<br /> 1.1 SCOPE OF WORK: THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECT CONSISTS OF THE
<br /> FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES REQUIRED IN 4,7 INSPECTIONS: CONTRACTOR SHALL BE REQUIRED TO ADHERE TO ALL REQUIREMENTS OF OWNER'S 8.1 THE FOLLOWING CODES ARE MADE A PART OF THIS SPECIFICATION. SAID CODES SHALL DICTATE
<br /> CONJUNCTION WITH OR PROPERLY INCIDENTAL TO THE COMPLETE CONSTRUCTION OF A GASOLINE INSPECTION PROGRAM. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR NOTIFICATION, SITE MINIMAL ACCEPTABLE STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL GOVERNING � �y
<br /> INSTALLATION FOR 7-ELEVEN, INC. PREPARATION REQUIREMENTS, COMPLIANCE, ON-SITE PRESENCE DURING INSPECTION AND CORRECTION AUTHORITIES DICTATE HIGHER OR MORE STRINGENT REQUIREMENTS WHICH SHALL TAKE PRECEDENCE: 11�6I .ergr011p
<br /> L OF ANY DEFECTS OR RELATED PROBLEMS AS DIRECTED BY INSPECTING REPRESENTATIVE CONTRACTOR
<br /> PART 2 - AGREEMENT SHALL PROVIDE NO LESS THAN 48 HOURS NOTICE PRIOR TO INSPECTION. BA.1 NFPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE
<br /> 4.6 COORDINATION: GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING ALL PHASES OF THE *Architecture
<br /> 2.1 CONTRACTOR SHALL USE 7-ELEVEN "CONSTRUCTION AGREEMENT" AND "GENERAL CONDITIONS" # GASOLINE INSTALLATION WITH THE GENERAL CONTRACTOR IN CHARGE OF THE BUILDING OR MAJOR 8.1.2 PEI MANUAL "RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND *Engineering
<br /> 4400157, DATED 8/03 AND RELATED INSURANCE SPECIFICATION. A COPY IS AVAILABLE BY CONTACTING PORTION OF THE PROJECT. THE BUILDING GENERAL CONTRACTOR AND THE GASOLINE CONTRACTOR LIQUID STORAGE SYSTEMS." #RP-100-96 (OR LATEST EDITION) *Planning
<br /> THE LOCAL 7-ELEVEN DIVISION CONSTRUCTION MANAGER. SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE SCHEDULE AND TIMETABLE FOR COMPLETION ON *Prot Management
<br /> THE GASOLINE INSTALLATION. TIMETABLE FOR BUILDING AND GASOLINE SHALL COINCIDE AND B.1.3 OSHA AND LOCAL MUNICIPALITIES Iecana g
<br /> 2.2 PAGE 3 -- ARTICLE II - OWNER: WHENEVER THE WORD "OWNER" APPEARS IN THE CONTRACT COMPLIMENT EACH OTHER SO THAT ONE DOES NOT DELAY THE OTHER. 2322 Westthird Street
<br /> DOCUMENTS, DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO READ: "7-ELEVEN, INC." t.os Angeles,CA
<br /> SHOULD GASOLINE CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE SCHEDULE PART 9 - WARRANTY / GUARANTEE 90057-1906
<br /> 2.3 PAGE 3 -- ARTICLE III - CONTRACTOR: WHENEVER THE WORD "CONTRACTOR" APPEARS IN THE AND/OR HOLD UP THE COMPLETION OF THE OVERALL BUILDING PROJECT, 7-ELEVEN, INC. RESERVES Phone: (213) 381-7891
<br /> CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO READ "GENERAL THE RIGHT TO RECTIFY THE SITUATION ACCORDINGLY. 9.1 EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED IN EXCESS OF ONE (1) YEAR, THE CONTRACTOR Fax: (213)381-1517
<br /> GASOLINE INSTALLATION CONTRACTOR." AGREES TO REPAIR AND RECERTIFY OR REPLACE THE DEFECTIVE COMPONENT OR ANY DEFECT IN
<br /> 4.9 CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING: MATERIAL OR WORKMANSHIP (BEYOND ORDINARY WEAR AND TEAR) TO THE SATISFACTION OF THE fiedlergronp.com
<br /> �-r
<br /> OWNER'S CONSTRUCTION MANAGER FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE,
<br /> PART 3 - INTENT OF DRAWING AND SPECIFICATIONS 4.9.1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES AS APPLICABLE FOR WHETHER IN HIS WORK OR IN THAT OF SUBCONTRACTOR'S, WITHOUT COST TO THE OWNER. CONSULTANT:
<br /> CONTRACTOR CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE STORAGE TANK
<br /> 3A THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE A COMPLETE WORK OR SYSTEM, 9.2 ALL PAVING WILL HAVE A TWO YEAR WARRANTY.
