My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2300 - Underground Storage Tank Program
>
PR0231883
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:52 AM
Creation date
11/5/2018 11:57:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231883
PE
2351
FACILITY_ID
FA0002111
FACILITY_NAME
BEN HOLT SHELL
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
02
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3011\PR0231883\INSTALL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S 6- 00,, E PROPERTY LINE 155.00' S75' 22' 34"E <br />15.01' 15.14' <br />I I <br />I , I <br />L <br />'O <br />n <br />N <br />N <br />N <br />N� <br />21 <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />r <br />I <br />I <br />( <br />I <br />L =__ 15,02 <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />REQUIRED INSPECTIONS: <br />ALL APPOINTMENTS FOR INSPECTIONS MUST BE MADE AT LEAST 48 HOURS IN ADVANCE <br />FOR THE FOLLOWING: <br />PRIMARY AND SECONDARY TANK(S) SHALL BE TESTED PNEUMATICALLY AT 3-5 P.S.I. <br />FOR ONE HOUR; ONE-HALF HOUR FOR PRIMARY TANK AND ONE-HALF HOUR FOR <br />SECONDARY TANK. DOUBLE WALLED TANKS ARE EXEMPT IF ANNULAR SPACE IS <br />MONITORED USING EITHER PRESSURE OR VACUUM TESTING. (ALL EXTERNAL CONNECTIONS <br />SHALL BE SOAP TESTED WHILE UNDER PRESSURE). <br />PRESSURE PIPING SHALL BE HYDROSTATICALLY TESTED TO 150% OR PNEUMATICALLY TESTED <br />TO 110% OF MAXIMUM ANTICIPATED SYSTEM PRESSURE BUT NOT LESS THAN 5 LBS. <br />INCH AT THE HIGHEST POINT OF THE SYSTEM FOR A MINIMUM OF 20 MINUTES, <br />THEIR THAN PRESSURE PIPING SHALL BE PRESSURE TESTED AT NOT LESS THAN <br />NOT MORE THAN 5 P.S.I. FOR A MINIMUM OF 20 MINUTES AND SOAP TESTED <br />I PRESSURE. <br />T SUMPS SHALL PASS A 24 HOUR LEAK TEST. <br />OTECTION SHALL BE CAPABLE OF DRAINING LIQUID BACK INTO FUEL TANKS. <br />SYSTEM SHALL PASS A FUNCTIONAL TEST. THE FUNCTIONAL TEST SHALL CONSIST <br />DATION OF THE ALARM NA THE MONITORING PROBES/SENSORS. <br />:TION AND APPROVAL TO OPERATE WILL BE GRANTED AFTER THE ABOVE <br />5 ARE SATISFIED AND A HARD COPY OF THE PRECISION TEST IS SUBMITTED <br />R AT SITE. <br />'ROVED PRINTSET OF THE UST INSTALLATION SHALL BE KEPT AT THE JOB SITE AND <br />E INSPECTOR UPON REQUEST. IN ADDITION, THE LOCAL FIRE DEPARTMENT SHALL <br />BON PRIOR TO COMMENCEMENT OF WORK. <br />ASSISTANCE, OR WISH TO SCHEDULE AN APPOINTMENT TO DISCUSS THE PLAN REVIEW <br />.EASE CONTACT OUR UNDERGROUND STORAGE TANK STAFF AT (209) 463-3427. <br />---�-rrRl <br />N HOLT DRIVE <br />r r <br />ISLAND <br />ISLAND <br />NOTE! ALL EXISTING ITEMS ARE TO REMAIN <br />UNLESS NOTED OTHERWISE. <br />LEGEND <br />NEW UNDERGROUND 2"0 <br />DOUBLE WALL FIBERGLASS <br />PRODUCT LINE (SLOPE 1/4" <br />PER 12" MIN. UPWARD FROM <br />TANK) <br />— — — NEW UNDERGROUND SINGLE-WALL <br />FIBERGLASS VENT/VAPOR LINES <br />2"0 OR 3"0 (SLOPE 1/4" PER 12" <br />MIN. UPWARD FROM TANK). PIPING <br />TO BE 3' AFTER MANIFOLD OF <br />THE VAPOR RECOVERY LINES, <br />VR VAPOR RETURN <br />R REGULAR UNLEADED <br />P PREMIUM UNLEADED <br />V VENT LINES <br />NEW CONCRETE <br />APPROVALS <br />AREA ENGINEERING MANAGER DATE <br />DISTRICT MANAGER DATE <br />DISTRIBUTION MANAGER DATE <br />CONSTRUCTION/DISTRICT ENGINEER DATE <br />PLANS PREPARED BY: <br />A A S ENGINEERING <br />PLANNING ENGINEERING CONSTRUCTION MANAGEMENT <br />45 QUAIL COURT, SUITE 303 <br />WALNUT CREEK, CALIFORNIA 94596 <br />PHONE: 510-933-0578 FAX: 510-933-0588 <br />7%07 <br />0 5 10 15 <br />GRAPHIC SCALE <br />UNDERGROUND PIPING GENERAL NOTES <br />1. SHELL SERVICE STATION SPECIFICATIONS