Laserfiche WebLink
VI -2 Fabricator shall insure all scaffolding, ladders, and other <br />equipment is in proper operating condition. Hard hots will be <br />worn by all employees and Shell Representatives during steel <br />X <br />IIEATIIyG_VENTILATING AND AIR CONDITIONING <br />erection. The public should not be allowed to enter the work <br />Plumbing installed in modular buildings with floors will be <br />area. All power tools shall be inspected prior to work and <br />IX -2 <br />PLUMBING FIXT R S <br />(MODULAR BUILDINGS - BY FABRICATOR) <br />fabricator shall insure all such tools are properly grounded. <br />- <br />(CONVERSIONS & STRUCTURES DELIVERED AND ERECTED <br />Piping for fixtures will be installed in modular buildings <br />AT PROJECT SITE -GENERAL CONTRACTOR) <br />VI -3 All Structural Steel will hove one shop coal of red lead point. <br />Fabricator and be installed complete as shown on drawings with <br />(Refer to plans and specifications of specific structures for <br />hot and cold water supply. Fixtures will be suitable for public <br />NRA <br />details.) <br />use as manufactured by American Standard, Kohler Company or <br />X-1 <br />& <br />approved equal. All exposed metol, piping in rest rooms will be <br />nickel Fabricator to provide o shutoff <br />X -1-a. Unless otherwise noted on "Equipment List", Contractor to <br />VI -4 All Structural Steel will be pre-engineered, pre -drilled, <br />Fabricator to <br />chromium or plated. <br />supply for each and every fixture. Fabricator to <br />furnish all labor and material necessary to complete the entire <br />fabricated prior to being delivered to project site. <br />valve on water <br />furnish install fixtures and material as shown per <br />installation of the heating units, air conditioning units or <br />erect all structural steel unless otherwise noted. <br />and plumbing <br />Shell drawings and specifications. <br />combined system, except as noted hereafter. Refer to fixture <br />schedule, for specific system including type and capacity. <br />VII CARPENTRY AND MILLWORK <br />IX -3 <br />IT �E BIBBS <br />X— 1 —b. The system as shown on the drawing will be installed in <br />VII— 1 GENERA <br />Install garden hose bibbs where shown on drawings. Where <br />strict accordance with stole and local ordinances and to the <br />General Contractor will furnish and erect all framing, concrete <br />indicated on drawings or called for o Addenda, install 3/4" <br />requirements of the applicable code of the National Fire <br />Association, and accepted first class commercial <br />forms, rough and finish woodwork, as shown on the drawings. <br />non-feeeze wall hydrants with brass castings and chrome luted <br />3�4" <br />Protection <br />Shell will obtain and pay for oil required permits. <br />Proper bracing will be installed where necessary and required. <br />face plates. When indicated in landscaped areas install <br />housings. <br />practice. <br />Equipment will bear the underwriters label when the type of <br />All wood forms ore to be removed after concrete work has set. <br />non -freeze post hydrants with brass costings and <br />equipment is so listed. <br />GRADING REQUIREMENTS <br />Burial depth to be below local frost line. Note: oil hose <br />VII -2 <br />(General Contractor) <br />bibbs specified for landscaped areas will be furnished and <br />X -1-c. Wiring to healing system components will be by the licensed <br />installed by General Contractor. <br />VII -2-o. Grade and Trademark: Required on each piece of lumber (or <br />IX -4 <br />FLOOR DRAINS <br />electrical contractor. <br />bundled stock). Use only the recognized official marks of the <br />(Buildings) <br />X-2 <br />AIR CONDITIONING <br />Association under whose rules the material is graded. Grade <br />trademarks will not be required if each shipment is <br />Floor drains in wash boys will be furnished & installed by <br />and <br />accompanied by certificate of inspection issued by the Bureau <br />General Contractor. These drains will be 24" circular <br />The foregoing general clauses will apply, as will the pertinent <br />sections of the above specifications for heating system. The <br />or the Association responsible for the writing of the grading <br />or 18" square, light duty, cast iron frame and grating or o <br />installation will in general conform to the requirements of <br />rules. <br />1-1/4" angle frame with 8 anchor rods, all welded and on <br />18"_x_18"_x_1" subway cover. Fabricator will <br />NFPA Standard 90A (Latest edition). Contractor will adjust and <br />VII -2—b. Moisture content requirements: <br />steel grating <br />furnish and install cost iron floor