N
<br />A
<br />u
<br />General Conditions of the Contract as contained in either A.I.A. Form
<br />A-107 or Shell Oil Company approved Purchase Order Form , whichever
<br />utilized, Addenda to Specifications, Asphalt Paving Specifications,
<br />and Equipment Schedule ore hereby mode a port of these Specifications
<br />to the some extent as if bound herein. The General Conditions,
<br />including Modifications and Special Conditions herein, shall opply, to
<br />both Prime and Sub -Contractors and all tradesmen.
<br />I -I
<br />DRAWING
<br />Owner will furnish free of charge 6 sets of working drawings
<br />and specifications.
<br />1-2 PLANS & SPECIFICATIONS
<br />General Contractor will check all plans and specifications for
<br />compliance with local and state building codes and for errors
<br />and omissions. General Contractor will be responsible for
<br />notifying Owner's Representative of any discrepancies and when
<br />required, adjust bid price accordingly.
<br />I-3 IAYING OUT W -BE
<br />General Contractor will immediately upon entering project site
<br />for purpose of beginning work, locate all general reference
<br />points, properly corners, etc., and lake such action as is
<br />necessary to prevent their destruction lay out his own work
<br />and be responsible for all lines, elevations and measurements
<br />of buildings, groding, paving, utilities and other work
<br />executed by him under the Contract. No footings or foundations
<br />shall be poured prior to field check by Owner's Representative.
<br />Any property carriers destroyed, removed or relocated shall be
<br />replaced by Registered Land Surveyor at Contractor's expense.
<br />General Contractor to meet oil Shell, Slate and Federal Safety
<br />requirements. (Refer to section on Safety
<br />Guidelines/Requirements.)
<br />1-7-4-b. Contractor shall periodically check all machinery and
<br />equipment and insure. it is in good operating condition.
<br />All Contractor's; Fabricator's equipment is subject to
<br />inspection by Company representative, equipment which the
<br />Company representative considers hazardous to personnel or
<br />facilities must be shut down and/or removed from the
<br />premises immediately. Equipment shall be kept at least
<br />(25) foot radius away from any operational gasoline
<br />dispensing area.
<br />1-7-4-c. Contractor's and Fabricator's personnel are directly
<br />responsible for "good housekeeping" awareness and assign
<br />someone daily for removing clutter from the work areas.
<br />Site shall be left in a clean, neat, orderly, and safe
<br />condition upon completion of each work day.
<br />1-7-4-d. Instruct employees in safe lifting practices which may
<br />prevent many injuries.
<br />1-7-4-e. Impress upon the workers the need for constant awareness
<br />Pven during automatically controlled operations of
<br />equipment, etc.
<br />1-7-4-f. Contractor, Fabricator or both shall provide his men with
<br />proper safety equipment such as goggles, ear plugs,
<br />protective clothing, etc., and insure that equipment is
<br />used properly.
<br />1-7-4-g, Hard Hots will be worn while any overhead work is taking
<br />place. (no exceptions)
<br />1-7-4-h. Barricades, flags, steel plotes over trenches, including
<br />proper sloping and shoring of trench walls, provided by
<br />Contractor or Fabricator as necessary to safely secure site
<br />and protect all vehicle and' pedestrian traffic on and
<br />near fob site.
<br />I -7-4-i. Contractor, Fabricator shall protect adjoining properly,
<br />earthwork, trees, etc„ from damage and give proper written
<br />notice of proposed work to adjoining properly owners.
<br />Damage to adjoining properties by Contractor's or
<br />Fabricator's activities sholl be repaired at the
<br />Contractor's or Fabricator's expense.
<br />1-7-4-j. Contractor, Fabricator shall provide all necessary first-
<br />aid, ambulance, and hospital services, in case of injury to
<br />Contractor's, or Fabricator's employees on Shell premises,
<br />1-7-4-k. Shell representative will notify dealer or station manager
<br />(24) hours prior to Contractor, Fabricator commencing any
<br />minor maintenance work. Dealer or station Manager will be
<br />notified a minimum of (3) days prior to Contractor,
<br />Fabricator commencing any major maintenance work.