<br /> IMPROVEMENT WHICH THE CONTRACTOR UNDERTAKES TO DO IN FULL COMPLIANCE WITH THE CONTRACT
<br /> DOCUMENTS. THE CONTRACTOR SHALL DO ALL WORK AS MAY BE NECESSARY TO COMPLETE THE WORK 4.9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS, PRODUCT
<br /> INA SATISFACTORY AND ACCEPTABLE MANNER. ATTENDING OF EQUIPMENT.
<br /> ACHIEVING CERTIFICATION FROM APPROPRIATE
<br /> COMPANY FOR INSTALLATIONPART 10 - AS BUILT PLAN AND DOCUMENTATION
<br /> 3.2 THE CONTRACTOR SHALL, UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE DRAWINGS AND
<br /> SPECIFICATIONS TO THE OWNER'S CONSTRUCTION MANAGER. 4.9.3 CERTIFICATION ON APPROPRIATE FORMAT AS TO INSTALLATION OF COMPLETE
<br /> SYSTEM BEING PERFORMED IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS AND 10.1 UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE "AS-BUILT SITE PLAN" VERIFYING FINAL
<br /> 3.3 THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. ANYTHING MENTIONED IN REGULATIONS. LOCATION OF IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, PIPING, PLUMBING AND ELECTRICAL.
<br /> THE SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, OR SHOWN ON THE DRAWINGS AND NOT 10.2 CONTRACTOR SHALL KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETE INSTALLATION.
<br /> MENTIONED IN THE SPECIFICATIONS, SHALL BE OF LIKE EFFECT AS IF SHOWN OR MENTIONED IN BOTH. 4.9.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR PHOTOGRAPHS ARE TO BE PROPERLY DATED, IDENTIFIED AND FORWARDED TO LOCAL 7-ELEVEN, INC.
<br /> GENERALLY, THE SPECIFICATIONS DESCRIBE WORK WHICH CANNOT BE READILY IDENTIFIED ON THE HAS BEEN INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL TRAINED CONSTRUCTION OFFICE, WITH FINAL INVOICE PACKAGE.
<br /> DRAWINGS AND INDICATED TYPES, QUALITIES AND METHODS OF INSTALLATION OF THE VARIOUS AND QUALIFIED FOR THAT SPECIFIC ITEM.
<br /> MATERIALS AND EQUIPMENT REQUIRED FOR THE WORK. IT IS NOT INTENDED TO MENTION EVERY ITEM
<br /> OF WORK IN THE SPECIFICATIONS WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR TO 4.10 PAYMENT SHALL BE MADE PER ARTICLE 1113.2 OF THE CONTRACT.
<br /> SHOW ON THE DRAWINGS ALL ITEMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN
<br /> IF THEY ARE OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THEREON. ALL MATERIALS OR 4.1.1 LIENS: CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR AGAINST THE
<br /> LABOR FOR WORK WHICH IS SHOWN ON THE DRAWINGS OR IS REASONABLY INFERABLE AS BEING PROPERTY BY ITS LABORERS, MECHANICS OR MATERIAL MEN, AND SHALL INDEMNIFY, PROTECT AND NO. DATE REVISION DESCRIPTION
<br /> NECESSARY TO PRODUCE A FINISHED JOB SHALL BE PROVIDED BY THE CONTRACTOR WHETHER OR NOT SAVE OWNER HARMLESS FROM AND AGAINST ALL SUCH CLAIMS AND LIENS.
