VI -2 Fabricator shall insure all scaffolding, ladders, and other
<br />equipment is in proper operating condition. Hard hots will be
<br />worn by all employees and Shell Representatives during steel
<br />X
<br />IIEATIIyG_VENTILATING AND AIR CONDITIONING
<br />erection. The public should not be allowed to enter the work
<br />Plumbing installed in modular buildings with floors will be
<br />area. All power tools shall be inspected prior to work and
<br />IX -2
<br />PLUMBING FIXT R S
<br />(MODULAR BUILDINGS - BY FABRICATOR)
<br />fabricator shall insure all such tools are properly grounded.
<br />-
<br />(CONVERSIONS & STRUCTURES DELIVERED AND ERECTED
<br />Piping for fixtures will be installed in modular buildings
<br />AT PROJECT SITE -GENERAL CONTRACTOR)
<br />VI -3 All Structural Steel will hove one shop coal of red lead point.
<br />Fabricator and be installed complete as shown on drawings with
<br />(Refer to plans and specifications of specific structures for
<br />hot and cold water supply. Fixtures will be suitable for public
<br />NRA
<br />details.)
<br />use as manufactured by American Standard, Kohler Company or
<br />X-1
<br />&
<br />approved equal. All exposed metol, piping in rest rooms will be
<br />nickel Fabricator to provide o shutoff
<br />X -1-a. Unless otherwise noted on "Equipment List", Contractor to
<br />VI -4 All Structural Steel will be pre-engineered, pre -drilled,
<br />Fabricator to
<br />chromium or plated.
<br />supply for each and every fixture. Fabricator to
<br />furnish all labor and material necessary to complete the entire
<br />fabricated prior to being delivered to project site.
<br />valve on water
<br />furnish install fixtures and material as shown per
<br />installation of the heating units, air conditioning units or
<br />erect all structural steel unless otherwise noted.
<br />and plumbing
<br />Shell drawings and specifications.
<br />combined system, except as noted hereafter. Refer to fixture
<br />schedule, for specific system including type and capacity.
<br />VII CARPENTRY AND MILLWORK
<br />IX -3
<br />IT �E BIBBS
<br />X— 1 —b. The system as shown on the drawing will be installed in
<br />VII— 1 GENERA
<br />Install garden hose bibbs where shown on drawings. Where
<br />strict accordance with stole and local ordinances and to the
<br />General Contractor will furnish and erect all framing, concrete
<br />indicated on drawings or called for o Addenda, install 3/4"
<br />requirements of the applicable code of the National Fire
<br />Association, and accepted first class commercial
<br />forms, rough and finish woodwork, as shown on the drawings.
<br />non-feeeze wall hydrants with brass castings and chrome luted
<br />3�4"
<br />Protection
<br />Shell will obtain and pay for oil required permits.
<br />Proper bracing will be installed where necessary and required.
<br />face plates. When indicated in landscaped areas install
<br />housings.
<br />practice.
<br />Equipment will bear the underwriters label when the type of
<br />All wood forms ore to be removed after concrete work has set.
<br />non -freeze post hydrants with brass costings and
<br />equipment is so listed.
<br />GRADING REQUIREMENTS
<br />Burial depth to be below local frost line. Note: oil hose
<br />VII -2
<br />(General Contractor)
<br />bibbs specified for landscaped areas will be furnished and
<br />X -1-c. Wiring to healing system components will be by the licensed
<br />installed by General Contractor.
<br />VII -2-o. Grade and Trademark: Required on each piece of lumber (or
<br />IX -4
<br />FLOOR DRAINS
<br />electrical contractor.
<br />bundled stock). Use only the recognized official marks of the
<br />(Buildings)
<br />X-2
<br />AIR CONDITIONING
<br />Association under whose rules the material is graded. Grade
<br />trademarks will not be required if each shipment is
<br />Floor drains in wash boys will be furnished & installed by
<br />and
<br />accompanied by certificate of inspection issued by the Bureau
<br />General Contractor. These drains will be 24" circular
<br />The foregoing general clauses will apply, as will the pertinent
<br />sections of the above specifications for heating system. The
<br />or the Association responsible for the writing of the grading
<br />or 18" square, light duty, cast iron frame and grating or o
<br />installation will in general conform to the requirements of
<br />rules.
