CLIENT:
<br /> 20' 0 20' 40' 60'
<br /> GRAPHIC SCALE: 1 20'-0" ELEVEN
<br /> CONSTRUCTION NOTES REFERENCE
<br /> SHEET
<br /> LN SUPER(UNLEADEDDOUBLEWALLFIBERGLASS GLA
<br /> 15,000 GUDSS 10,000 INFORMATION PROVIDED BY:
<br /> GALLO
<br /> G2.0 G5.0,
<br /> L "XERXES TANKS" G6.0
<br /> / RCA ,����-,__� _ O2 INSTALL NEW DOUBLE WALL TURBINE SUMP W/ CONTINUOUS G5.0 G6.0 edlergTOUp
<br /> BEN VACUUM MONITORING & LIQUID SENSOR BY VEEDER ROOT (TYP.) G7.0 Gi1.1 aj a �j t"
<br /> 'N HOLT (311.2
<br /> *Architecture
<br /> (2) NEW 2" DR/VE INSTALL NEW DOUBLE WALL FILL/VAPOR SUMP W/ CONTINUOUS 05.0 G6.0 .Engineering
<br /> DOUBLE WALL O VACUUM MONITORING & LIQUID SENSOR BY VEEDER ROOT (TYP.) C11.1 G71.2
<br /> VENT LINES *Planning
<br /> (2) NEW 2" VENT RISERS 17 *Project Management
<br /> WITH CONTAINMENT S P, NEW DOUBLE O (TURBINE SUMPS AUTOMATIC TANK GAUGE AT ALL TANK G5.0
<br /> FLEX CONNECTORS, AN 2322 West third Street
<br /> VEEDER-ROOT SENSOR. WALL FIBERGLASS INSTALL NEW 4" BLACK PIPE RISERS FOR NEW TURBINE G6.0, G7.0 Los Angeles,CA
<br /> 12 14 19 UNDERGROUND O5 90057-1906
<br /> ,pg STORAGE TANKS PUMPS, FILLS, VAPORS, AND AUTOMATIC TANK GAUGES. Phone;(213) 381-7891
<br /> (1) NEW CLEAN R i
<br /> AIR SEPARATOR ON © INSTALL ONE (1) 2 HE VARIABLE SPEED TURBINE IN THE G7.0 Fax:(213)381-1517
<br /> 4'xO4' CONC. PAD aOO - d�ipyp.17,� - SPEED TURBINE INN THE 1O OOOK GALLON SUPER UNLEADED fiedlergroup.com
<br /> `
<br /> 21 - L=na97' " TANK. TURBINES TO BE EQUIPPED WITH MECHANICAL LINE CONSULTANT:
<br /> (1) NEW ESO
<br /> ° (TYP.) -- - -- --- - -- LEAK DETECTORS. SET TURBINE INTAKES AT 6" FROM BOTTOM
<br /> AT VENT RISERS
<br /> OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER
<br /> • � SCREENS.
<br /> 'p NEW TURBINE
<br /> .) � O INSTALL NEW DROP TUBE W/ FLAPPER VALVE G5.0, G6.0
<br /> SUMP TYP
<br /> E ° SET AT 95% CAPACITY (TYP. OF )
<br /> �� TY TY 2
<br /> 5
<br /> R 20.00' INSTALL (1) NEW DUAL FLOAT VEEDER ROOT HYDROSTATIC
<br /> e= 836'0 ' \ STATIC 24 `�F /. INTERSTITIAL MONITOR AT EACH NEW TANK. (2 TOTAL) G5.0, G6.0
<br /> =3.00' `L- ,pF GROUNDING
<br /> '- '\S,F ��\'�iG�• °s• � O INSTALL NEW MANHOLE LID AND FRAME AT TURBINES, FILLS G6.0, G7.0
<br /> m ,A AND AT INTERSTITIAL MONITOR LOCATIONS.
<br /> 26 , •OSS ; ,;.'
<br /> NEW (2) 3" OVER 2"
<br /> ' 1p CONTRACTOR TO INSTALL NEW 8" THICK CONCRETE TANK G2.0
<br /> NEW 3" OVER 2" \ PRODUCT LINES & (1) 4" I3 �� ( SLAB. SET MANHOLE COVERS WITH 1 1/2" HIGH CROWN.