<br /> THE WORK IS EXPRESSLY COVERED IN THE SPECIFICATIONS. 7 7 04-91-09 Rev. MR CUE"
<br /> 4.12 EQUIPMENT RESPONSIBILITY: CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, RECEIVING, SECTION II INSPECTIONS TESTING
<br /> 3.4 THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND ASCERTAIN UNLOADING, HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL OWNER SUPPLIED
<br /> EXISTING CONDITIONS PRIOR TO THE START OF THEIR PORTIONS OF THE WORK. BEFORE ORDERING EQUIPMENT AND MATERIAL. CONTRACTOR SHALL INSPECT EQUIPMENT UPON RECEIPT AND IMMEDIATELY
<br /> MATERIALS OR DOING ANY WORK, THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR THE REPORT ANY DAMAGE DUE TO SHIPPING TO THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL BE
<br /> CORRECTNESS OF ALL MEASUREMENTS AT THE SITE. ANY DIFFERENCES WHICH MAY BE FOUND RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE TO COMPLY WITH THESE REQUIREMENTS.
<br /> BETWEEN ACTUAL VER FOR
<br /> SHALL BE SUBMITTED DIMENSIONS
<br /> DIMENSIONS INDICATED
<br /> DRAWINGS
<br /> TOTTHE OWN R'SCON TRUCTIONMANAGER FORCONSIDERAT OH PROTECTED
<br /> SHIPPING WITH BOXES UNTIL TURNED O
<br /> BEFORE
<br /> OPENING. CONTRACTOR SHALLBESOLE YRESPO SIBLEFORADEQUATE ANDLOCKEDST RAGE OF PART I - GENERAL
<br /> PROCEEDING WITH THE ACTUAL DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS OWNER'S MISCELLANEOUS EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE
<br /> A SUBSTANTIAL ERROR HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT SHALL BE BROUGHT STORE. 1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, SERVICES AND EQUIPMENT AS
<br /> TO THE ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER AND RESOLVED BEFORE PROCEEDING REQUIRED TO PROVIDE INSPECTION SERVICES OF THE GAS INSTALLATION.
<br /> WITH WORK. 4.13 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND MISCELLANEOUS
<br /> CONFIRMATION OF EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY LOCAL CONSTRUCTION OFFICE. T�
<br /> 3.5 THE ORGANIZATION OF SPECIFICATIONS INTO DIVISIONS, SECTIONS AND PARAGRAPHS, AND THE PART 2 - INSPECTIONS am' PIONS
<br /> ARRANGEMENT OF THE DRAWINGS ARE NOT INTENDED TO CONTROL THE CONTRACTOR IN DIVIDING THE 4.14 GASOLINE CONTRACTOR SHALL PROVIDE ALL PLUMBING, WIRING, MATERIAL AND LABOR AS REQUIRED
<br /> WORK AMONG SUBCONTRACTORS OR IN THE ESTABLISHING THE EXTENT OF WORK TO HE PERFORMED TO INSTALL OWNER SUPPLIED EQUIPMENT. INCLUDE MONEYS IN BID PROPOSAL FOR INSTALLATION OF 2.1 INSPECTOR: 7-ELEVEN, INC. LOCAL CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE
<br /> BY ANY TRADE. OWNER SUPPLIED EQUIPMENT UNLESS NOTED OTHERWISE. SHOULD BE NOTIFIED TO OBSERVE TIGHTNESS TESTING OF PRODUCT PIPING, STAGE I & STAGE II
<br /> PIPING PRIOR TO BACKFILL.