<br />1-7-4-I. Contractor, Fabricator shall NOT use Shell,s or Dealers
<br />tools.
<br />1-7-4-m. Contractor, Fabricator shall have a 20# ABC fire
<br />extinguisher readly available for any work at project site
<br />which involves use of a sparking device, or open flame,
<br />1-7-4-n. No smoking is allowed with twenty-five feet of area where
<br />product is being dispensed or released or whenever gasoline
<br />vapors are present. Dealer has authority to prohibit
<br />smoking on his facility.
<br />1-7-5 FIRE CONTROL
<br />1-7-5 Incose of fire the following general procedure may be used:
<br />Notice: Contractor, Fabricator should consider the
<br />specific situation before acting.
<br />1-7-5-a. Turn off emergency disconnect switch or main breaker.
<br />1-7-5-b. Evacuate area immediately.
<br />1-7-5-c. Contact Local Fire Department. .
<br />1-7-5-d. Attempt to extinguish only small fires or keep it from
<br />spreading to adjacent areas. If fire is out of control
<br />leave the area to avoid risk of injury. Notice: Use
<br />dry chemical fire extinguisher ABC type to combat small
<br />gasoline fires.
<br />1-7-5-e. Fueling of running equipment is not allowed.
<br />1.6 WELDING
<br />1-7-6-a. WARNING - Contractor, Fabricator are responsible at all
<br />time to keep personnel alert to potential hazards in the
<br />work environment. You are subject to the presence of higly
<br />compbustible materials.
<br />1-7-6-b, Contractor; Fabricator shall be responsible for furnishing
<br />his own equipment and personnel for testing the work area
<br />to insure safe conditions prior to and continously during
<br />any welding work.
<br />1-7-6-c. Contractor; Fabricator shall provide locks to secure all
<br />dispensers when equipment is present on construction site.
<br />1-7-6=d. Contractor; Fabricator shall provide a Standby Fire Watch
<br />person with a 20# ABC fire extinguisher near work area
<br />vicinity during entire welding job,
<br />1-7-6-e. All welding work should be done in Contractor's;
<br />Fabricator's shop or away from gasoline dispensing area if
<br />at all possible.
<br />1-7-7 ELECTRICAL
<br />1-7-7-a. Contractor; Fabricator shall turn off and lock out or
<br />disconnect all electrical power isloaling specific circuit
<br />or circuits at panel before starting any electrical work.
<br />Circuit switch or breaker to be tagged to inform other
<br />pro ect workman or station personnel of work in progress
<br />an � ovoid accidental startup of power.
<br />1-7-7-b. After disabling system and before starting work,
<br />Contractor, or Fabricator shall try to activate equipment
<br />on that circuit to insure correct system has been locked
<br />out.
<br />1-7-7-c. Electric panel shall be re-lobelled to reflect any wiring
<br />changes by Contractor.
<br />1-7-7-d. All electric work shall be in accordance with the latest
<br />National Electric Code.
<br />1-7-7-e. Special Note: Use only "GFI" or (3) prong plug and socket
<br />electrical trouble cords. Cords must be inspected
<br />routinely while on job site to ensure safe working
<br />conditions.
<br />1-7-8 _ GENERAL EQUIPMENT
<br />1-7-8-a. All fire extinguishers used by Contractor shall have an
<br />occurate-annual inspection be lagged and show when inspections
<br />were performed deficiencies found and time corrected.
<br />30(1 W. 13E-NJAMIN H61_1 )RING &. TNT[K5T/\TE 5
<br />(91 . SHELL OIL COMPANY
<br />HOUSTON, TEXAS
<br />GENERAL SPECIFICAITGNS
<br />RETAIL FACILITIES
<br />SHEET # 1
<br />SCALE DKD/APUD
<br />DAtt-- -- vveavtI T
<br />EV,L rr A. alflcoN - DR - 9005
<br />LKCK0 it r-TQYf1f�-- .J
<br />I N D E X
<br />I.
<br />General Conditions & Safety Requirements
<br />I-4
<br />TEMPORARY UTILITIES
<br />II.
