -THAT THE SUI`,/11PS FOR EXPENSE TO CORRECT INCONSISTENCIES, <br /> THE HEIGHT OF PENETTRATIONS INTO SUMP FOR SIPHON PIPIN(2 VARY BETWEEN TANKS, ARE WATERTIGHT, THE OWNER'S ENG111EER MUST SIGN OFF ON THIS TESTING ON THE TANK METHANOL COMPATIBILITY: FOR AILL MET1--LANOI__ COMPATIB[ <br /> SEE DETAILS //6, 117 ez #8 ON DWG, l-K,-3-2 FOR TANK SIPHON PIPING DETAILS, INSTALLATION CL-ECK LIST BEFORE CONPRACTOR WILA.- BE PAID. _F STORAGE SYSTEMS, ALL READILY <br /> ACCESSIBLE COMPONENTS WHICH ARE NOT METHANOL COMPATIBLE FOR THE IMMEDIATE 16. TOP OF TANK ELEVATION: 1-0 CALCULATE TOP OF TANK E L.-EVA7 10 N START WITH 18" MINIMUM <br /> 6, FILL. AND VAPOR CAP HEIGHT TO GRADE: TI IIS DIMENSION IS CRITICAL AND MUST BE ADHERED TO, INTENDED SERVICE SHALL BE RETROFITTED INTO _P'­IE STORAGE SYSTEM, <br /> 3. TANK(S)� SHALL 13E UNDERWRITERS LABORATORY APPROVED AS CAL-LED FOR ON THE CONTRACTOR WILL, BE REQUIRFD 1-0 REINSTALL AT OWN EXPENSE OIR WILL BE BACK CHARGED FOR L DEPTH OF VAPOR RECOVERY LINE AT -THE FARTHEST DISPENSER AND SLOPE, I <br /> SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND /4 PER FOOT <br /> MAXIMUM -TO 1/16" PER FOOT MINIMUM. ADD 12" AT THE -ANK. ADD 13' (FOR 3" PIPE) <br /> _ANKS OF FIBERGLASS REINFORCED TIC (FRP) AS OR 8" (FOR 2") FOR A CHANGE IN PIPING DIRECTION OTHER THAN 90- OR 45', SET TANKS 6" <br /> EYFENSE 1-0 CORRECT' INC'ONF[STENCIES. I <br /> SHALL BE DOI,JBLE WALL I PLAS ........... I �/ 12. MANHOLE CROWNS: ALI_ MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH DEEPER THAN CALCULAIED AS R <br /> MANUFACTURED BY XERXES CORPORATION, INSTALLATION OF FANKS AND PIPING -7 TURBINE SUMP SENSOR: ,,""�`.)'E E SHEET TK4 A 1 ---1/2" GROWN OF CONCRETE FO PREVENT WATER INTRUSION INTO F1-­E MANHOLE. IN NO EVENT <br /> -2, DETAIL '#1 FOR LIQUID SENSOR DETAILS. SENSORTO r- RECAUTION. SHALL THE TANK 13E BURIED LESS <br /> 13Y ARCO PETROI._,ELJM PRO[)UCTS COMPANY, AND F -TANK WHERE PRODUCT PENETRATION INTO SUMP IS MADE AND BELOW UIRED TO SIGN IHAH 4'-0" BELOW FINISHED GRADE OR DEEPER THAN 7'--0" BELOW FINISHED GRADE.' SEE <br /> SHALL BE IN ACCORDANCE WITH SPECIFICATION 13800 LAI-EST' EDITION AS PRO\;I[)ED( BE MOUNTED AT SIDE "I SEE SECTION A ON DWG. TK3--5. THE OWNER'S ENGINEER WILL BE REG >% <br /> MANUFACT(JRER'S INSTRUCTIONS. LOWEST PEHETRATIOH F)ItTJING WITHIN SUMP-ARE.A.""' OFF ON THIS ITEM ON THE -TANI< INSTALLATION CHECKLIST BEFORE CONTRACTOR WL L BE PAID, MANUFACTURERS INSTALLATION RECOMMENDATIONS. ANY VARIATIONS IN SLOPE FROM -1/4" 0) (D 0 <br /> ------- ................. ........ PER FOOL SHAIL-L BE REPORTED 70 OWNER'S ENGINEER. <br /> ------- ............. Ctj E I. C0 <br /> 0 LO <br /> 2 ALLON U I EA ED 87 CT E 0 <br /> CL (D <br /> -1 NK [_EV__l GAUGE <br /> (I INSTAL LIFT)) PROD CI <br /> 42 8 ' 8 01 0 <br /> B 0 <br /> - t-J[-KT-IEAI' 0 C <br /> (0 <br /> (2 TTING Q_ <br /> TK3-I EE NOT' 4'± W <br /> > <br /> __J <br /> (n C-)v) 16 112 <br /> C_.)6; 0 (D <br /> - UMP M III I ORING <br /> -,OF <br /> QUID S <br /> F ff <br /> AJ CY <br /> 4"X3" \'\I-OR REC' V RY ADAP11 R EE NOFT 17 C C <br /> GAL III, SPIR TAINMT,L_ 2" F-.';. VEN- CO <br /> Z! <br /> 0 C K -4-0 0 <br /> JJ, <br /> FILL B-)X. <br /> LIJ 0 <br /> 0) <br /> 4v U! <br /> PIPE PL._JC 0 0 <br /> I,J <br /> N <br /> (IF GAUGE 1C <br /> 3TALLED) <br /> z! <br /> CO <br /> E <br /> v): <br /> TO TUR W F_ <br /> CIO <br /> ------12 <br /> SIPI DI CHECK V, _VE <br /> (D <br /> G <br /> 3/8 D. COP (0 <br /> I UB <br /> TANK I A -1 CA(-C, (D <br /> S <br /> A I-ED) <br /> (IF IN, <br /> 0 <br /> 'T" <br /> U0 <br /> 0 <br /> -iOl E ACCES , TOVERS <br /> ALL MANI <br /> I.K�JID TIGHI ND LC L� ABLE (z(.,R'D BLA-'K STEEL <br /> AND C <br /> _ _S <br /> N', �Nl_ Ell I E Q)X SEE I I ) -_ <br /> �Ew 2" ON <br /> C BELOW ( F DE S1 L I BE <br /> 4" FILI_ A)APTER <br /> CONTAI SPILA (0 <br /> TTR -INE CO� A �MENT Al ) FILL T'I[I_ 0 <br /> S I Is �F_U RI,! ETIED B"I IANK MAI\ F. , 2" V.F R 0 T4- < <br /> D/ TAN K J C I LA R S, <br /> 0 R-_J A- - _/ M <br /> ACCES , i& 22 1--IEADEI' <br /> FILL-1 B ND <br /> A SI-E DETAILS CUR -1- T STANFAR ) B <br /> ............... ......... .............. cfi <br /> IK2-IA ...... TK3-1 B JIL-KHEAC A <br /> (21D 11T T I N G TK2-1A Cd < <br /> 201 E HO I-E 0 <br /> i TANE <br /> /\CTIVE S I DN TO 00 GAL 87 GO <br /> )LOPE A" __'HOWN CLF Cd <br /> DETAIL #10 ON DWC , <_�-2 <br /> l(OTHER 114TTIVE FUly <br /> I'-�IPHON Pll_�!G NOT <br /> C: <br /> SEE NOTE #6 Plan View <br /> 4-- 1/2" To 6" <br /> 18" 3 6 HOT T-0 SCALE: E <br /> YP.) / 32" I.D. PVC THREADED <br /> SUIP T'YP\,, DUAL FILL) SET AT - <br /> < (SEE NOTE #15) <br /> (2) 1/2" CABI E GRIP 15 18" PIPE CAP <br /> (TY P. T U R B N E <br /> SEALS PLIED 6 M I N, J/ <br /> (TYP.) MIN. CROW <br /> 0 <br /> 12" MAX, <br /> W/ SENSOR T'f/P. ALL 0PE(\,jIf <br /> ----A.C. PAVING <br /> J 4 4 4-E NOTE #12 <br /> 7 <br /> 4 4 <br /> z Ir W <br /> 4 4 4 41 , wx� <br /> 4 <br /> 4, <br /> 4 4 4 *4 <br /> X <br /> ------- --- <br /> MIN. <br /> 11 0 0 �4 <br /> 0 <br /> PEA --CRAVEL <br /> 3" PEA--GRAVEL MIN, <br /> SEAL 0 F F <br /> /4" COND- ---------------- 3/8" O.D, COPPER <br /> TUBING TO TURBINE <br /> -0 SUMP SPI[ ............ <br /> ----,3/4 CONDUIT <br /> LOOP I <br /> LLON _I ION <br /> SIPL CHECK VALVE <br /> (S E E NOTE #13) 3/4 CONDUIT - AINER WITH OTE #13) <br /> NE DR'AIN <br /> E <br /> E N <br /> X -&__ <br /> LJ <br /> -------- RISER (SEE NOTE #14) #4 #5 0 <br /> SEE NOTES 2 <br /> SEE NOTE #2 -J!, S (SEE <br /> (SEE NO f E #13 4 BLACK STEEL E 3" PVC PIPE OPEN <br /> 4" F31-ACK I :_� -, J BOTTOM <br /> RISER PRIMED AND -ONDUIT SIPHON PIPING <br /> U_ 3�4" C SUMP MONITORING X", C(J <br /> WRAPPED -1-0 GRADE t OP BE `WEEN 23 21 0) <br /> z TANKS IF" GAI N I..