Laserfiche WebLink
SPECIFICATIONS <br /> 4 <br /> 1.1 UNDERGROUND TANKS - <br /> ,/", A, RESPONSIBILITY: <br /> Contractor <br /> — ergloss <br /> SEEi DISPENSER. 65 .1167 1 rein orced plastic (FRtP)full or composite responsibifor lity <br /> dr tanks sand FRPand nsling, and othe f <br /> e�nsurre that <br /> t good workmanship, practices and construction procedures ore followed during the handling and <br /> t-6C- instollotlon of the tanks and piping. <br /> 2. The Contactor is responsible for inspecting the tanks for damage upon receipt at the job site. <br /> Any visible damage is to be noted on the delivery receipt. <br /> Q 3. The presence of the Chevron Rep, on-site does not relieve the Contractor of the responsibility <br /> for proper tank handling, installation and safety measures. <br /> U 0 <br /> 1.2 REMOVAL OF EXISTING TANKS AND PIPING SYSTEMS <br /> A, RESPONSIBILITY; Contractor will furnish permits, labor and <br /> 0 p proper equipment, except as noted, to <br /> P ` remove existing L tanks and lines per the following re:wing procedu , <br /> Contactor, as part of Ncontract,contrt, will execute and comply with the Company's "Addendum <br /> REDUCE VAPOR TO f- L \ Tank Disposal Certification Agreement". <br /> 2"0 LINE (TYP,) �Z - `� �� 2 Altonks and Dipiping <br /> sposal Ce tifcation shall el Agreement andapplicable state l <br /> state and in accordance <br /> dhl <br /> ocal regulations. Remohe val of tanks <br /> dum k <br /> P U 20 RUN PRODUCT PIPINTU <br /> and lines shall comply with API Recommended Practice 1604, Removal and Disposal of Used <br /> Underground Storage Tonks - December 1987 and March 1989 supplementAND . <br /> ' CON ELECIRIUIT iNTCAL 3'. Contractor shall comply with current NFPA and local regulations. <br /> L CONDUIT INTO 4. Chevron Is responsible for removal of all reusable product from the t nks. Product will be <br /> _C_ <br /> C�, � - OPPOSITE $ICES OF returned to terminal or other company facility <br /> 2"0 PRODUCT IN r"I DISPENSERS (TV, 0 B. REMOVAL PROCEDURE' py3"0 SEC. CON, PIPE IJ (SEE PIPWC PLAN) 1. Excavate to the top of each tank. Core must be taken to prevent breaking product piping. Prior <br /> to starting excavation, the contractor shall ensure power is shut off to any circuit, whose <br /> P conduit may cross the excavation. <br /> —\ - 1 a. Suction System: Open check valve, pull poppet and drain product from line into tank, Donot - <br /> \�\ 2"0 PRODUCT IN 18 19 REDUCE VAPOR TO { �� � replace poppet. Reinstall cover o valve. <br /> _ b. Pressure S tem; "Break" a at union of remote p p <br /> � 2'0 LINE 7YP. ccnlainer, <br /> _ --- SEC. CON. PIPE9S <br /> ( ) 2. Avoid spoils, Do not allow product to drain Into soil. Contractor may be held into <br /> if soil se orate <br /> 0 20 contamination occurs during tank and line removal. <br /> 3, Flush all product, vent and vapor return Y <br /> ?�+t►. -`^ ` Q� p p pr back is tank or storage <br /> to Flush <br /> each line <br /> (Flushing in <br /> separate containers can be dumped Into product tanks for storage;) Flush each line with a - <br /> A 2"0 PRODUCT IN minimum of 10 <br /> gallons of water. <br /> __ 3"0 SEC, CON, PIPE Q Q D 4, Open all openings and flush inside o1 each tank with a minimum of 200' gallons of water using <br /> VENT RISERS. �� �- �� '�'�- 18 19 high pressure spray equipment with word to "wash down" the sides and bottom of the.tank. <br /> `- \�< �\ 5. Chevron will orange for a vacuum truck to collect oil recovered product (liquid and sludge) <br /> SEE SITE PLAN FOR ACTUAL LOCATION. 