<br /> WVACUUM TUBING E ip OVER 3" VAPOR LINE & Ig °
<br /> B TWEEN TANK SUMPS i f SLOPE 1/8" MIN. PER FTii. I� CONTRACTOR TO INSTALL (1) OVERFILL ALARM &
<br /> NEW FILL/VAPOR- ;i. °�\ BACK TO TANKS I z
<br /> SUMP �/ :\\•
<br /> TYP.) ACKNOWLEDGMENT SWITCH ON CANOPY COLUMN 8' A.F.F. G71.0
<br /> 130 �\\ 16 40. DATE REVISION DESCRIPTION
<br /> 9 14 '•�� x� NEW CANOPY 12 INSTALL (2) NEW 2" VENT RISERS. PROVIDE C.A.R.B. APPROVED G9.0 1 w-M-09 REY. PER CLIENT
<br /> W I </' 22 7yp, I VENT CAPS AT GASOLINE RISER & CONNECT LINE TO HEALY UNIT. a 04-02.09 REV. PER CLIENT
<br /> CIA
<br /> w, INTERSTITIAL TYP. ,�'o -•� 13 INSTALL (4) NEW 3+0 SINGLE HOSE BLENDERS DISPENSERS. G8.0
<br /> (TYP.) ! T WITH NEW UNDER DISPENSER CONTAINMENT (UDC), SHEAR
<br /> VALVES, AND VEEDER-ROOT SENSORS.
<br /> N a8'451 E� (1) NEW ESO AT (p
<br /> ' 21 11.00. BLDG WALL \gym, 13A INSTALL ISD VAPOR FLOW METER AT EA. DISPENSER TYP. OF 4) G8.0
<br /> Q.. (TYP.) Q� 2..nw.
<br /> >.. I NEW OVERFILL _ ® 138 INSTALL (1) ISD PRESSURE SENSOR AT DISPENSER NEAR TANKIE 08.0
<br /> ALARM W/ [ N �-}
<br /> m'^ ACKNOWLEDGMENT J
<br /> vJ ON COLUMN AT ( w' lq . INSTALL NEW FLEX CONNECTORS AT ALL PIPING CONNECTIONS
<br /> rn E o 8' A.F.F. 11 __ rrdT WITHIN TURBINE SUMPS, FILL SUMPS, DISPENSER SUMPS, AND G6.0, G7.0
<br /> V 1
<br /> NEW 3 PRODUCT - - ----- - - - ---- �NEW
<br /> TRANSITION SUMP.
<br /> ry o BLEND DISPENSERS. o o a a o
<br /> Ly (3+0) TYP. 4) t
<br /> v � 13 13A 14 15 INSTALL NEW 3" OVER 2" DOUBLE WALL FIBERGLASS G8.0 sFAt:
<br /> O 18 PRODUCT LINES AND (1) 4" OVER 3" DOUBLE WALL
<br /> L NEW VEEDER-ROOT FIBERGLASS VAPOR LINE. REDUCE VAPOR LINE TO 3" OVER �pFESS1p
<br /> 0 o ] 2" INTO EACH DISPENSER SUMP. SLOPE ALL LINES 1/8° +�� 0• F �•"
<br /> E O m TLS-350 PANEL PER FOOT MIN. BACK TO TANKS. ZfnO :❑ 00 lb ® VERIFY LOCATION /l
<br /> I' s ti a No. C-38123
<br /> I• 16 NEW CANOPY SEE G14.1 Exp. 3-31-2011
<br /> E
<br /> EXISTING REMOTE
<br /> FILL TO REMAINto E171 � - �w 17 INSTALL (2) NEW 3" OVER 2" DOUBLE WALL FIBERGLASS G9,0 CIV11-
<br /> / • , VENT LINES TO NEW VENT TRANSITION SUMP & RISERS, 01,
<br /> o
<br /> EXISTING ( ( ! \ SLOPE ALL LINES 1/8" PER FOOT MIN. BACK TO TANKS.
<br /> WATER TOWER ----`I '---------- S aa'48'p0" W 119.25' 18 INSTALL NEW VEEDER-ROOT TLS-350PLUS MONITORING SYSTEM
<br /> I / E O PANEL WITH SMART SENSOR INTERFACE MODULES & PROGRAM SEE C11.1 coN DENT Autt STATEMENT
<br /> SYSTEMPOSTVE SHUTOFF AND FAIL SAFE.
