My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2300 - Underground Storage Tank Program
>
PR0231883
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:52 AM
Creation date
11/5/2018 11:57:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231883
PE
2351
FACILITY_ID
FA0002111
FACILITY_NAME
BEN HOLT SHELL
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
02
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3011\PR0231883\INSTALL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />K <br />r <br />C <br />F <br />E <br />3 <br />LOCKING ACCESS BOX <br />1/2" RISER VENT <br />4" THREADED PVC OR ABS <br />SCHED 80 PIPE WITH <br />3/4" RIGID COITHREADED CAP <br />UNCTION IBOXjBRINE <br />LIQUID LEVEL <br />TALLATION DWGS. <br />4" STEEL NPTCOATED W/ FTER OR <br />BY FACTORY SURFACE <br />FRP TANK WITH INTEGRAL R-25 <br />FRP RESERVOIR <br />RESERVOIR MONITOR <br />s I g 7 1 O I v I IV <br />NOTE: CONNECT 3" VAPOR RETURN PIPING TO LOWEST <br />NT <br />MAXIMUMDEPTHOF RISER 4" <br />BOIX, <br />EON NONE #1 <br />L <br />FOR TRUCKAH OSEP CONNECTAION <br />18"0 <br />ACCESS BOX <br />+n' <br />EXPLOSION PROOF J -BOX <br />PRESSURE EQUALIZATION <br />WITH <br />II <br />1 1 <br />3/4' <br />C. TO OTHER SUMP MONITORING <br />9 <br />Y ORY13REAK BY 4" NPT REDUCER <br />1 <br />1 II <br />1 1 <br />SEE EQUIPMENT LIST. <br />PLATE BY <br />p <br />'.' <br />1 <br />I II <br />1 1 <br />NOTE: <br />tl <br />FITTING (TYP OF 2) / <br />I <br />,•. <br />GALV NIPPLE <br />HINGE PARALLEL TO TRUCK <br />w > <br />MONITORING <br />I II <br />UNION <br />FILL & STAGE <br />I VR <br />CONDUIT W/ TO SUMP <br />I II <br />1 II <br />11 <br />; <br />w <br />SEAL OFF 3/4" CONDUIT TO <br />1 II <br />I <br />Z; <br />II <br />11 <br />REDUCING BUSHING <br />1 II <br />w <br />a <br />'� <br />3/4" C. TO TLM SENSERS -+ MANHOLE SUMP J -BOX <br />��. <br />2 LAYERS OF 1" RIGID <br />2" MAX <br />F <br />7 < <br />OF PIPING SUMP, <br />II <br />FOAM PADS W/2" DRAIN <br />12" <br />MIN. <br />BALL FLOAT VALVE <br />F <br />,��.�.r,m,-- <br />��II <br />+ <br />INTO TANK <br />�TYPAOF 2)NSIDE) <br />s I g 7 1 O I v I IV <br />FIBERGLASS COLLmi <br />lz I N I w 1 w I .v I v I Ia <br />TO CONC. SLAB <br />BOOT <br />8" DIA FGLS, <br />CONTAINMENT PIPE <br />INSTALLED AT <br />/I1 JOB SITE <br />.