<br />Clearing Site
<br />General Contractor will make arrangements for and furnish, at
<br />his own expense, all water, electricity and other utilities
<br />III,
<br />Excavation, Backfilling and Grading
<br />necessary for construction purposes including telephone and „
<br />temporary toilet. General Contractor directly responsible for
<br />IV.
<br />Concrete Work
<br />obtaining all ELECTRICAL & UTILITY PERMITS INCLUDING FINAL
<br />CONNECTIONS.
<br />V.
<br />Masonry Work
<br />1-5
<br />PERMITS
<br />VI.
<br />Structural Steel & Sheet Metal Work
<br />Shell Oil Company will furnish building. permit. General
<br />Contractor will secure and pay for all other permits, fees,
<br />VII.
<br />Carpentry and Millwork
<br />licenses, etc., that may be necessary to complete the project
<br />unless otherwise specified in addenda. Modular building
<br />VIII,
<br />Roof Decking
<br />fabricator to furnish all necessary fabrication, foundation and
<br />IX.
<br />Plumbing & Piping
<br />detail drawings required by local municipalities as well as
<br />provide the required State Product Approval permit for each
<br />modular building including State certification and
<br />X.
<br />Heating, Ventilating and Air Conditioning
<br />documentation.
<br />Mart and C -Store Refrigeration
<br />Mort and C -Store Cooler
<br />1-6
<br />REMOVAL. ET
<br />ETC, OF UTILITIES
<br />Mort and C -Store Fast Food Equipment
<br />XI.
<br />Equipment Installation
<br />General Contractor will arrange for and pay all costs, if any,
<br />ncidentol to the removal or relocation, as shown on the General
<br />Layout, Grade Plan and/or Survey of utility poles, fire hydrants
<br />XII.
<br />Electricol
<br />,street drains or other municipal and/or utility company service
<br />installations, unless otherwise specified in addenda.
<br />XIII.
<br />Connection to Utilities
<br />1-7
<br />JOB I1 ALTH AND SAFETY GUIDELINES
<br />XIV.
<br />Fiberglass Underground Storage Tanks Installation Specifications
<br />Peogrovel Backfill
<br />i-7-1 PURPOSE The purpose of these instructions is to acquaint
<br />XV.
<br />Gasoline Piping Specifications
<br />you with some of the general rules & regulations pertaining to
<br />your work at Shell's Retail Facility. Your compliance with
<br />these regulations is mandatory. Only a Min, requirement and
<br />XVI,
<br />Finish Grading and Landscaping
<br />shall not be construed as complete' or comprehensive. It is the
<br />direct resposibilily of the contractor; Fabricator or both to
<br />XVII.
<br />Paving
<br />9
<br />insure that their employees have a safe work place and are
<br />performing their work safely. including shell's existing
<br />XVIII.
<br />Clean Up and Final Payment
<br />facility personnel, and costomers. If station is operating,
<br />Dealer, and Contractor, must exchange "HAZCON"
<br />XIX.
<br />Pointing
<br />information, perOSHA 1910.1200, ..
<br />1-7-2 CONTRACTOR/FABRICATOR The term "Contractor or Fabricator"
<br />as used in these instructions, shall be understood to include,
<br />the Contractor, Fabricator, their workers and any subcontractors
<br />and their workers performing work under the terms of the
<br />contract under consideration. Contractor, Fabricator is
<br />SCOPE
<br />responsible for' its workers and subcontractors and for directing
<br />and supervising their work.
<br />A. The General will include the furnishing of all labor,
<br />"Company
<br />-contract
<br />materials, equipment and services necessary for the construction of
<br />1-7-3 COMPANY The term Representative" used in these
<br />a complete operating service station facility, including equipment
<br />guidelines shall be any engineer, construction & maintenance
<br />as shown on the construction drowinys and listed on General Layout
<br />representative, or maintenance person designated by Shell Oil
<br />and, hereinafter specified:
<br />Company.
<br />B. The Fabricator will include the furnishing of all labor,
<br />1-7-4 GENERAL
<br />materials, equipment and services necessary for the construction of
<br />customer covers, and modular buildings as shown on the construction
<br />1-7-4—a. Safety grgulations of Shell Oil Company must be followed at
<br />drawings and listed on General Layout and hereinafter specified:
<br />all limes. Company representatives will hove complete
<br />authority to stop work if any violation of the safety
<br />guidelines are recognized.
