Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
FIN- PA\4. 6­:\Annn\.,."..L,....;....1\i.."Lo\Anno4bii .1,.- n,+. /-r;-.. (19/11/1 non 11-F7 1_1 +n Xrnfa- <br />"A" SIDE OF <br />34 UNDER DISPENSER DISPENSER � <br />B <br />34 UNDER DISPENSER <br />"B" SIDE OF 1-1/2" VAPOR RECOVERY <br />31 IMP CT VALVE (SHEAR SECTION <br />nA <br />CONTAINMENT SUMP <br />TK3-3 <br />TK3-3 <br />CONTAINMENT SUMP <br />DISPENSER <br />MUST BE FLUSH <br />& STABILIZER BAR UNLEADED <br />ASSEMBLY PREMIUM VAPOR <br />& STABILIZER BAR <br />ASSEMBLY <br />TOP OF <br />CONCRETE DRIVE SLAB <br />W/ TOP OF PUMP ISLAND) <br />92 OCTANE <br />RECOVERY <br />UNL PREM VAPOR UNLEADED <br />/�.— DISPENSER ISLAND 39 <br />92 OCTANE RECOVERY 87 OCTANE <br />0 <br />UNLEADED <br />—1-1/2" x 1" <br />REDUCER BUSHING <br />-•, a • ". -, o <br />- <br />87 OCTANE <br />>, <br />ol <br />1-1/2" FLEX CONNECTOR <br />I° 32 (ITH. 4 PLCS.) <br />" I ° I 1-1/2" STAGE II VAPOR <br />PCOi <br />37 <br />\ \ \/\\/a\ /\�/4\\yT//� <br />31 RECOVERY EMERGENCY <br />BULKHEAD FITTING <br />y/\�/ <br />z O <br />SHEAR IMPACT VALVE <br />, SAND OR PEAGRAVEL <br />BACKFILL <br />UNDER DISPENSER <br />.,, 34 CONTAINMENT SUMP <br />• <br />(u (n <br />32 <br />1JACKET FLEX CONN. <br />A <br />A <br />// <br />I I I 32 CON (TYP.X4 PLCS.) <br />l <br />------- <br />W/ <br />2° BELL x MALE <br />}'� c) <br />0 Y �Q <br />TK3-3 <br />TK3-3 <br />P P V <br />2" FIBERGLASS <br />45" ELBOW <br />W <br />r <br />"B" SIDE OF <br />I <br />I <br />3" FIBERGLASS TEE W/ <br />V <br />DISPENSER <br />EDGE OF TRENCH <br />1 <br />NATIVE SOIL <br />2" REDUCING BUSHINGG <br />r <br />— — — — — — — — — - - <br />— — <br />NOTE: SEE TK4-3 FOR <br />a V <br />o o O <br />3" FIBERGLASS STAGE II 40 <br />MATERIAL LIST <br />I <br />c o <br />VAPOR RECOVERY PIPEl o <br />A <br />VAPOR RECOVERY <br />of <br />A <br />0 0 <br />0 0 2" FIBERGLASS 45' ELL (TYP.) <br />o o o <br />Vapor Recovery <br />Piping at Dispenser <br />L. I <br />PRODUCT o o <br />/ <br />CO <br />LINE o o <br />0 o <br />- <br />3" FIBERGLASS TEE (TYP.) <br />W/ 2" REDUCING <br />30 1-1/2" PRODUCT EMERGENCY <br />SHEAR IMPACT VALVEDOUBLE <br />f NOT TO SCALE: <br />N <br />0 o <br />BUSHING <br />POPPETED <br />W <br />PRODUCT o 0 0 0 <br />(TYP. 2 PLCS,) <br />:,{� 0 <br />LINE - <br />/0 <br />A <br />THIS IS A VIEW FROM "B" SIDE OF DISPENSER <br />1-1/2" IMPACT VALVE W/ UNION <br />TOP 30 <br />U <br />NOTES: <br />((SHEAR SECTION MUST BEE FLUSH <br />W/ TOP OF PUMP ISLAND) <br />ry.