<br /> 3.6 DRAWINGS AND SPECIFICATIONS: DRAWINGS INDICATE GENERAL DESIGN AND ARRANGEMENTS DRAWINGS PART 5 - P R 0 TE C T I 0 NSEAL
<br /> ARE DIAGRAMMATIC AND ARE NOT SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM 2.2 NOTIFICATION: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING 7-ELEVEN'S CONSTRUCTION
<br /> ARCHITECTURAL PLANS AND EQUIPMENT TO BE FURNISHED. VERIFY DIMENSIONS IN THE FIELD. 5.1 CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY HIM OR HIS DEPARTMENT 48 HOURS PRIOR TO REQUESTED INSPECTIONpaDTESSIDN
<br /> WORKMEN TO THE PROPERTY OR EQUIPMENT OF THE OWNER, OR TO THE WORK OR MATERIALS OF e`�° 0. F'07e,A
<br /> OTHER CONTRACTORS. CONTRACTOR SHALL MAKE GOOD ANY LOSS, DAMAGE OR INJURY WITHOUT COST 2.3 SPILLAGE: SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR TESTING,LOCAL
<br /> TO BE
<br /> PART 4 - RESPONSIBILITY OF THE CONTRACTOR TO OWNER FOR SUCH LOSS OR DAMAGE. IMMEDIATELY,VEN ESTIMATED LOSS OF PRODUCT AS WELL AS ACTION TO BECONSTRUCTION DEPARTMENT AND ENVIRONMENTALTAKEN BYRCONTRACTOR TTOIED � a N°. 0-38123 zA
<br /> 4.1 CONTRACTOR HEREBY DECLARES HE HAS READ ALL SPECIFICATIONS AND EXAMINED THE DRAWINGS AND 5.2 CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES, LIGHTS, SIGNS SAFEGUARD THE EVENT FROM FURTHER MISHAP AND TO PROTECT THE GENERAL PUBLIC IS TO BE Exp. 3-31-2011
<br /> OR OTHER STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT OBSTRUCT OR INTERFERE WITH NOTED AND RECORDED. 'F
<br /> THAT HE UNDERSTANDS ALL CONDITIONS. TRAFFIC IN PUBLIC STREETS, ALLEYWAYS OR PRIVATE RIGHT-OF-WAYS. IF WORK IS SUSPENDED, KEEP CIV)
<br /> 4.2 CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FAMILIAR WITH THE CONDITIONS ALL ROADWAYS AND SIDEWALKS IN PROPER CONDITION AND PUT AND LEAVE THEM IN PROPER 2.4 REPRESENTATIVE OF CONTRACTOR AND PIPING SUBCONTRACTOR SHALL BE AVAILABLE ON SITE DURING OF stat
<br /> AFFECTING THE WORK, NO ALLOWANCES SHALL BE MADE SUBSEQUENTLY ON BEHALF OF THE CONDITION AT TERMINATION OF WORK. TESTING PROGRAMS. FAILURE TO COMPLY WITH THIS REQUIREMENT WILL RESULT IN ANY CORRECTIONS
<br /> CONTRACTOR FOR ANY ERROR NEGLIGENCE ON HIS PART. IF IN THE PERFORMANCE OF THE CONTRACT, AND/OR REPAIRS REQUIRED BEING PERFORMED BY OWNER AS REQUIRED. COST OF SAID REPAIRS
<br /> LATENT CONDITIONS AT THE SITE ARE FOUND TO BE MATERIALLY DIFFERENT FROM THOSE INDICATED 5.3 CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM ALL AND/OR CONNECTIONS SHALL BE DEDUCTED FROM CONTRACT AMOUNT AS REQUIRED TO SATISFY THE
<br /> TEMEN
<br /> BY THE DRAWINGS AND SPECIFICATIONS, OR UNKNOWN CONDITIONS UNUSUALLY INHERENT IN WORK OF WORK REQUIRED FOR THE CARE, PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES ON AND SITUATION. CVINPmFND. SraKca..:
<br /> 'PHIS CHARACTER SHOWN AND SPECIFIED, THE ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER AROUND THE BUILDING SITE, ASSUMING ALL RESPONSIBILITY AND PAYING ALL COSTS FOR WHICH THE EaLea M`,. n'". UE„„"D;„„s„ro"„r'"°'°