<br /> M9 POC
<br /> IIf111 Ixo mE ,xfORlMlwx xwElx xM1 nG m
<br /> w FOR ncam USE My,rs E FR Nu SE+.nw Irl x
<br /> ` v n WIFIGF a MR ME PflNRT 115E OF flM EDil
<br /> PEASOW![l� PMf NfREM SN4A BE CPEO
<br /> WP111'AiLO,OKIPo&REO, Exxon
<br /> x Con OR LLNE UIEEFF A m
<br /> 19 INSTALL NEW DOUBLE WALL TRANSITION VENT SUMP G9.0 rz"vRE`"sssiH W OR ODo lx w"emxc�eE1$p "mu taco--.
<br /> -..... ....... w PERSON.YRO FSCORP N.01 REC Of
<br /> txs WC11...
<br /> W/ CONTINUOUS VACUUM MONITORING & LIQUID SENSOR BY lrownrn .er v"mE xwEOF RE ormEom x.W
<br /> IrnEEo TO me lvccax0 RETNOFFOI.
<br /> _ VEEDER ROOT (TYP.)
<br /> DEVELOPMENT INFORMATION:
<br /> ' } p m 2p INSTALL NEW (1) HEALY CLEAN AIR SEPARATOR UNIT ON G9.3
<br /> } 4'x4' CONCRETE PAD 7-ELEVEN, INC.
<br /> DEPTH OF TANKS BURY
<br /> - - - ' - - - - �_ FURTHEST 21 INSTALL 6" DIA. BOLLARD (TYP) SEE CIVIL. NEW 4 M.P.D. CANOPY
<br /> S 88'46'00' W 132.2a' DESCRIPTION DWG. C4.0/1 NEW U.G.STORAGE TANKS
<br /> , ISLAND
<br /> 22
<br /> 1. ELEVATION AT TOP OF ISLAND 1,p INSTALL NEW 6" REINFORCED GONG. DRIVE SLAB SEE CIVIL & RESTROOM ADDITION
<br /> DWG. C4.0/
<br /> 2. PIPING FALL = [Lx 1/4" PER FT.] p3 INSTALL EMERGENCY SHUTOFF SWITCH G9.O61TE nouaesS: -
<br /> 12
<br /> a = L x .0208 2q INSTALL 12" MANHOLE COVER FOR STATIC GROUNDING SYSTEM G7.0 3040 BENJAMIN HOLT DR.
<br /> o WHERE L7= 93 Ff. _]'94 FT. @ GRIGSBY PLACE
<br /> 3. PUMP ISLAND 0 IN. 25 NOT USED. STOCKTON, CA 95219
<br /> CONC. DRIVE SLAB s IN. G5.0 611.1 STORE #1411.3
<br /> PIPE COVER 6 IN.
<br /> n 26 INSTALL NEW 3" OVER 2" DOUBLE WALL FIBERGLASS PIPING
<br /> Q TAIPE NK OCAMETER ONS S+3 IN. FOR VACUUM TUBING BETWEEN TWO TANK SUMPS
<br /> 9 IN.