<br />1-1/4" angle frame with 8 anchor rods, all welded and on
<br />18"_x_18"_x_1" subway cover. Fabricator will
<br />NFPA Standard 90A (Latest edition). Contractor will adjust and
<br />VII -2—b. Moisture content requirements:
<br />steel grating
<br />furnish and install cost iron floor drains with 3" caulked
<br />balance system under severe operating conditions and if it is a
<br />heating and cooling system, will post change -over
<br />bottom outlet in modular buildings with floors as shown per -
<br />combined
<br />instructions. Warranty documents and opera tion/mointenonce
<br />1• Framing lumber 2 -inches Maximum 15%
<br />drawings. See Plot Plan for connection of floor to sewer.
<br />be directed away from building
<br />manuals to be delivered to Owner (namely Project Engineer)
<br />and less in thickness
<br />less Maximum 19%
<br />Roof drains must perimeters.
<br />Refer to plot and grade plans for detail.
<br />upon final review and acceptance of installed equipment.
<br />2, Boards 8 -inches or in width
<br />3. Finish lumber and millwork Maximum 15%
<br />PIPING
<br />X-3OC
<br />MPLEJION AND ACCEPTANCE
<br />IX -5
<br />VII -3 GRADES AND SPECIES OF WOOD
<br />Contractor to size water line to provide sufficient service as
<br />Entire heating installation will be completely adjusted and
<br />Grades of lumber and millwork will be as follows:-
<br />required by local codes. General Contractor to determine local
<br />tested after completion and left in a satisfactory operating
<br />and species
<br />For framing lumber, use No. -1 Dense grade Southern Pine, For
<br />water pressure, install pressure regulator valve if required
<br />condition' and owner be given by the contractor, a written
<br />covering all material and workmanship
<br />exterior exposed woodwook, use C and better grade Southern Pine
<br />and determine size of line as indicated in uniform plumbing
<br />install lines
<br />manufactures guarantee
<br />against failure for o period of one year after acceptance.
<br />or Douglas Fir, For interior wood work except beams, use C and
<br />code, where required. General Contractor to air
<br />locations
<br />Refer to bldg. drawings and specifications for further details.
<br />better grade Southern Pine or White Pine.
<br />and cap as shown, and water lines to all shown, and
<br />connect all equipment supplied and installed by Fabricator,
<br />(See plans and fixture schedule).
<br />X-4
<br />rr^"T-STORE CONVERSIONS REFRIGERATION
<br />VII -4 STORAG)`BC� PROTECTION
<br />Stock form lumber and roof plywood to insure proper ventilation
<br />Underground air and water lines from building manifolds to
<br />Refer to building design drawings and specifications for
<br />and drainage. Protect lumber and plywood from the elements.
<br />pump islands and yard outlets will be type L -soft temper copper
<br />details
<br />tubing. All air and water lines from building to remote out
<br />HARDWARE
<br />lets will be type L -soft temper. Insulating joints will be
<br />X-5.
<br />MARTS C -STORES & C -STORE CONVERSIONS COOLERS
<br />VII -5 ROUGH
<br />used where copper and steel are joined. At no time will copper
<br />the two be in contact
<br />Refer to building design drawings and specifications for
<br />Provide and install oil rough hardware and metal fastenings
<br />and galvanized pipe be laid where pipes• will
<br />details.
<br />as shown on drawings, specified herein or required for proper
<br />with each other. All underground lines will have a minimum
<br />installation of carpentry and millwork, Nails, Sikes, screws,
<br />of 18" cover of clean fill, When specified, on anti -freeze
<br />X-6
<br />MARTS C -STORES & C -STORE CONVERSION FAST FOOD EQUIPMENT
<br />bolts, and similar items will be of sizes and types to rigidly
<br />valve shall be installed in water lines next to each pump
<br />secure members in place. See the various headings hereinafter
<br />island, on extension handle and box must be provided. All
<br />to be hard temper. Equipment
<br />Refer to building design drawings, specifications and Convience
<br />specified for specific sizes and type of rough hardware
<br />exposed service room copper pipe
<br />joints will be silver soldered. No
<br />Store Equipment Standards Manual for details.
<br />required,
<br />air and water sweat
<br />horizontal piping to be embedded in concrete slobs. Where vents
<br />are required from floor drains and risers will be placed on
<br />EQUIPMENT INSTALlAT10N
<br />VIII ROOF DECKING
<br />interior of wall chose of restroom or on interior of building
<br />XI
<br />(MODULAR BLDGS. - BY FABRICATOR)
<br />wall, through building ceiling. Fabricator to provide and
<br />(PRE-ENGINEERED BLDGS. - OPTIONAL, REFER TO PROJECT
<br />install vent sleeves or other approved flashing for all vents
<br />XI -1
<br />GENERA
<br />SCOPE OF WORK)
<br />running through roof. All building piping to be made accessible
<br />in
<br />Properly install all equipment as shown on the attached
<br />for on site inspection. No joints allowed copper piping
<br />below concrete floor. Insulated sleeves to be installed at all
<br />"Equipment Schedule in strict accordance with manufacturer's
<br />VIII -1 GENERAL
<br />areas where copper line project through concrete floor. All
<br />details which are considered a port of these specifications.