1 - '� r �p.1/J p 0 Vacuum truck is to return 'recovered" product to "slo of Chevron foci(tq or approved l ating <br /> INSTALL MAXIMUM SLOPE FROM TANK F-k MO 'O 5 facility with approved oil/water separatr system. P yUP TO `✓ENT RISER, (MIN. SLOPE 1/4"/F i.). 6 6. The tank roust be Gee of flammable vapors prior to removal. Remove flammable voFOR VENT RISER DETAIL, SEE F-4C EDUCE VAPOR iCt rescribed b the pars os <br /> ' LINE (TYP,) R y presiding lire deportment and tank manufacturer's requirements <br /> 7, After lank ,enllnai, the vapor space shall be tested by placing the combustible gas indictor probe <br /> U 20 Into the fill opening with the drop tube removed. Reading should be token at the bottom, middle. <br /> _ S and upper portions of the lank. The tank atmosphere must be 20% or less of the lower <br /> flammable limit prior to removal. Refer to the probe manufacturer's Instructions for testing in low <br /> 3"0 V.R. ` �- _` 2"0 PRODUCT IN C oxygen conditions, <br /> SLOPE VAPOR RETURN LINE �-2"0 PRODUCT IN �_ <br /> 1/4" PER FT. MIN. DOWN 70 3"0 SEC. CON PIPE �- ```'` 3"0 SEC. CON. PIPE 18 79 �� 8. Prior to removal, all tank openings should be plugged. One plug should have o 1/8" vent hale to <br /> REGULAR UNLEADED TANK -\ �� prevent excessive pressure buildup. This vent hole must face upeord at all times. <br /> 9. Plug any corrosion caused holes usnq screwed boiler plugs. Chevron Rep, will inspect the <br /> removed tanks, then or <br /> 4 C, P. Alt POST-REMOVAL shall UPease the tanks por f to Troth pChev on Rep. <br /> r <br /> 1. All UL. abets shalt ro removed ed given to the Chevron <br /> z �\` 2. All larks must be c da labeled transportation from the site. transport of the conks <br /> \, _ � must be done n accordance kith all stale and local regulations. <br /> O F x �_ g <br /> �\ Z _ 3. Follow any state or local regulations ring my soil samples or inspection d lank hale sand/or <br /> SLOPE PRODUCT LINES tanks When free product is alined during any phase of the removal of underground tanks or <br /> FROM <br /> PER FOOT MINIMUM piping system(s), immediately notify the Chevron Rep. g tank( <br /> ) <br /> 6 <br /> `�\ FROtd DISPENSERS TO TANK (TYP.) <br /> F-R <br /> i� CONTAINMENT SUMP <br /> 2"0 VENT ` \ (TYP. 6)- <br /> S <br /> SEE F-SC NOTE, <br /> � FIBERGLASS SUMP <br /> FSHOWN OR CLARITY.SECTION <br /> 3"0 V.R ` 2"0 VENT- - — SLOPE 3"0 VAPOR RETURN UNE <br /> PER FT. OWN TO <br /> MIN. D ` <br /> 3"x3"xT F.R.P, TEE _ — _ x LAST REGULAR TANK, <br /> 2'0 VENT- <br /> \_ — NOTES <br /> 1. TYPICAL PIPING LAYOUT SHOWN FOR MULTI-PROOUCT DISPENSERS. SEE PLANS FOR <br /> 3"0 V,R. - _ " 2"'A V.R SPECIFIC.DISPENSER TYPE AND CONFIGURATION FOR THIS SITE. <br /> SUpREM �-� \ 2. ALL PRODUCT LINES ARE TO BE SECONDARILY CONTAINED. <br /> UNLEADEp �''• 3 EVERY TANK CONTAINMENT SUMP AND DISPENSER CONTAINMENT SUMP SHALL CONTAIN <br /> SEE SITE PLAN FOR 3"0 V.R. <br /> EXACT INSTALLATION LOCATION 4. CAULK THE BOTTOM OF THE DISPENSERS TO INSURE WATER TIGHTNESS <br /> OF STORAGE TANKS. <br /> PLUS 5. PERPENDICULAR PENETRATIONS OF THE CONTAINMENT SUMPS ARE PREFERRED. <br /> UIv LEgpEp 20' IS THE MAXIMUM ALLOWABLE PENETRATION ANGLE. <br /> m l RECUT 6, SPARE ELECTRICAL CONDUITS MUST BE SEALED. <br /> �NUULgR UN�,E ADED 7. SEE SHEET E-1 FOR ELECTRICAL CONDUIT LAYOUT <br /> LE gDEp 4 REGUL 8; OBTAIN WRITTEN APPROVAL FROM CHEVRON FOR LESS THAN 