-�1" NIOIU CONDUIT <br />GALV. STEEL RISER - `— OUTER SHELL OF <br />RONAN HVA DOUBI EWALL TANK <br />LIQUID SENSOR OR SHELL OF <br />LOCATION EXISTING SINGLEWALL <br />TANK <br />RISER CONTAINMENT <br />CONNECTION AT TANK <br />RONAN TLM PROBE LOCKING ACCESS BOX <br />MOUNTING FITTING <br />4" CAP ON RONAN <br />O:F <br />BRASS ADAPTER ^\ EXPt.OSION-PROOF <br />EXPLOSION J -EU% <br />TLM J -80X FF <br />NOTE: CONNECT 3" VAPOR RETURN PIPING TO LOWEST <br />NT <br />MAXIMUMDEPTHOF RISER 4" <br />BOIX, <br />EON NONE #1 <br />L <br />FOR TRUCKAH OSEP CONNECTAION <br />18"0 <br />ACCESS BOX <br />+n' <br />EXPLOSION PROOF J -BOX <br />PRESSURE EQUALIZATION <br />WITH <br />1' C. TO CONTROLLER AND <br />HYDROCARBON ABSORBENT <br />3/4' <br />C. TO OTHER SUMP MONITORING <br />SAUSAGE, NOT FURNISHED <br />Y ORY13REAK BY 4" NPT REDUCER <br />UY SPILL BOX MANUFACIUNLH <br />STL. STRIKER <br />EXTEND UP TO HOSE <br />SEE EQUIPMENT LIST. <br />PLATE BY <br />12'0 ACCESS/ SPILL <br />'.' <br />FACTORY <br />2" FRP TO VENT RISER <br />.X19 <br />NOTE: <br />4' <br />FITTING (TYP OF 2) / <br />CONTAINMENT BOX <br />,•. <br />GALV NIPPLE <br />HINGE PARALLEL TO TRUCK <br />w > <br />MONITORING <br />PATH SUCH THAT INNER <br />UNION <br />FILL & STAGE <br />I VR <br />CONDUIT W/ TO SUMP <br />_ <br />(NOOTOWA DS)YTRFROM <br />UCK, <br />; <br />w <br />SEAL OFF 3/4" CONDUIT TO <br />MOUNTED 1" ABOVE TANK IN <br />Z; <br />ACCESS HOLE <br />FRP SUMP <br />REDUCING BUSHING <br />w <br />a <br />'� <br />3/4" C. TO TLM SENSERS -+ MANHOLE SUMP J -BOX <br />��. <br />2 LAYERS OF 1" RIGID <br />2" MAX <br />7 < <br />OF PIPING SUMP, <br />FOAM PADS W/2" DRAIN <br />a <br />FI@€RcEnss IN§uUnTIoN <br />BALL FLOAT VALVE <br />F <br />SLOTS IN BOTfOM LAYER <br />BOOT W/ STAINLESS WORM <br />INTO TANK <br />�TYPAOF 2)NSIDE) <br />WAY <br />BETWEEN CONTAINMENT <br />Hoot w/ srnwlrss <br />ztrrl _ <br />FLEXIBL7000T EQUAL) <br />FIELD LOCATE <br />ACCESS PLUG <br />OF TA K <br />SUMP PENETRATION . <br />BOX ea CONC TANK 9LAp <br />WORM CLAMPS AND <br />6X4 BUSHING <br />FITTING <br />PRODUCT LINE <br />(TYP OF 2) --v, <br />Z <br />,y <br />SUMP PENETRATION <br />2' FRP PRODUCT PIPE <br />RONAN CONTROLLER <br />FITTING (TYP OF 2) <br />BOOT <br />FIBERGLASS <br />SEATS <br />3/4' CONDUIT TO TURBINE <br />.• <br />3'-0" MIN, SEE - - <br />CONTAINMENT RISER —AIR <br />� <br />N <br />NK MFR) PIPING SUMP <br />W <br />W Z <br />3 <br />Z <br />z <br />PENETRATE SUMP WALL ABOVE <br />a <br />GALV. RISER (TYP) <br />1 <br />1 <br />SITE PLAN FOR <br />& <br />N <br />w <br />t�i <br />TEST <br />EXTENSION TO GRADE <br />it <br />RONAN LS -3 <br />-. N <br />a <br />I <br />LL,OUID SENSOR <br />I TANK SIZE <br />ACCESS BOX <br />VALVES. <br />2" FITTING <br />(TYP OF 2) <br />P'o'o/ <br />1" CONOUIT TO DOUBLE <br />1 <br />1' <br />I <br />PLAN <br />1" CONDUIT W/ RONAN <br />FIBERGLASS COLLAR <br />— <br />w <br />— <br />✓ -� <br />HVA LIQUID SENSOR <br />FIBERGLASS COLLmi <br />lz I N I w 1 w I .v I v I Ia <br />TO CONC. SLAB <br />BOOT <br />8" DIA FGLS, <br />CONTAINMENT PIPE <br />INSTALLED AT <br />/I1 JOB SITE <br />.