<br />All Roof Steel Decking, sheathing, insulation and flashing will
<br />waste pipes to be installed by Fabricator unless otherwise
<br />Equipment will be tested and left in a clean and satisfactory
<br />be furnished and installed as shown on drawings and as specified
<br />noted. All vent lines to be installed by Fabricator. See plans
<br />operating condition.
<br />herein by Fabricator, for modular buildings at Fabricators
<br />and piping diagram, Final plumbing hook-up for modular
<br />by General Contractor at site.
<br />The contractor will be responsible for the receipt, storage and
<br />manufacturing facility.
<br />buildings will be done project
<br />All plumbing and building piping for structures constructed at
<br />security of all equipment furnished by Owner from the time o
<br />Roof installation of pre-engineered structures, refer to project
<br />project site is the direct responsibility of General Contractor,
<br />notice of delivery is received or the item is delivered to the
<br />final the unit.
<br />job site until the acceptance of completed
<br />scope of work regarding responsibility for furnishing and
<br />Underground natural gas, fuel oil and waste oil lines shall be
<br />Any charges accrued due to refusal of delivery at the sight
<br />installation of finish roof surface.
<br />schedule #40 black iron cooled and wrapped with a polyethylene
<br />will be the responsibility of the contractor. Since I.C.C.
<br />VIII -2 METAL Fl ASLJINC CUTTERS AND DOWNS QUTS
<br />plastic, "X-TRU-COAT" or approved equal,
<br />regulations require filing of claims within a 15-doy period
<br />after delivery, it will be the contractor's responsibility to
<br />VIII -2-e. All flashings, counter flashings, grovel stops, gutter and
<br />The plastic -cooled steel pipe shipped to the site must be
<br />notify Owner within this period of any damages or shortages
<br />in received. Failure to notify Owner will
<br />downspouts will be furnished and installed as detailed on the
<br />handled and stored so no scuffs, abrasions or tears appear in
<br />in the
<br />noted shipments
<br />require the contractor to satisfy any or all claims.
<br />lfrowings by Fabricator unless otherwise noted per scope of work
<br />the cooling. If any breaks or abrasions appear plastic
<br />of specific project. Refer to project scope of work,
<br />coating, they must be repaired in strict accordance with the
<br />XI -2
<br />TAN
<br />specifications and Shell drawings.
<br />approved manufacturer's specifications.
<br />NI threaded joints shall be mode up with "Permatex No•_2
<br />Underground tanks and piping will be installed and tested
<br />IX PL!JM(]ING AND PIPING
<br />Black" as manufactured by the Permatex Company, Incorporated,
<br />strictly in accordance with details and notes on the Submerged
<br />Sheepheod Day, Long Island, New York, or "Potaloc Red" as
<br />Pump and Underground Storage Tank" drawing, o part of the
<br />IX -1 CFN FE?hl
<br />manufactured by the Paterson and Sargent Company, New York, New
<br />contract drawings. All local ordinances regarding tank instal
<br />A complete system of plumbing and piping will be provided and
<br />York. These joints and fittings are to be field wrapped after
<br />"X-TRU-TAPE "X following
<br />lotions must be observed and it will be the controctor's
<br />responsibility to obtain inspections and final approvals.
<br />installed as shown on the drawings and as hereinafter specified.
<br />testing, using and -TRU-TAPE" primer
<br />0 insure 'a sealed joint.
<br />Refer to Sections XIV & XV for further details and Tank
<br />The General Contractor will do ail necessary trenching and
<br />the instructions to neat, complete
<br />Installation Drawings.
<br />backfilling. Bockfilling will be ctean earth or sand, free from
<br />cinders, large stones or wet clay. Contractor will obtain and
<br />pay for oil permits, inspections, deposits, etc., necessary for
<br />the work. All work will be done in strict accordance with slate
<br />and local codes, regulations, and ordinances. Any additional.
<br />costs resulting from any deviations from the contract drawings
<br />and these specifications due to codes or other requirements
<br />will be borne by Contractor.