-IQIJID SENSOR <br /> (SEE NOTE j/15) ICING 2" VENF V.R. <br /> NOT INSFAD-ED' G (SEE NOTE #7) I,IJ <br /> �W/ PULL STRING) Cd <br /> 0 x 12" 1 BLACK STEEL ............ <br /> J <br /> [RISER W/ PIPE CAP <br /> SEE NOTE #13) 0 <br /> 0 2 BELL X MALE D2 <br /> ADAPTER (FYP.) <br /> >! <br /> _X <br /> L Ld 14 Mama." <br /> (D N-ii <br /> 00 . ..... I <br /> cd 0 <br /> TORIN(G <br /> SUMP M N I <br /> LIQUID SENSOR ACTIVE SIPH Cd <br /> 12 MAX,�, <br /> ON <br /> IE #7) SEE NOTE #2 <br /> (SEE NO ....... <br /> t <br /> 3 C "IJ <br /> SET AT 9 5 U. Cd <br /> Cd <br /> 10 <br /> JO TURBINE cd <br /> BAC K I-I LL Cn <br /> PEA GRAVEL <br /> CRUSHED R <br /> < Cd 0 <br /> AS PER TAN OTC Q -se <br /> MANF, SPECS. <br /> \\ ", CJJ C 0) <br /> SEE NOIF #3 <br /> C OJ <br /> C) cd <br /> INDICATES ANCHOR < � <br /> - I I'd h- W (d __ <br /> 6,11 S TRAP LOCATION /D I I I \----- EXTRACTOR FITTING & -:,D :E () (fJ 0 <br /> 3 D 6 <1 �a <br /> (WHEN REQUIRED) 10 13 1A 15 16 11 1 C BALI L FLOAT VALVE 0 <br /> �<_. I �/ 1.1 �3 1 0 - () <br /> M SET Al- 98Y. 0 C: al .2 <br /> C <br /> W 0 0 -50 <br /> 0 dil <br /> cc co �2 0 <br /> ch <br /> rh IIJ 0 0 <br /> < x 0 <br /> 4-0 <br /> (0 <br /> LJJ W N_ CO C\J IL <br /> HI <br /> < <br /> TALIK LEAK H <br /> DETECTOR <br /> �N <br /> SENSOR <br /> LIJ <br /> 0 45' <br /> ET_' 1 _?"x12"X1/4" SFEEL. <br /> STRIKER PLATE---TYIP. ALL <br /> OPENINGS ON 2" BLACK STEEL----------------- <br /> 0 <br /> FIBERGLASS FANK <br /> zzz�� ", / I <br /> ION <br /> % SIPI PIPE <br /> (S <br /> (BY TANK MANF..) < <br /> Ck.) '112 <br /> N, <br /> NG <br /> kAl "I.-AND PLANNING AND DESIGN SPECIAUSTS" <br /> V <br /> F -TH <br /> IDEA GRAVE 18215 72ND AVENUE SOU <br /> TRAPPER SCREEN (T)/P.) <br /> CRUSHED lk� KENT, WASHNGFON 98032 <br /> (4 25) 25 1 -6222 <br /> ROCK BED <br /> Q C,� REM 11� <br /> 2' -0" MIN, TANI< SIZE VARIES WITH VANUFACTURER AND MODEL NUMBER 77-77 BCE* 7063 <br /> 2'-0 �il I N,1'.S. .......... .......... <br /> TION master release date <br /> n_ N._F�S� ENID OF TANK <br /> < EXCAVA �Tr � "" <br /> CK ONLY E X CAVAT 10 N 0 N LY <br /> CD NO� ARCO PRODUCTS COMPANY MASTER REVISIONS <br /> < NO, DATE <br /> THIS DESIGN ARRANGEMENT IS TYPICAL FOR PROJECT RELEASE proj, exe. drawn by <br /> DOUBLE WALL FIBERGI ASS -------- <br /> TANK& SEE SITE PIPING PLAN AND MATERIALS LIST ON DRAWING ISSUED FOR 4/6/99 SHK <br /> FK-1-3 FOR ACTUAL MANUFACTURER CHOSEN FOR ITILS PROJECT 4/22/99 <br /> PLAN CHECI( -------- <br /> Cf) project / facility <br /> (11-1 > - <br /> < BID <br /> LIJ Underground Tank Section RELEASE 4/22/99 <br /> A ------ 4932 <br /> J7, <br /> _" "L) <br /> T P <br /> I� N <br /> B <br /> A <br /> B <br /> A <br /> [0' <br /> E <br /> 0 <br /> I OWN) <br /> _U <br /> -a- 3 4- <br /> _E� <br /> �3 ---------............... <br /> IZ �1_1. NOT 10 SCALE: CONST, sheet / file <br /> LIJ SEE NOTE #3 RELEASE <br /> AS-BUILT TK2--1A <br /> ofL v C] , I <br />