drains with 3" caulked <br />balance system under severe operating conditions and if it is a <br />heating and cooling system, will post change -over <br />bottom outlet in modular buildings with floors as shown per - <br />combined <br />instructions. Warranty documents and opera tion/mointenonce <br />1• Framing lumber 2 -inches Maximum 15% <br />drawings. See Plot Plan for connection of floor to sewer. <br />be directed away from building <br />manuals to be delivered to Owner (namely Project Engineer) <br />and less in thickness <br />less Maximum 19% <br />Roof drains must perimeters. <br />Refer to plot and grade plans for detail. <br />upon final review and acceptance of installed equipment. <br />2, Boards 8 -inches or in width <br />3. Finish lumber and millwork Maximum 15% <br />PIPING <br />X-3OC <br />MPLEJION AND ACCEPTANCE <br />IX -5 <br />VII -3 GRADES AND SPECIES OF WOOD <br />Contractor to size water line to provide sufficient service as <br />Entire heating installation will be completely adjusted and <br />Grades of lumber and millwork will be as follows:- <br />required by local codes. General Contractor to determine local <br />tested after completion and left in a satisfactory operating <br />and species <br />For framing lumber, use No. -1 Dense grade Southern Pine, For <br />water pressure, install pressure regulator valve if required <br />condition' and owner be given by the contractor, a written <br />covering all material and workmanship <br />exterior exposed woodwook, use C and better grade Southern Pine <br />and determine size of line as indicated in uniform plumbing <br />install lines <br />manufactures guarantee <br />against failure for o period of one year after acceptance. <br />or Douglas Fir, For interior wood work except beams, use C and <br />code, where required. General Contractor to air <br />locations <br />Refer to bldg. drawings and specifications for further details. <br />better grade Southern Pine or White Pine. <br />and cap as shown, and water lines to all shown, and <br />connect all equipment supplied and installed by Fabricator, <br />(See plans and fixture schedule). <br />X-4 <br />rr^"T-STORE CONVERSIONS REFRIGERATION <br />VII -4 STORAG)`BC� PROTECTION <br />Stock form lumber and roof plywood to insure proper ventilation <br />Underground air and water lines from building manifolds to <br />Refer to building design drawings and specifications for <br />and drainage. Protect lumber and plywood from the elements. <br />pump islands and yard outlets will be type L -soft temper copper <br />details <br />tubing. All air and water lines from building to remote out <br />HARDWARE <br />lets will be type L -soft temper. Insulating joints will be <br />X-5. <br />MARTS C -STORES & C -STORE CONVERSIONS COOLERS <br />VII -5 ROUGH <br />used where copper and steel are joined. At no time will copper <br />the two be in contact <br />Refer to building design drawings and specifications for <br />Provide and install oil rough hardware and metal fastenings <br />and galvanized pipe be laid where pipes• will <br />details. <br />as shown on drawings, specified herein or required for proper <br />with each other. All underground lines will have a minimum <br />installation of carpentry and millwork, Nails, Sikes, screws, <br />of 18" cover of clean fill, When specified, on anti -freeze <br />X-6 <br />MARTS C -STORES & C -STORE CONVERSION FAST FOOD EQUIPMENT <br />bolts, and similar items will be of sizes and types to rigidly <br />valve shall be installed in water lines next to each pump <br />secure members in place. See the various headings hereinafter <br />island, on extension handle and box must be provided. All <br />to be hard temper. Equipment <br />Refer to building design drawings, specifications and Convience <br />specified for specific sizes and type of rough hardware <br />exposed service room copper pipe <br />joints will be silver soldered. No <br />Store Equipment Standards Manual for details. <br />required, <br />air and water sweat <br />horizontal piping to be embedded in concrete slobs. Where vents <br />are required from floor drains and risers will be placed on <br />EQUIPMENT INSTALlAT10N <br />VIII ROOF DECKING <br />interior of wall chose of restroom or on interior of building <br />XI <br />(MODULAR BLDGS. - BY FABRICATOR) <br />wall, through building ceiling. Fabricator to provide and <br />(PRE-ENGINEERED BLDGS. - OPTIONAL, REFER TO PROJECT <br />install vent sleeves or other approved flashing for all vents <br />XI -1 <br />GENERA <br />SCOPE OF WORK) <br />running through roof. All building piping to be made accessible <br />in <br />Properly install all equipment as shown on