+ L_ <br />{rr Cd <br />1 <br />VAPOR LINESSLOPE FROM DISPENSERS TO TANKS 1/8" <br />MIN. <br />"B" SIDE OF DISPENSER ISLANDPER <br />\� sC <br />TOP OF <br />TOP <br />CONCRETE DRIVE -SLAB <br />DISPENSER <br />2. <br />THE VAPOR RECOVERY SHEAR VALVE SHALL BE A TOP ENTRY VALVE. <br />SEE <br />EDGE OF TRENCH <br />SECTION B ON THIS SHEET <br />21 2" FIBERGLASS PRIMARY PIPE (TYP.) <br />3. <br />ALL SHEAR VALVES SHALL BE SECURELY MOUNTED TO THE STABILIZER34 <br />UNDER DISPENSE, <br />sp N <br />ae• <br />2p 3" FIBERGLASS SECONDARY PIPE (TYP.) <br />BAR ASSEMBLY TO ASSURE VALVES WILL TRIP AND OR SHEAR UPON AN <br />_ <br />- .,, <br />C <br />B <br />IMPACT ON THE DISPENSER OF DESIGN CONDITIONS.Ir <br />° <br />,;,t <br />3" FIBERGLASS TEE AND <br />TK3-3 TK3--3 <br />4. <br />ALL UNDER DISPENSER CONTAINMENT SUMPS AND FITTINGS ARE PLUMBED BY <br />++` <br />" °° <br />\ \ \ \ \ \ \ \ \ <br />W <br />3" FIBERGLASS 45' ELL. (TYP.) <br />THE CONTRACTOR. <br />(SECONDARY) <br />5. <br />THE LOCATION OF THE PRODUCT AND VAPOR RECOVERY PIPING STUB -UPS SHALL <br />BE AS SHOWN CONTRACTOR IS RESPONSIBLE FOR CORRECT ORIENTATION <br />SAND OR PEAGRAVEL <br />BACKFILL <br />BULKHEAD FITTING 36 <br />J <br />Plan View Detail (Blending) <br />OF THE STUB UPS TO THE DISPENSER. ANY ADJUSTMENTS OF THE INTERNAL WORKINGS <br />OF THE DISPENSER TO ACCOMMODATE INCORRECTLY INSTALLED PIPING WILL BE AT <br />_ ____ _ <br />CONTRACTORS OWN EXPENSE. <br />32 1-1/2"x24" FLEX CONN. <br />Three Product MPD <br />Piping <br />Section Shear Valve Section <br />- -- - W/ JACKET <br />/\ <br />r� <br />2" BELL x MALE <br />(PRIMARY PIPING) <br />NOT TO SCALE: <br />NOT TO SCALE: <br />tO <br />P P V <br />VIM <br />DISPENSER AUXILIARY <br />\\\ <br />JUNCTION BOX (INTERCOM) <br />.L_ <br />"A" SIDE OF <br />`NATIVE SOIL <br />Q <br />"B" SIDE OF <br />DISPENSER <br />DISPENSER <br />DISPENSER <br />NOTE: SEE TK4-3 FOR <br />MATERIAL LIST <br />w�. <br />Or <br />JUNCTION BOX <br />MULTI -PRODUCT <br />DISPENSER <br />DISPENSER <br />E iA <br />"% A <br />1 -1/2 -IMPACT VALVE W/ UNION TOP 30 <br />Cd a <br />C <br />((S(10 <br />HEARR SECTION MUST BE FLUSH <br />W/ TOP OF PUMP ISLAND) SEAL OFF <br />Product Piping at Dispenser <br />,� <br />> <br />35 <br />SPLASH GUARD <br />L <br />DISPENSER MONITORING <br />SENSOR. MOUNTING <br />NOT TO SCALE: <br />Q <br />kd.'! <br />OF SENSOR NOT SHOWN. <br />6" RAISED FULL RADIUS DISPENSER ISLAND 39 <br />SEE DETAIL #17 ON TK3-4L <br />Cd r <br />� O — <br />a a <br />o o <br />O U <br />E� ys <br />TOP OF CONCRETE DRIVE <br />a <br />SLAB a° <° - <br />o. o. UNDER DISPENSER CONTAINMENT <br />- �O 34 SUMP. SIZE TO MATCH <br />DISPENSE FOOTPRINT. <br />COMPACTED SAND OR <br />PEAGRAVEL BACKFILL <br />= :b O <br />E <br />- a ° ". <br />° " <br />6" BASE OR SURFACE <br />MAT RiAL WHERE <br />Cd U L <br />I <br />.di <br />° a <br />° <br />REQ D BY OWNERS <br />— TOP OF FINISHED SURFACE <br />/ <br />C <br />.o <br />°a°. -a. <br />ENGINEER <br />/ <br />•� 0 <br />Ca de' <br />W 00 <br />O <br />36 BULKHEAD FITTING <br />rn <br />w <br />•� ii <br />X a <br />A., <br />O' <br />21 2" PRIMARY <br />COMPRE$SIOT <br />CLAMP (iYP.) <br />- - - - -o` <br />< <br />( 2 <br />WNCAO.QL_ <br />CONTAINMENT PIP <br />38 <br />.