<br /> SHALL BE GALLED IMMEDIATELY TO SUCH CONDITIONS BEFORE THEY ARE DISTURBED. OWNER MAY HE LIABLE. CONTRACTOR HEREBY DECLARES HE HAS VERIFIED THE LOCATIONS OF THE 2,5 PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE WORK SUCH THAT NO HEAVY EQUIPMENT IS PCOrn"MNEL`. n01A MKi sys`N.,oc,plm
<br /> EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START OF WORK. CONTR. HEREBY AGREES °Art s'o', o"..°SC,`a°iw so. �10
<br /> OPERATING ON SITE DURING INSPECTION PROGRAMS. NO WELDING OR OPEN FLAMES SHALL HE aPseaew ww°mN.1" Kaam ex,rc°ae°R°UP. rrr
<br /> 4.3 CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE SOILS TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES IN CON- JUNCTION WITH THE RELOCATION'S ALLOWED ON SITE AT ANY TIME DURING TEST PROCEDURES. "M1A. w G°PP@PSpX uCr G W mcwar,
<br /> OF EXISTING UTILITIES AS REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL Howes. ex mrue 9arw BE or,z,eo ro MWREPORT. Pmee°*°.m1 e Pwx „amc,vea„e
<br /> UTILITY EASEMENTS, HOOKUP CHARGES, TAP FEES & SYSTEM DEVELOPMENT FEES OR BONDS AS 2.6 INSTALLATION REPORTS: SHOULD 7-ELEVEN OR THEIR APPOINTED REPRESENTATIVES BE UNABLE TO DEVELOPMENT INFORMATION;
<br /> CONTRACTOR SHALL BE RESPONSIBLE FOR STRICTLY ADHERING TO THE RECOMMENDATIONS OF SAID NECESSARY FOR COMPLETION OF THIS PROJECT. BE PRESENT AT SITE FOR PURPOSES OF FILING ANY INSPECTION REPORTS, CONTRACTOR SHALL BE
<br /> SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING WATER TABLE SHALL RESPONSIBLE FOR COMPLETE INSPECTION AND FILING OF REPORT WITH LOCAL 7-ELEVEN, INC. 7-ELEVEN, INC.
<br /> POSSIBLY DETERMINE A DIFFERENT UTILIZATION OF THE TANK STRAPS AND TYPE OF HACK FILL 5.4 IF ALL OR PART OF THE WORK IS SUSPENDED FOR ANY REASON, CONTRACTOR SHALL PROPERLY CONSTRUCTION OFFICE. WRITTEN REPORT SHALL INCLUDE PHOTOGRAPHIC DOCUMENTATION OF ALL
<br /> MATERIAL. SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK EXCAVATION, COVER OVER, SECURE AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY FROM ANY CAUSE. PROCEDURES. NEW 4 M.P.D. CANOPY
<br /> WORK SHALL BE SUSPENDED PENDING REVIEW BY 7-ELEVEN CONSTRUCTION MANAGER. 5.5 PRODUCT PROTECTION: CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION OF PRODUCT NEW U.G. STORAGE TANKS
<br /> Q 2.7 TEST FAILURE: SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM, CONTRACTOR SHALL & RESTROOM ADDITION
<br /> 4.4 CONTRACTOR SHALL REPORT ANY OBJECTION TO MATERIALS, APPLIANCES, OR METHODS OF IN TANKS UPON DELIVERY UNTIL TURNED OVER FOR OPERATION. ALL FILL, VENT AND GAUGING CAPS IMMEDIATELY INSTIGATE PROCEDURES AS REQUIRED TO BRING SYSTEM INTO COMPLIANCE SHOULD
<br /> CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN A AND/OR OPENINGS SHALL BE SECURED AND PADLOCKED TO PREVENT VANDALISM OR THEFT. FAILURE OF TEST DUE TO FACILITY WORK REQUIRE EXPENDITURE OF ADDITIONAL MONIES FOR
<br /> DECISION BEFORE PROCEEDING. RESCHEDULING AND/OR RETESTING OF SYSTEM, CONTRACTOR SHALL BE HELD RESPONSIBLE FOR
<br /> PART 6 - SUBSTITUTION OF MATERIALS COMPENSATION ACCORDINGLY. SITE ADDRESS:
<br /> 4.5 PROPOSALS: CONTRACTOR SHALL SUBMIT BID ONLY ON 7-ELEVEN'S FORM THAT WILL BE PROVIDED BY 3040 BENJAMIN HOLT DR.
