My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2300 - Underground Storage Tank Program
>
PR0231883
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:52 AM
Creation date
11/5/2018 11:57:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231883
PE
2351
FACILITY_ID
FA0002111
FACILITY_NAME
BEN HOLT SHELL
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
02
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3011\PR0231883\INSTALL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(EX) PRICE SIGN <br />TO REMAIN <br />�ENJAMIIN DRIVE _..._ -- <br />Pacific General, Inc. <br />ENGINEERING/ARCHITECTURAL SERVICES <br />23331 EI Toro Road • Suite 217 <br />Lake Forest, California 92630 <br />TEL: (714) 770-2770 " FAX: (714) 770-1252 <br />SITE PLAN GENERAL NOTES <br />1. INSULATION OF CONDUCTORS IN AND UNDER GASOLINE PUMP AREA <br />SHALL BE LISTED AND APPROVED FOR GASOLINE/OIL RESISTANT TYPE. <br />2. USE EXISTING UNDERGROUND CONDUITS WHERE APPLICABLE AND <br />PERMITTED BY CODES. CONTRACTOR TO VERIFY REQUIREMENTS. <br />3. CONTRACTOR TO VERIFY VOLTAGE OF EXISTING EQUIPMENT TO BE <br />RECONNECTED OR EQUIPMENT FURNISHED BY OTHERS, PRIOR TO <br />HOOK-UP. ANY DISCREPANCY BETWEEN EQUIPMENT AND PLANS <br />BE CALLED TO THE ATTENTION OF THE ENGINEER. <br />4. ALL SITE CONDUCTORS SHALL BE X10 THWN CU., UNLESS NOTED <br />OTHERWISE. <br />5. CONTRACTOR SHALL VERIFY QUANTITY AND SIZE OF ALL CONTROL WIRES. <br />6, COORDINATE EXACT LOCATION FOR RO.S. EQUIPMENT AND PROVIDE <br />ALL REQUIREMENTS FOR NEW DISPENSERS INSTALLED. <br />7. MINIMUM SITE CONDUIT SIZE SHALL BE 3/4" U.O.N.. PROVIDE PULL - <br />WIRE IN ALL CONDUIT ONLY (C.O.) RUNS. USE RGS UNDERGROUND <br />AND AT DISPENSERS. USE RGS WHERE EXPOSED AND SUBJECT TO <br />PHYSICAL ABUSE. USE RGS, EMT, OR FLEXIBLE CONDUIT IN BUILDING <br />USE LIQUIDLIGHT FLEX AT CONNECTION TO MOTORS. <br />SITE PLAN KEYED NOTES <br />1❑ AREA HIGHLIGHTED IS A CLASS 1, DIVISION 2 HAZARDOUS AREA, AND <br />SHALL CONFORM TO NEC ART, 500, 501, 514, AND NFPA 30A. <br />ALL CONDUITS ENTERING OR LEAVING THIS AREA SHALL HAVE <br />SEAL -OFF FITTINGS ON BOTH ENDS OF THE RUN. <br />2❑ PROVIDE AND INSTALL ONE (1) EXPLOSION PROOF JUNCTION BOX <br />WITHIN EACH NEW FUEL DISPENSER FOR DISPENSER POWER, LIGHT, <br />CONTROL, SIGNAL MONITORING, AND CARD READER, CONTRACTOR TO <br />MAKE CONNECTION TO FUEL DISPENSER PUMP AND LIGHTS. VERIFY <br />REQUIREMENTS AND COMPLY. <br />(1) 3/4% (FOR DISPENSER POWER & LIGHT WITH CONDUCTORS AND <br />FOR DISPENSER CONTROL/MONITORING/CARD READER WITH CONTROL <br />WIRES) TO ELECTRICAL GUTTER IN UTILITY AREA. USE EXISTING <br />CONDUITS WHERE APPLICABLE AND PERMITTED BY CODES, ALL <br />WIRES IN THE SAME CONDUIT SHALL BE RATED FOR 600V PER <br />NEC 725-38, 1993. VERIFY REQUIREMENTS, AND COMPLY. <br />®EXISTING MAIN ELECTRICAL PANEL "A" AND SUB -PANEL "B" TO REMAIN. <br />MODIFY CIRCUITS AS SHOWN ON PANEL SCHEDULES, SEE DWG. "E-1 <br />REPLACE EXISTING FUEL TANK AND DISPENSER CONTROL AND MONITORING <br />UNITS WHERE REQUIRED. VERIFY AND COMPLY TO ALL REQUIREMENTS. <br />© PROVIDE AND INSTALL J -BOX FOR TANK TURBINE POWER. <br />aFEEDERS WIRED THROUGH PUMP RELAY STARTER. VERIFY ALL <br />REQUIREMENTS. <br />®PROVIDE AND INSTALL L -BOX FOR TANK SENSOR, MONITOR & LEAK <br />DETECTOR. VERIFY REQUIREMENTS. <br />(1) 3/4"C + CONTROL WIRES TO MAIN FUEL CONTROL PANEL GUTTER. <br />VERIFY REQUIREMENTS, <br />10 PROVIDE WEATHERPROOF J -BOX FOR NEW NR/WATER UNIT AND AREA <br />POLE LIGHT. CONTRACTOR TO MAKE CONNECTION. <br />!0. LDATE _I BY COMMENTS _ <br />1 1 12-28-95 MR REVISION PER SHELL ENGINEER <br />DRAWN BY:M.R. <br />���0� <br />E <br />014840 <br />PLANS <br />PREPARED BY: <br />CHECKED BY: <br />EXP. <br />6-30-99 <br />A & <br />S ENGINEERING <br />R.M.L. <br />PLANNING <br />ENGINEERING CONSTRUCTION MANAGEMENT <br />PROJECT NO. <br />5ASO4 <br />* * <br />J��C �(Z\C�P <br />f OF CA% <br />45 QUAIL <br />PHONE: NUT <br />COURT, SUITE 303 <br />4596 <br />CREEK, CALI8RNIFAX9610-933-0588 <br />FILE NO. <br />5ASO4E2 <br />HOUSTON, TEXAS <br />3011 W. BENJAMIN HOLT DR. & WESTSIDE FRWY. <br />STOCKTON, CALIFORNIA <br />SCALE: 1 "- 10'-0" WIC H 204-7524-4404 <br />DATE: 09-25-95 DRAWING NO. E2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.