- <br />w <br />20 3" SECONDARY <br />3/4"C, DISPENSER POWER <br />AND COMMUNICATION TO BLDG. <br />" <br />(, <br />Z <br />CONTAINMENT PIPE <br />32 1-1(2%24" FLEX CONN. (1 CONDUIT HOMERUN PER DISPENSER) <br />� <br />O <br />Q <br />W/ LEX JACKET ISOLATI <br />J <br />-- --` --- -------- <br />3/4"C, INTERCOM TO BLDG. <br />('ONE <br />U <br />O <br />CONDUIT PER DISPENSER) <br />REROUTE AT <br />VAPOR RECOVERY LINE <br />Ed <br />--- <br />m <br />-- - --- ---------- ss <br />CONDUIT BUILDING <br />TO SALE COUNTER AREA <br />12" 7"+ 7"+ 2 PRODUCT PIPING LINES % <br />K <br />di <br />TYP. <br />OL <br />\ <br />3/4"C, VEEDER ROOT MONITORING <br />COMMUNICATION <br />(ONE CONDUIITPERE DISPENSER) <br />�"+ 13 AI I <br />Gtr/410 EN 01N��Q <br />NOTE: CONTRACTOR SHALL <br />TRENCHES FROM <br />TAKE PRECAUTIONS TO PROTECT HOLE AND <br />SURFACE WATER RUNOFF UNTIL PAVING IS REPLACED. r; <br />iwro vw+Nmc oeswN mecwmr <br />2" BELL x MALE <br />.lm <br />(PRIMARY PIPING NOTE: SEE TK4 3 FOR <br />) <br />MATERIAL LIST <br />Jp•106ry <br />' �j�} p �p <br />LJ�' ) I W A, f <br />\'' <br />\° <br />1xEN6, WASNINGTONE980321 <br />T <br />Fazs) zs1-6222 <br />Typical <br />yp <br />Pi in in Trench <br />p g `xf <br />NOTE: <br />F(' <br />BCE# 4009 <br />UNDER DISPENSER CONTAINMENT SHALL BE EQUIPPED <br />WITH A POSITIVE SHUTDOWN <br />D <br />_, �f <br />q <br />master release date <br />ELECTRONIC SENSOR THAT WILL INTERRUPT POWER TO THE DISPENSER. NOTE: <br />NOT TO SCALE: <br />pd <br />ALL FITTINGS IN UNDER DISPENSER CONTAINMENT SUMP/iC/�O <br />ARE INSTALLED BY THE CONTRACTOR. <br />ENTER "A" <br />NO. <br />ARCO PRODUCTS COMPANY MASTER REVISIONS <br />fJ OO <br />w <br />ELECTRICAL PENETRATIONS FROM THE SIDE <br />pro;. axe. drawn by <br />OF THE DISPENSER. PRODUCT AND VAPOR RECOVERY <br />NO. DATE REVISIONS PROJECT RELEASE <br />VAPOR RECOVERY NOT SHOWN THIS VIEW <br />PENETRATIONS ARE LOCATED ON THE "B" SIDE OF <br />BFOR <br />1/30/99 SHK <br />d <br />Typical Under Dispenser <br />THE DISPENSER. <br />PLAN 2/5/99 <br />/ tati0ty <br />Project <br />0 <br />h <br />Containment Sump <br />BID <br />RELEASE 2/5/99 <br />2133 <br />Z <br />'��" <br />CONST. <br />sheet / file <br />C9 <br />NOT TO SCALE: <br />RELEASE <br />EdTK3--3 <br />AS -BUILT <br />of <br />FIN- PA\4. 6­:\Annn\.,."..L,....;....1\i.."Lo\Anno4bii .1,.- n,+. /-r;-.. (19/11/1 non 11-F7 1_1 +n Xrnfa- <br />