ARE TO BE FOLLOWED <br />FOR ALL WORK PERFORMED AT THIS SITE <br />2. ALL WORK, INCLUDING PLUMBING AND ELECTRICAL, SHALL BE <br />PERFORMED IN ACCORDANCE WITH LOCAL ADOPTED BUILDING <br />CODES AND SUPPLEMENTARY ORDINANCES, ALL AS DIRECTED BY <br />COMPANY REPRESENTATIVE. <br />3, CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS AT <br />THE SITE. NOTIFY COMPANY REPRESENTATIVE OF ANY DISCREPANCIES <br />BETWEEN SITE CONDITIONS AND INFORMATION SHOWN ON DRAWINGS, <br />PRIOR TO COMMENCING WORK. <br />4. ALL BACKFILL OF UTILITY TRENCHES TO BE CLEAN WASHED SAND. <br />5, PIPING: A,0. SMITH RED THREAD II DOUBLF-WALL (PRODUCT). <br />SINGLE-WALL (VENT/VAPOR). <br />5. CONTRACTOR SHALL PROVIDE A COMPLETE FUNCTIONING FUEL <br />DISPENSING SYSTEM MEETING THE LETTER AND INTENT OF THESE <br />PLANS AND SPECIFICATIONS. <br />7. TANKS: 2-15,000 GALLON XERXES UNDERGROUND DOUBLE- <br />WALL FIBERGLASS TANKS (TANKS 10' DIAMETER) <br />8. INSTALL 8" REINFORCED CONCRETE SLAB OVER TANKS, SET MANHOLE <br />COVERS 1 1/2" ABOVE SLAB. GRADE TO DRAIN. <br />9. ALL FITTINGS AND OPENINGS SHALL BE SECONDARILY CONTAINED <br />PER TANK MANUFACTURERS SPECIFICATIONS. <br />10. ALL FILL BOXES TO BE 15 GALLONS MINIMUM & WATERTIGHT, <br />I" ABOVE SURFACE. (TYPICAL FOR PHASE 1 VAPOR RECOVERY) <br />11. ALL MANHOLE COVERS TO BE WATERTIGHT. <br />12. INSTALL 2-3/4 H.P. SUB -PUMPS WITH A.P.I. DETECTORS. <br />13. INSTALL 2-2"0 DOUBLEWALL FIBERGLASS UNDERGROUND PRODUCT <br />LINES WITH PRESSURE MONITOR (FOR QUICK SHUT -DOWN). SEE <br />EQUIPMENT LIST & SPECIFICATIONS FOR COMPLETE EQUIPMENT <br />LISTING. ATTACH LIQUID PROBE LEAK MONITOR, WITH PIPING SUMP <br />TO TANKS. <br />14. INSTALL 1-3"0 UNDERGROUND SINGLE-WALL FIBERGLASS VAPOR <br />RECOVERY LINE. MANIFOLD FROM MULTI -PRODUCT DISPENSERS <br />TO REGULAR UNLEADED TANK, <br />15. INSTALL 2-2"0 UNDERGROUND SINGLEWALL FIBERGLASS VENT <br />LINES (ONE FROM EACH TANK TO VENT RISERS.) <br />SLOPE 1/4" PER FOOT MINIMUM BACK TO TANKS. <br />16. SLOPE ALL NEW PRODUCT/VAPOR RECOVERY PIPING 1/4" <br />PER FOOT MINIMUM BACK TO TANKS. <br />17. EXCAVATION FOR TANKS SHALL BE PER OSHA REQUIRMENTS. <br />18, PROVIDE DEADMEN & STRAPS PER DRAWING If TP -8 <br />19. PROVIDE TANK SHORING. (NOTE• 10' DIAMETER TANKS) <br />20. GENERAL CONTRACTOR SHALL FURNISH & INSTALL DEADMAN <br />HOLD DOWNS FOR ALL TANKS IN ACCORDANCE WITH DETAILS <br />ON TANK DRAMNGS. IT IS CRITICAL THAT YOU MEET THE CROSS <br />SECTIONAL DESIGN & REINFORCEMENT REQUIREMENTS. IF YOU <br />ELECT TO USE PRE -FABRICATED CONCRETE DEADMAN HOLD DOWN <br />UNITS, SHELL REQUIRES ENGINEERING CALCULATIONS TO CONFIRM <br />THAT SYSTEM IS EQUAL TO SHELL'S DESIGN. <br />21. ALL TESTING REQUIREMENTS (TANKS, LINES, BLOCKAGE TEST, <br />PRESSURE DECAL, CALIBRATION. ETC.) SHALL BE THE RESPONSIBILITY <br />OF THE GENERAL CONTRACTOR & INCLUDED IN BASE BID, NO <br />EXCEPTIONS. <br />22. JTH-LINE PRESSURE MONITOR NOT REOUIRED <br />I <br />2" FIBERGLASS <br />VAPOR PIPING <br />3" FIBERGLASS TEE FROM DISPENSE <br />3" x 2" <br />FIBERGLASS <br />BUSHINGS <br />3" FIBERGLASS <br />VAPOR <br />PIPING TO <br />TANKS <br />2"/3" VAPOR PIPING <br />CONNECTION DETAIL <br />NO SCALE <br />REVISIONS <br />SHELL OIL COMPANY <br />HOUSTON, TEXAS <br />PROPOSED PIPING PLAN <br />3011 W. BENJAMIN HOLT DR. & WESTSIDE FRWY. <br />STOCKTON, CALIFORNIA <br />I = 1()'-()L.4 DRAWING # TP -1 <br />1/19/95 WIC #204-7524-4404 <br />CHKD. BY: VP <br />O SHELL OIL COMPANY, ALL RIGHTS RESERVED 1995. <br />
The URL can be used to link to this page
Your browser does not support the video tag.