Laserfiche WebLink
CLIENT: <br /> Procedures for Post Construction Testing Requirement moo <br /> PAGE 2; NOTE: Water used to perform testing of STP sumps, dispenser sumps and/or spill ELEVEn <br /> �`et+fri buckets, after fuel is introduce/delivered into the UST system CANNOT be discharged <br /> on site. �� <br /> 7-Eleven, Inc <br /> Water that is or was in contact with fuel must be properly discharged in <br /> Tanknology may use one of the following test methods: Hydrostatic, pressure or accordance with applicable Federal, State and/or Local regulations. INFORMATION PROVIDED BY: <br /> Procedures for Post Construction Testing Requirement vacuum. <br /> Contractor Preparation for Post-Fuel (after delivery) Testing iedlepgTOUp <br /> Water used to perform these Pre-Fuel tests may be discharged on site as long as the <br /> water was not in contact with any fuel. o The Fuel level must be between 70 — 80 percent of tank capacity SCOPE OF WORK p p Y aArchitecture <br /> Contractor Preparation for Pre-Fuel (before delivery) Testing o Compartmentalized tanks must have fuel levels within 10" of each other. .Engineering <br /> Third party tests are required to be performed on any post construction activitiesPlanning <br /> associated with new installation, upgrade, replacement or repair of or to the o The tanks, piping and dispensers must be accessible to include asphalt and In Stage II vapor recovery areas the following conditions must apply. MProject Management <br /> Underground Storage Tank (UST) systems, if the work involves product piping, tank concrete that can be driven upon. 2322 West Third Street <br /> sumps, dispenser sumps and pans or spill containment buckets. o 110 volt ac current must be available o All product piping must be thoroughly purged of air and vapors. LOs Angeles,C1 <br /> o All productpiping, tank sum spill bucket and dispenser sum /liner work must o The dispensers must be set and operational to include all vapor vacuum pumps 90057 1906 <br /> p p, P p p Phone:(213) 381-7891 <br /> Tanknology, Inc is current) under contact to perform all required tests as the national and other stage 11 equipment fully functional. <br /> Y p q be completed and components accessible. rax: (213) 381-15173rd party testing contractor and must be used to perform post construction testing to o Test valves must be installed for the secondary product piping. o All hanging hardware must be installed and operational <br /> ensure that 7-Eleven maintains continuity with the company's regulatory compliance o Dispensers do not need to be in place and product piping does not need to be o The tanks, piping and dispensers must be accessible to include asphalt and fiedlergroup.com <br /> testing program. The only EXCEPTION applies if local regulations require that the purged. concrete that can be driven upon. CONSULTANT: <br /> installation contractor perform the required tests and the tests are witnessed on site by o As an OPTION TO SIGNIFICANTLY REDUCE TIME ON SITE, the contractor o 110 volt ac current must be available <br /> a regulatory entity, in these cases the installation contractor must submit documentation should flood all tank sumps and dispenser sumps with clean water the night o Test valves must be installed for the secondary product piping. <br /> of the regulatory witnessed tests, as well as the result of any such test, directly to 7- before the scheduled testing. Water must be added to a minimum of 3 inches <br /> Eleven, Inc, Compliance Department. above the highest penetration or seam in the sump or pan. CONTRACTOR NOTIFICATION TO TESTING COMPANY (TANKNOLOGY) <br /> o The contractor should allow several hours to allow the water level to stabilize and <br /> It will not be necessary for Tanknology to retest a component which was tested mark the level of the water with a permanent marker. It is recommended that the contractor provide notification to Tanknology of the need to <br /> by the contractor, if that test was witnessed by a regulator. In these cases the perform tests at lease 14 days prior to the anticipated test date. However, to ensure <br /> contractor must submit results of the test as well as copies of regulator Post Fuel Test - Test performed AFTER fuel is introduced or delivered into the UST tests are conducted in a timely manner a minimum of five (5) days is required. <br /> inspection report within 48 hours of completion of the test to the address listed system. Tanknology understands that the actual date may change, by providing them with as <br /> below much time as possible allows them to maintain a time slot in their schedule to shift as <br /> POST-FUEL TEST ESTIMATED TEST DURATION necessary. The contractor must keep Tanknology apprised of the anticipated date and <br /> The required tests are divided into two categories, Pre-Fuel test and Post Fuel test. Tank Interstice Minimum 1 hour per tank time that the testing will be needed as projected dates change. <br /> The tests performed during each phase are listed below. Tank Primary (Tightness) Minimum 2 '/z hour <br /> Line/Pipe Interstice Minimum 1 hour per line/pipe Request to schedule tests shall be made to: <br /> Pre-Fuel Test - Test performed BEFORE fuel is introduced or delivered into the UST Line Primary (Tightness) completed during tank test NO. DATE REVISION DESCRIPTION <br /> system. Line Leak Detector completed during tank test Chris McDermand Dh01-09 REV. PER CLIENT <br /> Stage II (where applicable) Minimum 3 hours 800-964-0010, extension 115 <br /> The following tests are recommended to be performed before fuel is introduced into the 'Automatic Tank Gauge (ATG) Certification Minimum 2 hours Email address: cmcdermand(o)tanknoloov.com <br /> UST system: Other (as required by State or Local ordinance) Unknown — <br /> PRE-FUEL TEST ESTIMATED TEST DURATION 'Does not include new ATG installation. Certification of new ATG is the responsibility of <br /> STP Sumps Minimum 4 hours the installing contractor. <br /> Dispenser Sumps/Containment Minimum 4 hours <br /> Spill Containment Buckets Minimum 1 hour <br /> SEAL: <br /> In <br /> ti.`hQ�G� SS <br /> OF/Kn�' <br /> No. C-3812J <br /> Exp. 3-31-2011 <br /> civl\- ,,yp <br /> �rpOF <br /> CONFIDENTIALITY STATEMENT: <br /> PT" OWUP S CUPKT W a'. NflI.,gPXG M <br /> GDXI, .r 1.ME PRNPIE USE DF MIMOR2E0 <br /> 1.0PNEL NO 1M "EPEC 1 .L R COPfta. <br /> W%1GiCq WIoN P. q$CLOffO oa MME AVMA9E t0 <br /> DMFPS OF USCG0`ao WW.3MKR E%.IS <br /> E%PXFSSLY MI"ox', Y D IN WPo-BY FIGP G .o00PTI FIX. Dfl COoHxA.`Pre.TN6 WLV.., <br /> IeNoa io La FW E 4mo,,RPTK .Eo To IwL <br /> DEVELOPMENT INFORMATION: <br /> 7-ELEVEN, INC. <br /> NEW 4 M.P.D. CANOPY <br /> NEW U.G. STORAGE TANKS <br /> & RESTROOM ADDITION <br /> SITE ADDRESS: <br /> z <br /> 3040 BENJAMIN HOLT DR. <br /> STOCKTON, CA 95219 <br /> a3 <br /> s STORE #14113 <br /> S <br /> d <br /> DESIGNED DY: NTP FG PM: KE <br /> CHECKED OY: KE MEP PM: <br /> u <br /> DRAWN EY: DO CONSULTANT PM: <br /> DATE: PROJECT N0: <br /> E 04.01.09 12728 <br /> n <br /> x DRAWING TITLE: <br /> POST CONSTRUCTION <br /> E <br /> a TESTING PROCEDURES <br /> 0 <br /> 2 SHE T NO: <br /> z <br /> es <br /> Gm <br /> E' <br />