Laserfiche WebLink
IOARO OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT seavlHo <br /> James Culbertson, Pres. <br /> Patricia E. vannuccl, Selly. City of Lodi <br /> Anthonatle van Spronsen 1601 East Hazelton Avenue, P. O. Box 2009 San Joaquin County <br /> Earl Plmenlel Stockton, ity of Escaton <br /> CaliforniaCallforn la 95201 <br /> Fern Bupbee City of Manteca <br /> Daniel L. Flores 209/466-6781 City of Ripon <br /> John 0. Most, M.D. City of Stockton <br /> William J. Wade J001 Khanna, M.D., M.P.M., District Health Officer City of Tracy <br /> Mary Anna Love San Joaquin County <br /> San Joaquin County <br /> facility Name , <br /> Address <br /> iA <br /> I <br /> �� q 'Z�) <br /> Date of Inspection U Z nspector <br /> MONITORING ALTERNATIVE N7 //mo 4'e u/A'J�t O'0 ��� <br /> Limited to underpround storage tanks which have infrequent inputs and withdrawals and <br /> where the ligtlil: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> Annual precision test on tank and piping. <br /> Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> �iquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> ✓If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less, between measurements, an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> QPrecision test(s) must be performed by and results submitted to this <br /> office within 30 days of the test. <br /> 0 Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />