My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2300 - Underground Storage Tank Program
>
PR0231883
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:52 AM
Creation date
11/5/2018 11:53:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231883
PE
2351
FACILITY_ID
FA0002111
FACILITY_NAME
BEN HOLT SHELL
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
02
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3011\PR0231883\INSTALL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. � Secondary container other than double-walled tanks (includes interception <br /> and detection systems). (Section 2633 Ml <br /> A. Backfill in secondary container. [Section 2635 (c) 1-81 <br /> _ B. Pore space of granular material used as backfill for primary container(s) complies with Section 2631 <br /> (g). [Engineering data to support capacity requirement]. <br /> _ C. Two or more primary containers within secondary container. (include information on product <br /> compatibility) <br /> _ D. Secondary container capable of precluding highest anticipated groundwater. <br /> _ E. Secondary container sloped to a monitoring sump from which leakage or precipitation can be detected <br /> and removed. <br /> _ F. water tight corner which extends at least a foot beyond each boundary of the secondary container <br /> excavation, sloped to drain away from excavation. <br /> 20. Secondary containers) thickness, density, composition, product compatibility. <br /> Sized to contain unauthorized releases from primary containers to allow sufficient time for detection and removal. <br /> [Section 2631 (c)] <br /> 21. Secondary container(s) volumetric requirements: [Section 2631 (e) (1) <br /> 14 and (2)] <br /> _ A. Single primary containers = 100%. <br /> B. Multiple primary containers = 150% of largest primary container or 10% above aggregate. <br /> 22. 777� Secondary container(s) open to rainfall. [ Section 2631 (f)] <br /> "' Volumetric requirements = 24 hours of 100 year storm in addition to primary container volumes. <br /> 23. A* Secondary container floor. [Section 2631 (i)] <br /> A. Constructed on firm base. <br /> B. Sloped to collection sump ( 1/8 inch per foot). <br /> _ (1) One or more access casings installed in sump. <br /> (a) Size to allow removal of collected liquid. <br /> (b) Extended to ground surface. <br /> _ (c) Covered with a locked waterproof cap or <br /> within a secured facility. <br /> _ (d) Thickness allows for anticipated stresses. <br /> _ (e) Construction materials are not weakened stored product or will not donate, <br /> capture, or mask constituents to be monitored. <br /> 24. Membrane liner specifications. [Section 2631; k, 1, and ml <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.