-�1" NIOIU CONDUIT <br />GALV. STEEL RISER - `— OUTER SHELL OF <br />RONAN HVA DOUBI EWALL TANK <br />LIQUID SENSOR OR SHELL OF <br />LOCATION EXISTING SINGLEWALL <br />TANK <br />RISER CONTAINMENT <br />CONNECTION AT TANK <br />RONAN TLM PROBE LOCKING ACCESS BOX <br />MOUNTING FITTING <br />4" CAP ON RONAN <br />O:F <br />BRASS ADAPTER ^\ EXPt.OSION-PROOF <br />EXPLOSION J -EU% <br />TLM J -80X FF <br />NOTE: CONNECT 3" VAPOR RETURN PIPING TO LOWEST <br />r <br />OCTANE UNLEADED, MANIFOLD TO OTHER TANKS WITH 2" <br />TECHNOLOGIES <br />DOUSLEWALL FRP TANK <br />MANIFOLD <br />NUMBER <br />_"-------3/16 0 HOLE FOR <br />+n' <br />SUMP WALL <br />PRESSURE EQUALIZATION <br />3° FRP STAGE II <br />W75i <br />DBL -WALL <br />AUTOMATIC FILL TUBE <br />i7�s <br />LAMINATED <br />SHUTOFF, TUBE MUST <br />4" TO 0' <br />STL. STRIKER <br />EXTEND UP TO HOSE <br />ISLANDS, (TYP OF 2) <br />PLATE BY <br />CONNECTION COLLAR <br />4XXl <br />FACTORY <br />2" FRP TO VENT RISER <br />.X19 <br />NOTE: <br />4' <br />FITTING (TYP OF 2) / <br />1. ORIENT BOX INNER LID <br />GALV NIPPLE <br />HINGE PARALLEL TO TRUCK <br />w > <br />MONITORING <br />PATH SUCH THAT INNER <br />UNION <br />FILL & STAGE <br />I VR <br />CONDUIT W/ TO SUMP <br />_ <br />(NOOTOWA DS)YTRFROM <br />UCK, <br />FIBERGLASS COLLmi <br />lz I N I w 1 w I .v I v I Ia <br />TO CONC. SLAB <br />BOOT <br />8" DIA FGLS, <br />CONTAINMENT PIPE <br />INSTALLED AT <br />/I1 JOB SITE <br />.-�1" NIOIU CONDUIT <br />GALV. STEEL RISER - `— OUTER SHELL OF <br />RONAN HVA DOUBI EWALL TANK <br />LIQUID SENSOR OR SHELL OF <br />LOCATION EXISTING SINGLEWALL <br />TANK <br />RISER CONTAINMENT <br />CONNECTION AT TANK <br />RONAN TLM PROBE LOCKING ACCESS BOX <br />MOUNTING FITTING <br />4" CAP ON RONAN <br />O:F <br />BRASS ADAPTER ^\ EXPt.OSION-PROOF <br />EXPLOSION J -EU% <br />TLM J -80X FF <br />7 CONCRETE KNOCK -OUT <br />I <br />10" SCH 40 PVC MONITOR <br />- PORT WITH CONTINUOUS <br />0.02" MACHINED SLOTS <br />$$cc THREADED CONNECTIONS <br />PEA GRAVEL (NO GLUED JOINTS) i <br />BOTTOM OF <br />TANK HOLE <br />EXCAVATION <br />THREADED <br />PVC CAP <br />1% 2" SCORED JOINT <br />!" EXPANSION JOINT <br />DOWELS 0 8" O.C. <br />BORING SLEEVE <br />BULKHEAD <br />FITTING — <br />3' FRP DxM <br />FIELD BONDjW1 6 1%2"t 1 MAN <br />ADHESIVE F / <br />TANK MFR <br />FRP <br />P <br />COLLAR <br />WALL <br />TANK INTERSTICE 3" GAL <br />W/BRA <br />— 3" FRP STAGE II <br />LOWEST OCTANE <br />(UNLEADED TANK) <br />SEE T-3 FOR <br />AOD'L VAPOR <br />MANIFOLD DETAILS <br />VENT AND STAGE I <br />PIPING AT <br />CONTAINMENT SUM <br />V. <br />SS <br />NOTE: CONNECT 3" VAPOR RETURN PIPING TO LOWEST <br />KHEAD FITTING3/8" <br />F <br />OCTANE UNLEADED, MANIFOLD TO OTHER TANKS WITH 2" <br />TECHNOLOGIES <br />MAXIMUM <br />MANIFOLD <br />NUMBER <br />HOLE IN <br />+n' <br />SUMP WALL <br />> >/.