<br />General Conditions of the Contract as contained in either A.I.A. Form
<br />A-107 or Shell Oil Company approved Purchase Order Form , whichever
<br />utilized, Addenda to Specifications, Asphalt Paving Specifications,
<br />and Equipment Schedule ore hereby mode a port of these Specifications
<br />to the some extent as if bound herein. The General Conditions,
<br />including Modifications and Special Conditions herein, shall opply, to
<br />both Prime and Sub -Contractors and all tradesmen.
<br />I -I
<br />DRAWING
<br />Owner will furnish free of charge 6 sets of working drawings
<br />and specifications.
<br />1-2 PLANS & SPECIFICATIONS
<br />General Contractor will check all plans and specifications for
<br />compliance with local and state building codes and for errors
<br />and omissions. General Contractor will be responsible for
<br />notifying Owner's Representative of any discrepancies and when
<br />required, adjust bid price accordingly.
<br />I-3 IAYING OUT W -BE
<br />General Contractor will immediately upon entering project site
<br />for purpose of beginning work, locate all general reference
<br />points, properly corners, etc., and lake such action as is
<br />necessary to prevent their destruction lay out his own work
<br />and be responsible for all lines, elevations and measurements
<br />of buildings, groding, paving, utilities and other work
<br />executed by him under the Contract. No footings or foundations
<br />shall be poured prior to field check by Owner's Representative.
<br />Any property carriers destroyed, removed or relocated shall be
<br />replaced by Registered Land Surveyor at Contractor's expense.
<br />General Contractor to meet oil Shell, Slate and Federal Safety
<br />requirements. (Refer to section on Safety
<br />Guidelines/Requirements.)
<br />1-7-4-b. Contractor shall periodically check all machinery and
<br />equipment and insure. it is in good operating condition.
<br />All Contractor's; Fabricator's equipment is subject to
<br />inspection by Company representative, equipment which the
<br />Company representative considers hazardous to personnel or
<br />facilities must be shut down and/or removed from the
<br />premises immediately. Equipment shall be kept at least
<br />(25) foot radius away from any operational gasoline
<br />dispensing area.
<br />1-7-4-c. Contractor's and Fabricator's personnel are directly
<br />responsible for "good housekeeping" awareness and assign
<br />someone daily for removing clutter from the work areas.
<br />Site shall be left in a clean, neat, orderly, and safe
<br />condition upon completion of each work day.
<br />1-7-4-d. Instruct employees in safe lifting practices which may
<br />prevent many injuries.
<br />1-7-4-e. Impress upon the workers the need for constant awareness
<br />Pven during automatically controlled operations of
<br />equipment, etc.
<br />1-7-4-f. Contractor, Fabricator or both shall provide his men with
<br />proper safety equipment such as goggles, ear plugs,
<br />protective clothing, etc., and insure that equipment is
<br />used properly.
<br />1-7-4-g, Hard Hots will be worn while any overhead work is taking
<br />place. (no exceptions)
<br />1-7-4-h. Barricades, flags, steel plotes over trenches, including
<br />proper sloping and shoring of trench walls, provided by
<br />Contractor or Fabricator as necessary to safely secure site
<br />and protect all vehicle and' pedestrian traffic on and
<br />near fob site.
<br />I -7-4-i. Contractor, Fabricator shall protect adjoining properly,
<br />earthwork, trees, etc„ from damage and give proper written
<br />notice of proposed work to adjoining properly owners.
<br />Damage to adjoining properties by Contractor's or
<br />Fabricator's activities sholl be repaired at the
<br />Contractor's or Fabricator's expense.
<br />1-7-4-j. Contractor, Fabricator shall provide all necessary first-
<br />aid, ambulance, and hospital services, in case of injury to
<br />Contractor's, or Fabricator's employees on Shell premises,
<br />1-7-4-k. Shell representative will notify dealer or station manager
<br />(24) hours prior to Contractor, Fabricator commencing any
<br />minor maintenance work. Dealer or station Manager will be
<br />notified a minimum of (3) days prior to Contractor,
<br />Fabricator commencing any major maintenance work.
