My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2300 - Underground Storage Tank Program
>
PR0231849
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 4:37:26 PM
Creation date
11/5/2018 11:44:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0231849
PE
2361
FACILITY_ID
FA0003762
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
02
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BECKMAN\200\PR0231849\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4eACKFILL EXCAVATION CERTIFICATE <br /> Project Location 200 N. Beckman Rd. , Lodi, CA 95240 <br /> Owner San Joaquin County Mosquito & Vector ContiPhdne No. (209)982-4675 <br /> Comractor Jim thorpe Oil , Inc. Phone No. (209) 68-6375 License No.4966q�a <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 4 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 1—k 2. Submission of verification, e.gload ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12 lifts: <br /> ^A. Pea gravel-smooth, rounded material not more than one-half(112) inch in diameter <br /> B. Crushed rock-self-compacting material not more than three-quarters (314) inch in cross sectional <br /> measur=e=.—(Use of crushed rock will not be permitted for backfill if contact will be made between <br /> - the backfill material and tanks/pipes made of poly resin glass or similar matenal&.) --- <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * Martin Thor <br /> Name nn[ <br /> * Contractor <br /> re <br /> * <br /> tgnan[re <br /> * Shall be the responsible managing employee on the license or autho agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.