<br /> 7-ELEVEN'S LOCAL CONSTRUCTION MANAGER, "COST OF CONSTRUCTION" PROPOSALS SUBMITTED ON ANY 6.1 MATERIALS AS SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE PROPOSED IN 2.8 CLEANUP: IN THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION OR DURING
<br /> OTHER FORM SHALL BE REJECTED AND RETURNED. PROPOSALS NOT COMPLETELY AND PROPERLY FILLED WRITING WITH ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUTE MATERIALS IS WARRANTY PERIOD DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR SHALL BE RESPONSIBLE @ GRIGSBY PLACE
<br /> OUT SHALL HE REJECTED. PROPOSALS SHALL INCLUDE MONEYS FOR REMOVAL OF ALL EXISTING DEPENDENT ON RECEIPT OF WRITTEN APPROVAL FROM OWNER'S APPROVED REPRESENTATIVE. FOR CLEANUP AS MAY BE REQUIRED. STOCKTON, CA 95219
<br /> a IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION.
<br /> 2.9 TEST REPORT: UPON COMPLETION OF TESTING PROGRAMS, REPRESENTATIVE OF TESTING/ INSPECTION STORE #14113
<br /> 4.6 PERMITS: CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING AND PAYING ALL APPLICABLE STATE AND /� /� COMPANY SHALL HE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING TEST/INSPECTION
<br /> LOCAL PERMITS AND APPLICATIONS AS RELATED TO THIS WORK. COPIES OF PERMITS AND CERTIFICATES PART 7 - COMPLETION OF CONTRACT REPORTS WITH LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE OR THE OWNER'S ASSIGNED SITE DESIGNED BY: NP EC PM:
<br /> SHALL BE FORWARDED TO LOCAL 7-ELEVEN CONSTRUCTION MANAGER'S OFFICE OR SITE MANAGER PRIOR MANAGER WITH COPY TO JOB SITE. CHECKED BY: MEP PM:
<br /> KE
<br /> TO COMMENCEMENT OF WORK. FINAL CERTIFICATION OF ACCEPTANCE BY GOVERNING AUTHORITIES SHALL 7.1 THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE KE
<br /> ALSO HE ON FILE WITH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE PROCESSING OF STIPULATIONS, BOND OR BY LAW, WHEN ALL THE WORK HAS BEEN COMPLETED WITH FINAL INSPECTION DRAWN SY: D0 CONSULTANT PM:
<br /> FINAL PAYMENT REQUEST. AND ACCEPTANCE MADE BY ALL APPLICABLE GOVERNING BUILDING DEPARTMENTS, FIRE MARSHAL'S OR DATE: PROJECT NO:
<br /> W OTHER JURISDICTIONS.
<br /> 04-01.09 12728
<br /> , . 7.2 NOT USED DRAW NG TITLE:
<br /> G 7.3 CLEANING: SPECIFICATIONS
<br /> 7.3.1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION. REMOVE
<br /> ` TEMPORARY TAPES, WRAPPING, COATING, PAPER LABELS AND OTHER ITEMS.
<br /> 7.3.2 CLEANING METHODS FOR PROPRIETARY MATERIALS SHALL BE IN STRICT SHEET No: -
<br /> ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS,
<br /> SOLVENTS, WAXES OR OTHER MATERIALS SHALL BE ONLY AS APPROVED BY THE
<br /> g MANUFACTURER OF THE MATERIAL INSTALLED IN THE WORK. y�
<br /> 0 7.3.3 CLEANUP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE WORK OF . ■ ■