<br /> DESIGNED BY: DO
<br /> PIPING CROSS OVER ( FG PM:
<br /> TANK MANWAY (7 IN.) CHECKED W. NTP MEP PM:
<br /> PIPING LEGENDDRAWN BY: CONSULTANT PM:
<br /> 0 GENERAL NOTES TOTAL = 39 IN. 3.25 FT. Do
<br /> C? - - - - - - - 3" OVER 2" FIBERGLASS DOUBLE WALL PRODUCT PIPING 4. GRADE DIFFERENTIAL BATE: PROJECT No:
<br /> 4" OVER 3" FIBERGLASS DOUBLE WALL VAPOR RECOVERY PIPING (#2 + #3) 111; #4 5_19--FC. 12728
<br /> IT IS THE INTENT OF THIS DESIGN TO PROVIDE A TANK & PIPING SYSTEM COMPLIANT WITH AB-2481 REDUCE TO 3" OVER 2' INTO EACH DISPENSER SUMP 01i091
<br /> 09
<br /> € REQUIREMENTS FOR CONTINUOUS MONITORING OF ALL TANK & PIPING SYSTEM COMPONENTS. ALL DOUBLE 2" FIBERGLASS DOUBLE WALL VENT PIPING 5. TOP OF TANKS = TOP OF ISLAND - DRAWING .BLE:
<br /> N WALL PRODUCT & VAPOR RECOVERY, VENT PIPING, TURBINE SUMPS, FILL SUMPS, DISPENSER SUMPS AND GRADE DIFFERENTIAL -4.19
<br /> VENT TRANSITION SUMP SHALL BE CONTINUOUS VACUUM MONITORING. ALL TANKS ANNULAR SPACES SHALL * PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK FUEL SYSTEM
<br /> G BE MONITORED BY CONTINUOUS HYDROSTATIC SENSORS. ALL MONITORING DEVICES & SYSTEMS SHALL BE 1/8 PER FOOT MINIMUM. 6. TOP OF TANKS (LOWEST POINTS) -4.79
<br /> E CERTIFIED FOR USE IN CA UNDER LG-113 AND THE NATIONAL LEAK DETECTION WORKG ROUT.
<br /> + SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. SITE PIPING PLAN
<br /> S + EQUIPMENT FOR EVR PHASE I & PHASE II SHALL BE ALL PRODUCT VENT AND VAPOR PIPING TO BE DOUBLE CONTAINMENT PIPE. 7, TOP OF SLAB ELEV. ABOVE TANKS -0.10
<br /> 1. EXECUTIVE ORDER VR-102-F (DPW) PHASE I VAPOR RECOVER TANK ELEVATION (@ LOWEST ELEVATION)
<br /> " 2. EXECUTIVE ORDER VR-202-1 (HEALY) INCLUDING IN-STATION DIAGNOSTIC (ISD) SYSTEM AQMD INFORMATION Underground Service Alert SHEET No:
<br /> TO CALCULATE TOP OF TANK ELEVATION. START WITH 18" MINIMUM DEPTH OF VAPOR 4.19
<br /> + VEEDER-ROOT SENSORS AT ALL DISPENSER SUMPS, TURBINE SUMPS, FILL SUMPS, AND INTERSTITIAL MONITORS. RECOVERY LINE AT THE FARTHEST DISPENSER AND SLOPE 1/8" PER FOOT. & ADD 12" AT 8. DEPTH OF BURY _____FT. FUELING 8 Coll: TOLL FREE
<br /> OVERFILL ALARM W/ ACKNOWLEDGMENT SWITCH AND TANK GAUGING, ISD VAPOR FLOW & PRESSURE SENSORS. THE TANK, ADD 13" (FOR 3" PIPE) OR 8" (FOR 2") FOR A CHANGE IN PIPING DIRECTION POSITIONS t _800
<br /> E OVERFILL ALARM SHALL BE PROGRAM TO REMAIN ON UNTIL MANUALLY ACKNOWLEDGED. PROGRAM SYSTEM FOR OTHER THAN 90 OR 45 . SET TANKS 6" DEEPER THAN CALCULATED AS PRECAUTION. IN NOTE: FIBERGLASS TANKS TO HAVE 4'-0" MIN. & 7'-0" MAX. GASOLINE NOZZLES 8G1 A
<br /> "FAIL SAFE" AND POSITIVE SHUTOFF FOR ALL FUEL ALARM SENSOR OUT AND SHORT ALARMS. NO EVENT SHALL THE TANK BE BURIED LESS THAN 4'-0" BELOW FINISHED GRADE OR BURIAL. UNLESS WRITTEN APPROVAL FROM TANK MANUFACTURER ZZ7-Z6OO
<br /> DEEPER THAN 7'-0" BELOW FINISHED GRADE. SEE MANUFACTURERS INSTALLATION IS PROVIDED
<br /> RECOMMENDATIONS. ANY VARIATIONS IN SLOPE FROM 1/8" PER FOOT SHALL BE REPORTED DISTANT BETWEEN DISPENSERS
<br /> TWO WORKING DAYS BEFORE YOU DIG
<br /> TO THE OWNER'S ENGINEER. ISLANDS = 23'
<br /> h
<br /> g
<br /> s
<br /> ;3
<br />
|