PROPOSED
<br /> ----------------------------ii -
<br /> BUILDING
<br /> Imo
<br /> u
<br /> co
<br /> 'o,
<br /> N E- m
<br /> �n 0
<br /> 10
<br /> 0
<br /> cl U
<br /> KEYNOTES
<br /> E-4 m
<br /> H5T"LL NEW $WIHG JOINTS AT BASE 41`0 CONNECT
<br /> TO NEW VENT LINES.MIN. 12 FT. A150'1E FIN.GRACE, AND 5 FT,FROM PROPERTY LINE AND
<br /> BUILDING OFENIHG6.
<br /> FZERGLA55 TANK TENT LINES SLOPED BACK TO EACH TANK AT 1/8" PER 12" MIN.
<br /> (2,)GlLeARCO, ADvANTAGE', DUAL-r,)15FEN$ER (DIESEL ONLY),(2>HOSE WITH 'GRIND'
<br /> 3
<br /> AND INFO SCREEN. ON E,RAVC 5'7'5TEM.
<br /> PROVIDE 5EAL-OFF'�,/CC�,IDUIT/WiRE PER HUR N5Tl FfRCCEDURE5.
<br /> 4. (a,)GILe"IRCO, 'AD/--�NT4GE',�IPTZ> FL-ED DlePENSER5 (G,-*OLihE OHLY� �2�HOSE, EXXON
<br /> WITH CRIHD' -\ND INFO 5CREEIH. CH BRAVO 50XCCflTAiHI"EIIT/5I-4E--R /�aL\,E SYSTEMS,
<br /> FIROVIDE SEAL-OFF's/CONDUITAUIRE PER MANUR H5T-ALL,-\TICH PROCEDURES, TIGER MART
<br /> &-'Cl W. BANNER ST.
<br /> 5. YO I5 LAS PHASE 11 '-�PCR RECO,IERY PlPflG "-�NIFOL-CED FROM D�16PEHSER5 TO LODI CA �35242
<br /> - ----_. -- _ -- -. ' f -r �� TANKS. iLCFE 1/E5"/FOOT i�,Itfll`lUil SACK 70 T-�tK, iP CK TO SINGLE MPD-) 055-32c-cl
<br /> PRODUCT POPE W/ 3"o SEGCI)D-�,Rl C014T-�ltitlErcr T'rPIC-�L ALL FRICIDUCT5.
<br /> $LCFE 55-�CK TO TAI iKe AT I/a" -=-R, F, CT 1`1111,
<br /> EUJ TRUSCC, SUPESRIT-�h<' jNr--E F:UEL -3TCR-�(,E T-��X5.
<br /> j �,NL.
<br /> REG--hD (1',2CCCO SPLIT ll��TO tOCOC SUP. 1-kIL. -4,40 !C,CCO DIESEL.
<br /> --""J ALTON
<br /> 0�< r3.'I r=5
<br /> 20K �r=G a. T. _VJ)UL,-�R 5P-�CE -1/ TANK PRCEE -VNLl W.T. I""t,iW"'T, w N&NEERING, INC.
<br /> UN� S. (3,)TANK FILL JJ/ 5 GALLON FILL CONT.-�NMENT. E
<br /> OE� O. (-',) PHASE I (CRY15REAK) VAPCR RECOVERY, W1 12" MIN.MANIPLE.NOT REQUIRED AT DIESEL� 843 R15KF LANE
<br /> 10K ,�Uf=
<br /> u;EST 8ACRAnNTO,CA W61N
<br /> 11, (3.)MV�,NETC5TRICTI'eE TANK GAUGE AND l.U�T,MANWAY.
<br /> IUNLL I FAX 31.3-IM2
<br /> 1,U15MERVIBLIF TURBINE FlUt-`,P (STP) W/;N 42" DIA,F.Q.P.SUMP W/FLOAT SWITCH 11. (3) IS hp
<br /> ED PIRCIBE, LID AND 36" M-',�IWAT. -�UTO-et-IUTC�OU4 OF 8TF9 ON LE,< DETECT.
<br /> 13. a" THICK CONCRETE TAI\X SLAB W1 0.4 RE AR AT la" O.C. 50TH UAYS.
<br /> NEH Wmm oR mwow�m D"Mll$
<br /> %4L.VT NE FmF Fkxmm com cR TRA=
<br /> 14, 15ACKFILL TRENCHES WITH PE"GR",,EL TO LE,,EL REQUIRED FOR NEW SLURRY CO3,,,EI
<br /> AND PAVING a"612. PIROVICE SLURRY' rCNC i RA
<br /> (4" OVER PEA G VEL.
<br /> E XXO N
<br /> Tj GER MART
<br /> 6 ,
<br /> 1 W ANN
<br /> L E �T
<br /> ul
<br /> 15. NEW la" THICK CONCRETE DRIVE Sl-AB W/ o-4 REBAR AT 24" O.C. BOTH WAYS,O,,/ER (oil A-a. rRAUN"Y BY F-IH
<br /> - -------- MCNITCR CONTROLS AND ALARM,W/ VISUAL 4 AUDIBLE ACCESSIBILITY,
<br /> DATA 1 2 Iqo`/35
<br /> Il NEW E.S.O. WITH SIGN PER UP- IcJ.BO3 0 2. SEE GENERAL NOTES,
<br /> 51-ALS Z NOTED
<br /> IS. FIELD VERIFY LOCATION CF NEW AIR/111"TER UNIT WITH OJA\IER
<br /> Noj
<br /> 11. NEW AePH,CLT[C RAVING, BY OTI41FR15.
<br /> Al?c
<br /> 20.NEW !CC FT. BY &0 FT. CANCPY,, BY OTI%^ER,3,
<br /> DATE F.Ev, rEocRIpT�oN 13T
<br /> N
<br /> BEN.3-s I
<br /> C,
<br /> :--
<br /> --------- ------
<br /> W E S T B A N N E R S T R E E T
<br /> 044EET TITLE
<br /> P PARTIAL
<br /> ART
<br /> I
<br /> EPETROLEUM
<br /> P E T R 0 L E U M I IT E P L A N SIT P
<br /> -------- —------ SITE PLAN
<br /> SCALE: P s 10'
<br /> -- ----------------- ------- -------
<br /> ----------
<br /> no
<br /> Ic PET-lB
<br />
|