Laserfiche WebLink
A & S ENGINEERING INC. <br /> PLANNING • ENGINEERING • CONSTRUCTION MANAGEMENT <br /> 45 QUAIL COURT, 9TE. 303, WALNUT CREEK, CA. 94596 • PHONE: 510.933-0578 • FAX 510-933-0588 <br /> 6) The"EB W"#705-458-01 (5)gallon manhole is to be installed for the vapor recovery and <br /> the"EBW"#715-456-01 (15)gallon manhole is to be installed for the fills. <br /> 7) The monitoring panel is to be installed in the existing building. <br /> 8) Complete pump shut down is achieved in the following manner: when liquid is detected <br /> in the dispenser containment box or the turbine containment rod,power to the sub-pumps <br /> is cut-off and can only be restored by the authorized service technician who determines <br /> the root of the problem. <br /> 9) The Containment Technologies Corporation(CTC)flex boots are 100%compatible with <br /> methanol(see the attached documentation). <br /> 10) The tanks to be removed will be tested for leaded gasoline also, as required by the San <br /> Joaquin County Environmental Health Division. <br /> 11) 30 lbs of dry ice per every 1000 gallons of tank capacity will be used in the <br /> decontamination/inerting of the underground tanks that are being removed. <br /> Please use this information in your review of this project. These are items that have previously <br /> come to us as plan check comments. We are providing this information in order to prevent repeat <br /> plan check comments. Feel free to call Tom Piskor at(510)933-0578 if you have any questions <br /> or comments. Thank you. <br /> ASincerel <br /> General Manager <br /> f <br />