the attached <br />for on site inspection. No joints allowed copper piping <br />below concrete floor. Insulated sleeves to be installed at all <br />"Equipment Schedule in strict accordance with manufacturer's <br />VIII -1 GENERAL <br />areas where copper line project through concrete floor. All <br />details which are considered a port of these specifications. <br />All Roof Steel Decking, sheathing, insulation and flashing will <br />waste pipes to be installed by Fabricator unless otherwise <br />Equipment will be tested and left in a clean and satisfactory <br />be furnished and installed as shown on drawings and as specified <br />noted. All vent lines to be installed by Fabricator. See plans <br />operating condition. <br />herein by Fabricator, for modular buildings at Fabricators <br />and piping diagram, Final plumbing hook-up for modular <br />by General Contractor at site. <br />The contractor will be responsible for the receipt, storage and <br />manufacturing facility. <br />buildings will be done project <br />All plumbing and building piping for structures constructed at <br />security of all equipment furnished by Owner from the time o <br />Roof installation of pre-engineered structures, refer to project <br />project site is the direct responsibility of General Contractor, <br />notice of delivery is received or the item is delivered to the <br />final the unit. <br />job site until the acceptance of completed <br />scope of work regarding responsibility for furnishing and <br />Underground natural gas, fuel oil and waste oil lines shall be <br />Any charges accrued due to refusal of delivery at the sight <br />installation of finish roof surface. <br />schedule #40 black iron cooled and wrapped with a polyethylene <br />will be the responsibility of the contractor. Since I.C.C. <br />VIII -2 METAL Fl ASLJINC CUTTERS AND DOWNS QUTS <br />plastic, "X-TRU-COAT" or approved equal, <br />regulations require filing of claims within a 15-doy period <br />after delivery, it will be the contractor's responsibility to <br />VIII -2-e. All flashings, counter flashings, grovel stops, gutter and <br />The plastic -cooled steel pipe shipped to the site must be <br />notify Owner within this period of any damages or shortages <br />in received. Failure to notify Owner will <br />downspouts will be furnished and installed as detailed on the <br />handled and stored so no scuffs, abrasions or tears appear in <br />in the <br />noted shipments <br />require the contractor to satisfy any or all claims. <br />lfrowings by Fabricator unless otherwise noted per scope of work <br />the cooling. If any breaks or abrasions appear plastic <br />of specific project. Refer to project scope of work, <br />coating, they must be repaired in strict accordance with the <br />XI -2 <br />TAN <br />specifications and Shell drawings. <br />approved manufacturer's specifications. <br />NI threaded joints shall be mode up with "Permatex No•_2 <br />Underground tanks and piping will be installed and tested <br />IX PL!JM(]ING AND PIPING <br />Black" as manufactured by the Permatex Company, Incorporated, <br />strictly in accordance with details and notes on the Submerged <br />Sheepheod Day, Long Island, New York, or "Potaloc Red" as <br />Pump and Underground Storage Tank" drawing, o part of the <br />IX -1 CFN FE?hl <br />manufactured by the Paterson and Sargent Company, New York, New <br />contract drawings. All local ordinances regarding tank instal <br />A complete system of plumbing and piping will be provided and <br />York. These joints and fittings are to be field wrapped after <br />"X-TRU-TAPE "X following <br />lotions must be observed and it will be the controctor's <br />responsibility to obtain inspections and final approvals. <br />installed as shown on the drawings and as hereinafter specified. <br />testing, using and -TRU-TAPE" primer <br />0 insure 'a sealed joint. <br />Refer to Sections XIV & XV for further details and Tank <br />The General Contractor will do ail necessary trenching and <br />the instructions to neat, complete <br />Installation Drawings. <br />backfilling. Bockfilling will be ctean earth or sand, free from <br />cinders, large stones or wet clay. Contractor will obtain and <br />pay for oil permits, inspections, deposits, etc., necessary for <br />the work. All work will be done in strict accordance with slate <br />and local codes, regulations, and ordinances. Any additional. <br />costs resulting from any deviations from the contract drawings <br />and these specifications due to codes or other requirements <br />will be borne by Contractor. <br />3011 W.13ENSAMIN 4i0LT DRIVti �< INTEr6TATE 5 <br />5TOGWFON, CALIFORNIA <br />