• <br />3° FRP STAGE II <br />W75i <br />DBL -WALL <br />,. •, <br />i7�s <br />VAPOR RETURN FROM <br />+µ' <br />3" GALV• <br />lei%i' <br />ISLANDS, (TYP OF 2) <br />e' <br />PIPE 7 <br />4XXl <br />3' SUMP PENETRATION <br />2" FRP TO VENT RISER <br />.X19 <br />LILJ•l;z4A <br />4' <br />FITTING (TYP OF 2) / <br />3/4' C. TO SUMP <br />GALV NIPPLE <br />b <br />w > <br />MONITORING <br />VENT <br />UNION <br />PIPING <br />24" x 30"ELIPTICAL <br />CONDUIT W/ TO SUMP <br />_ <br />RONAN LS -3 LIQUID SENSOR <br />; <br />w <br />SEAL OFF 3/4" CONDUIT TO <br />MOUNTED 1" ABOVE TANK IN <br />Z; <br />ACCESS HOLE <br />FRP SUMP <br />w <br />a <br />'� <br />3/4" C. TO TLM SENSERS -+ MANHOLE SUMP J -BOX <br />SECURED TO THE SIDE WALL <br />2 LAYERS OF 1" RIGID <br />2" MAX <br />7 < <br />OF PIPING SUMP, <br />FOAM PADS W/2" DRAIN <br />a <br />MANWAY <br />BALL FLOAT VALVE <br />F <br />SLOTS IN BOTfOM LAYER <br />BOOT W/ STAINLESS WORM <br />INTO TANK <br />�TYPAOF 2)NSIDE) <br />WAY <br />T= <br />4" INTERSTICE <br />BULKHEAD FITTING <br />FLEXIBL7000T EQUAL) <br />FIELD LOCATE <br />ACCESS PLUG <br />OF TA K <br />SUMP PENETRATION . <br />3/4" CONDUIT TO TURBINE CLAMPS (NO AIR STEM). <br />FITTING <br />PRODUCT LINE <br />(TYP OF 2) --v, <br />Z <br />,y <br />SUMP PENETRATION <br />2' FRP PRODUCT PIPE <br />RONAN CONTROLLER <br />FITTING (TYP OF 2) <br />UNION <br />SEATS <br />3/4' CONDUIT TO TURBINE <br />.• <br />3'-0" MIN, SEE - - <br />N <br />NK MFR) PIPING SUMP <br />W <br />W Z <br />3 <br />Z <br />z <br />PENETRATE SUMP WALL ABOVE <br />a <br />SUMP MONITOR RONAN TRANSDUCER <br />1 <br />1 <br />SITE PLAN FOR <br />& <br />N <br />w <br />t�i <br />it <br />RONAN LS -3 <br />-. N <br />a <br />I <br />LL,OUID SENSOR <br />I TANK SIZE <br />1 ABOVE TANK \ <br />VALVES. <br />2" FITTING <br />(TYP OF 2) <br />P'o'o/ <br />1" CONOUIT TO DOUBLE <br />1 <br />1 <br />I <br />PLAN <br />I DOUBLE CONTAINMENT SENSOR <br />— <br />w <br />— <br />✓ -� <br />FIBERGLASS COLLAR i 4` GALV. RISER <br />` <br />DOUBLEWALL FRP TANK 1 CONTAINMENT <br />I F EEADED <br />9 <br />— <br />PRODUCT FLOAT <br />WATER FLOAT <br />/ <br />BOTTOM LOCKING NUT <br />'-- STEEL PLATE AT <br />/ <br />OK TO SWITCH <br />TANK BOTTOM <br />.