<br />1-7-4-I. Contractor, Fabricator shall NOT use Shell,s or Dealers
<br />tools.
<br />1-7-4-m. Contractor, Fabricator shall have a 20# ABC fire
<br />extinguisher readly available for any work at project site
<br />which involves use of a sparking device, or open flame,
<br />1-7-4-n. No smoking is allowed with twenty-five feet of area where
<br />product is being dispensed or released or whenever gasoline
<br />vapors are present. Dealer has authority to prohibit
<br />smoking on his facility.
<br />1-7-5 FIRE CONTROL
<br />1-7-5 Incose of fire the following general procedure may be used:
<br />Notice: Contractor, Fabricator should consider the
<br />specific situation before acting.
<br />1-7-5-a. Turn off emergency disconnect switch or main breaker.
<br />1-7-5-b. Evacuate area immediately.
<br />1-7-5-c. Contact Local Fire Department. .
<br />1-7-5-d. Attempt to extinguish only small fires or keep it from
<br />spreading to adjacent areas. If fire is out of control
<br />leave the area to avoid risk of injury. Notice: Use
<br />dry chemical fire extinguisher ABC type to combat small
<br />gasoline fires.
<br />1-7-5-e. Fueling of running equipment is not allowed.
<br />1.6 WELDING
<br />1-7-6-a. WARNING - Contractor, Fabricator are responsible at all
<br />time to keep personnel alert to potential hazards in the
<br />work environment. You are subject to the presence of higly
<br />compbustible materials.
<br />1-7-6-b, Contractor; Fabricator shall be responsible for furnishing
<br />his own equipment and personnel for testing the work area
<br />to insure safe conditions prior to and continously during
<br />any welding work.
<br />1-7-6-c. Contractor; Fabricator shall provide locks to secure all
<br />dispensers when equipment is present on construction site.
<br />1-7-6=d. Contractor; Fabricator shall provide a Standby Fire Watch
<br />person with a 20# ABC fire extinguisher near work area
<br />vicinity during entire welding job,
<br />1-7-6-e. All welding work should be done in Contractor's;
<br />Fabricator's shop or away from gasoline dispensing area if
<br />at all possible.
<br />1-7-7 ELECTRICAL
<br />1-7-7-a. Contractor; Fabricator shall turn off and lock out or
<br />disconnect all electrical power isloaling specific circuit
<br />or circuits at panel before starting any electrical work.
<br />Circuit switch or breaker to be tagged to inform other
<br />pro ect workman or station personnel of work in progress
<br />an � ovoid accidental startup of power.
<br />1-7-7-b. After disabling system and before starting work,
<br />Contractor, or Fabricator shall try to activate equipment
<br />on that circuit to insure correct system has been locked
<br />out.
<br />1-7-7-c. Electric panel shall be re-lobelled to reflect any wiring
<br />changes by Contractor.
<br />1-7-7-d. All electric work shall be in accordance with the latest
<br />National Electric Code.
<br />1-7-7-e. Special Note: Use only "GFI" or (3) prong plug and socket
<br />electrical trouble cords. Cords must be inspected
<br />routinely while on job site to ensure safe working
<br />conditions.
<br />1-7-8 _ GENERAL EQUIPMENT
<br />1-7-8-a. All fire extinguishers used by Contractor shall have an
<br />occurate-annual inspection be lagged and show when inspections
<br />were performed deficiencies found and time corrected.
<br />30(1 W. 13E-NJAMIN H61_1 )RING &. TNT[K5T/\TE 5
<br />(91 . SHELL OIL COMPANY
<br />HOUSTON, TEXAS
<br />GENERAL SPECIFICAITGNS
<br />RETAIL FACILITIES
<br />SHEET # 1
<br />SCALE DKD/APUD
<br />DAtt-- -- vveavtI T
<br />EV,L rr A. alflcoN - DR - 9005
<br />LKCK0 it r-TQYf1f�-- .J