1/4" PER FOOT <br /> F 1 U R SLOPE ON PRODUCT, VAPOR AND VENT UNES <br /> A <br /> UNDERGROUNDTANK AND PIPING ISOMETRIC P NLEq pE0 B 9 PALL RIME STANDEEL TWANK RAP RALLRSTE LIPIPEND ARE TO BE NG AND RISERS SCH, 40 GALVANIZED PIPE, <br /> SCALE: NONE ` 10, ALL STEEL DISPENSER PIPING AND FITTINGS ARE TO BE SCH. 40 BLACK IRON, <br /> 00 PRIME ALL BLACK IRON FITTINGS. PRIME AND WRAP STEEL PIPING AND RISERS. <br /> MANIFOLDED REGULAR UNLEADED TANKS11 USE ALL SCH 40 BLACK IRON PIPING AND FITTINGS FOR DIESEL INSTALLATIONS. <br /> d PRIME AND WRAP ALL STEEL PIPING AND RISERS. <br /> o SCALE: NONE <br /> u <br /> VI <br /> 12 FOR MANIFOLOED UNLEAD TANKS USING RED JACKET SUBMERSIBLE TURBINE PUMPS <br /> INSTALL A "MORRISON" CHECK VALVE #530-25T OR APPROVED EQUAL AT EACH <br /> UNLEADED PUMP DISCHARGE. <br /> In ATP DISPENSER <br /> OVER 13, USE 3"0 VAPOR RECOVERY PIPING ALL THE WAY BACK TO REGULAR UNLEADED TANK. <br /> N 2°0 PRODUCT IN `� '`�.y —2" 0 PRODUCT IN <br /> 3"0 SEC, CON. PIPE 18 19 3" 0 V R 3" 0 SEC. CON, PIPE 14, SUPREME SIDE OF DISPENSERS MUST ALWAYS BE ON THE LEFT <br /> an <br /> an _ <br /> Lid 2"0 VENT LINES <br /> 20 <br /> �� Chevron US.A, Inc. ("Cawns the copyright rights to the design of the herein described fueling > <br /> ��_-�. <br /> hevron") <br /> G7 system as embodied In any tangible or electronic indium of anal isun including all. budding <br /> ` - designs, architectural n <br /> ol. pis and drawings. The copyrighted material includes the overall form as well as <br /> the arrangement and composition of spaces and elements in the design, but does got include Individual <br /> standard features. Anyone who wishes to copy, distribute or sell this drawing or any derivative works <br /> based hereon must have the prior written consent of Chevron, except for copies made dor the sole CL <br /> purpose of preparing construction drawings for Chevron branded fociites and all such costes shall be Q <br /> returned upon request <br /> ©7Chevron <br /> . (/y <br /> \\\t\l 995 Chh evronion U 5 A. Inc All rights reserved tri I <br /> The drawings, calculations, and any specific reference to equipment, materials or components, <br /> 2"0 VENT LINES` -� if included herein, are generic and not designed for site specific applications, Chevron does not warrant <br /> ..I� or guaranty the accuracy, completeness, merchantability, intended use or applicability of such drawings: <br /> 20 20 V,R. __ calculations, and any referenced equipment, materials or components, to the requirements or <br /> 3"0 V,R� — ` ` needs of your architect determine <br /> \\ any site specific design, applicability, accessiblity,registered <br /> code,amo municipal requirements aonal eng;neer nd any and - <br /> V 3"0 V.R `�� all applicable federal, state and local statutes, rules and regulations which may affect your site <br /> Chevron does not <br /> / provide these services. <br /> 2"'0 V.R. <br /> zISOMErAiG, UNDERGROUND STORAGE TANK Z <br /> N UNLEgpEp DIESEL `��. 1C Chevron A(� wwoPww�uca 9-4275 <br /> REGU ' SDpRE <br /> UNLEA�Rp PLS UNIEgpEp Marketing 2905 W. BENJAMIN HOLT DR. <br /> U <br /> U yLEgp PLUS so V.R. TO REG, STOCKTON, CA. <br /> ED UNLEADED UNLEADED TANK <br /> (NOT SHOWN FOR c ARTY) Revfelane <br /> SCALE; AS SHOWN DATE:I0SEP96 <br /> OPTIONAL PRODUCT ORDER DIESEL TANK ADDITION DR - APP,.- 4 <br /> SCALE: NONE SCALE: NONE SHEET <br /> F-2C <br /> 82552). <br /> FOR REFERENCE ONLY, EXISTING TANKS TO REMAIN <br /> OCT 0 91996 <br />