—_—_--ca—_----csa <br />_ <br />--J <br />POSITIONS <br />PRODUCT MONITORINGPROBE INSTALLED <br />_ <br />BY MANUFACTURES REPRESENTATIVE <br />SLOPE 3" OVER <br />LENGTH OF TANK <br />TANK LEVEL MONITOR <br />7 CONCRETE KNOCK -OUT <br />I <br />10" SCH 40 PVC MONITOR <br />- PORT WITH CONTINUOUS <br />0.02" MACHINED SLOTS <br />$$cc THREADED CONNECTIONS <br />PEA GRAVEL (NO GLUED JOINTS) i <br />BOTTOM OF <br />TANK HOLE <br />EXCAVATION <br />THREADED <br />PVC CAP <br />1% 2" SCORED JOINT <br />!" EXPANSION JOINT <br />DOWELS 0 8" O.C. <br />BORING SLEEVE <br />BULKHEAD <br />FITTING — <br />3' FRP DxM <br />FIELD BONDjW1 6 1%2"t 1 MAN <br />ADHESIVE F / <br />TANK MFR <br />FRP <br />P <br />COLLAR <br />WALL <br />TANK INTERSTICE 3" GAL <br />W/BRA <br />— 3" FRP STAGE II <br />LOWEST OCTANE <br />(UNLEADED TANK) <br />SEE T-3 FOR <br />AOD'L VAPOR <br />MANIFOLD DETAILS <br />VENT AND STAGE I <br />PIPING AT <br />CONTAINMENT SUM <br />V. <br />SS <br />NOTE: CONNECT 3" VAPOR RETURN PIPING TO LOWEST <br />KHEAD FITTING3/8" <br />F <br />OCTANE UNLEADED, MANIFOLD TO OTHER TANKS WITH 2" <br />TECHNOLOGIES <br />MAXIMUM <br />MANIFOLD <br />NUMBER <br />HOLE IN <br />+n' <br />SUMP WALL <br />> >/.• <br />3° FRP STAGE II <br />W75i <br />DBL -WALL <br />i <br />i7�s <br />VAPOR RETURN FROM <br />+µ' <br />3" GALV• <br />lei%i' <br />ISLANDS, (TYP OF 2) <br />e' <br />PIPE 7 <br />4XXl <br />3' SUMP PENETRATION <br />2" FRP TO VENT RISER <br />.X19 <br />LILJ•l;z4A <br />4' <br />FITTING (TYP OF 2) / <br />3/4' C. TO SUMP <br />GALV NIPPLE <br />MONITORING <br />VENT <br />UNION <br />PIPING <br />24" x 30"ELIPTICAL <br />CONDUIT W/ TO SUMP <br />RONAN LS -3 LIQUID SENSOR <br />PENETRATION FITTING (TYP) <br />MOUNTED 1" ABOVE TANK IN <br />3/4" C. TO WIREWAY <br />ACCESS HOLE <br />FRP SUMP <br />AND LID ABOVE / <br />'O <br />SECURED TO THE SIDE WALL <br />2 LAYERS OF 1" RIGID <br />2" MAX <br />m <br />OF PIPING SUMP, <br />FOAM PADS W/2" DRAIN <br />MANWAY <br />BALL FLOAT VALVE <br />SLOTS IN BOTfOM LAYER <br />SUMP RISER <br />000 <br />INTO TANK <br />�TYPAOF 2)NSIDE) <br />WAY <br />J/ <br />''/ <br />4" INTERSTICE <br />BULKHEAD FITTING <br />FLEXIBL7000T EQUAL) <br />FIELD LOCATE <br />ACCESS PLUG <br />OF TA K <br />SUMP PENETRATION . <br />FITTING <br />PRODUCT LINE <br />(TYP OF 2) --v, <br />CONTAINMENT PIPE <br />• <br />SUMP PENETRATION <br />2' FRP PRODUCT PIPE <br />l <br />FITTING (TYP OF 2) <br />UNION <br />SEATS <br />CONDUIT <br />.• <br />NK MFR) PIPING SUMP <br />TURBINE <br />' • <br />CONTAINED PRODUCT LINE MAY <br />TANK COLLAR <br />PENETRATE SUMP WALL ABOVE <br />m <br />., <br />JOINT ANYWHERE WITHIN THIS <br />ARC (APPROX 120 DEGREES) <br />RONAN LS -3 <br />EXTRACTOR TEE <br />"NO <br />LL,OUID SENSOR <br />WITH -BLEED" FLOAT <br />1 ABOVE TANK \ <br />VALVES. <br />2" FITTING <br />(TYP OF 2) <br />P'o'o/ <br />SUMP/MANWAY <br />PLAN <br />PIPING SUMP 1 <br />1" MIN ACCESS BOX <br />CLEAR <br />-LTr -,-i- <br />i <br />2 LAYERS OF 1" RIGID FOAM <br />PADDING <br />TURBIF! ON d l W DRAINAGE 1 <br />2 " <br />SL01S IN B�OTiOM <br />a ar BY 12 RISER I AYI I+• <br />FIELD BONDED JOINT (TYP,) <br />u r ~ JT -H2 LINE PRESSURE <br />SENSOR (IF REQUIRED BY <br />-H z LOCAL JURISDICTION) <br />N < <br />N O _ <br />2" FLEX <br />I CONNECTOR I <br />FRP COLLAR <br />NPT INTERSTICE ACCESS FITTING \ <br />WITH BRASS PLUG, <br />PIPE THRU SUMP <br />LL <br />CONTAINMENT <br />KHEAD FITTING3/8" <br />F <br />SIZE <br />TECHNOLOGIES <br />MAXIMUM <br />EEL CLAMP_ <br />NUMBER <br />HOLE IN <br />+n' <br />SUMP WALL <br />> >/.• <br />-' <br />W75i <br />DBL -WALL <br />i <br />i7�s <br />— <br />+µ' <br />TANK <br />lei%i' <br />4200 <br />e' <br />GALV NIPPLE <br />4XXl <br />e' <br />.X19 <br />-CHECK VALVE <br />4' <br />H00 <br />3/4' C. TO SUMP <br />GALV NIPPLE <br />MONITORING <br />VENT <br />UNION <br />PIPING <br />PENETRATION <br />CONDUIT W/ TO SUMP <br />RONAN LS -3 LIQUID SENSOR <br />PENETRATION FITTING (TYP) <br />MOUNTED 1" ABOVE TANK IN <br />3/4" C. TO WIREWAY <br />LOWEST POINT OF SUMP <br />INSIDE 2"0 PVC PIPE <br />SECURED TO THE SIDE WALL <br />OF PIPING SUMP, <br />BALL FLOAT VALVE <br />V-6" FROM BOTTOM <br />SUMP RISER <br />000 <br />�TYPAOF 2)NSIDE) <br />FRP SUMP WALL <br />BULKHEAD FITTING <br />FLEXIBL7000T EQUAL) <br />FIELD LOCATE <br />EM, <br />W/ AIREM. AFTER TESTINGSLIDE <br />BK TO CLEARFIBERGLASS <br />SECONDTAINMENT. <br />5ECONDARY <br />CONTAINMENT PIPE <br />2' FRP PRODUCT PIPE <br />l <br />7FIELD BOND (W/ADHESIVE FROM <br />NK MFR) PIPING SUMP <br />TANK COLLAR <br />m <br />FRP COLLAR <br />NPT INTERSTICE ACCESS FITTING \ <br />WITH BRASS PLUG, <br />PIPE THRU SUMP <br />LL <br />CONTAINMENT <br />KHEAD FITTING3/8" <br />F <br />SIZE <br />TECHNOLOGIES <br />MAXIMUM <br />EEL CLAMP_ <br />NUMBER <br />HOLE IN <br />+n' <br />SUMP WALL <br />> >/.• <br />FIELD LOCATE <br />W75i <br />AND DRILL, <br />i <br />i7�s <br />PIPE OR CONDUIT <br />+µ' <br />lei%i' <br />4200 <br />e' <br />4XXl <br />e' <br />.X19 <br />e' <br />4' <br />H00 <br />e' <br />VENT <br />AND VAPOR <br />PIPING <br />PENETRATION <br />PIPE <br />CONTAINMENT <br />HOLE <br />SIZE <br />TECHNOLOGIES <br />SIZE <br />NUMBER <br />+n' <br />4060 <br />> >/.• <br />s <br />W75i <br />i <br />i7�s <br />+µ' <br />lei%i' <br />4200 <br />e' <br />4XXl <br />e' <br />.X19 <br />e' <br />4' <br />H00 <br />e' <br />1 4 .. . v .. _ __ .. ._ -_ .. __ ._ (ZISKELI (NL COUPANY. AIL RIGHTS Rr SERWft <br />Li <br />1 <br />F <br />WE <br />
The URL can be used to link to this page
Your browser does not support the video tag.