Laserfiche WebLink
CLIENT <br /> PERFORMANCE SPECIFICATION CONTINUED <br /> TI1 VJUD <br /> ELEVEII <br /> SECTION IX CANOPIES - CONTINUED SECTION IX CANOPIES - CONTINUED <br /> PART 3 — EXECUTION <br /> 3.2 EXECUTION: <br /> 2.3 FASCIA: 3.2.1 COORDINATE DELIVERY AND INSTALLATION WITH GENERAL GASOLINE INSTALLER INFORMATION PROVIDED BY: <br /> 4 THROUGH LOCAL CONSTRUCTION OFFICE. MATERIALS SHALL BE STORED AT POSITION AS <br /> 2.3.1 VERTICAL SUPPORTS SHALL BE 14 GA STEEL. STUDS AT 14" O.C. OR 3 X 3 X 1/4 INDICATED BY GENERAL GASOLINE INSTALLER. g, Ed€g 'gI'OUp <br /> STEEL ANGLES ALL AT 24" O.C. WITH CORRESPONDING MEMBERS TOP AND BOTTOM SUPPORT. <br /> SCREWS FOR FASCIA SHALL BE ALUMINUM OR GALVANIZED SIZE AS REQUIRED. 3.2.2 CANOPY CONTRACTOR SHALL HE RESPONSIBLE FOR PROVIDING FOOTING ANCHOR BOLTS #1 <br /> AND TEMPLATE FOR DELIVERY TO GENERAL GASOLINE INSTALLATION CONTRACTOR 2 WEEKS PRIOR rg <br /> 2.3.2 REFER TO PROJECT DRAWINGS FOR FASCIA MATERIAL AND INSTALLATION. TO INSTALLATION. SIZE IN ACCORDANCE WITH SHOP DRAWINGS AND IN ACCORDANCE WITH aArchitecture <br /> 2.3.3 MATERIAL SHALL HE ONE OF THE FOLLOWING: GASOLINE INSTALLING CONTRACTOR'S SCHEDULE OF CONSTRUCTION. oEngineering <br /> 3.2.3 FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY oPlanning <br /> A. BACK—LIGHT FABRICATED SIGN SYSTEM GENERAL GASOLINE INSTALLER AS PER APPROVED SHOP DRAWINGS. TYPE OF CONCRETE SHALL ORProject Management <br /> B. PRE FINISHED METAL FASCIA SYSTEM. BE AS PER SHOP DRAWINGS. TYPE, SIZE, AND PLACEMENT OF ALL REINFORCED STEEL SHALL BE <br /> C. PRE FINISHED FASCIA MATERIAL AS SELECTED. AS PER SHOP DRAWINGS. 2322 West"ChiEd Street <br /> I.os Angeles,CA <br /> 3.1 FABRICATION DRAWINGS: <br /> 3.2.4 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND NOTIFY 90057-1906 7—ELEVEN, INC.'S CONSTRUCTION MANAGER IMMEDIATELY OF ANY DISCREPANCIES FOUND. REFER Phone; (213) 381-7891Fax:(213) 381-1517 <br /> 3.1.1 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ENGINEERED AND STAMPED TO SITE PLAN FOR SIZE, TYPE AND PLACEMENT OF CANOPY <br /> SHOP DRAWINGS FOR OVERHEAD STRUCTURE AND FOUNDATION SYSTEMS. fiedlergroup.com <br /> 3.2.5 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR BEING PROPERLY LICENSED IN <br /> 3.1 .2 DRAWINGS SHALL SHOW PROJECT LOCATION AND ADDRESS. LOCAL INSTALLATION AS WELL AS PROVIDING OWN PERMITS AS MAY HE REQUIRED. A COPY OF CONSULTANT: <br /> THE PERMIT MUST BE ON FILE IN THE LOCAL CONSTRUCTION OFFICE PRIOR TO COMMENCING <br /> 3.1.3 ORIGINAL ENGINEER'S STAMP FOR APPROPRIATE STATE SHALL BE AFFIXED TO EACH PAGE WORK. <br /> OF DRAWINGS, 3.2.6 CANOPY CONTRACTOR SHALL BE RESPONSIBLE. FOR PROVIDING CONSTRUCTION OFFICE <br /> 3.1.4 SHOP DRAWINGS SHALL SPECIFICALLY CALL OUT SOILS REPORT NUMBER AND DATE FOR WITH ACCEPTABLE INSURANCE AS REQUIRED PER 7—ELEVEN, INC. INSURANCE SPECIFICATIONS <br /> WHICH CANOPY FOOTINGS WERE DESIGNED. AND STANDARD CONTRACT FOR CONSTRUCTION. INSURANCE SHALL BE IN EFFECT FOR DURATION <br /> OF WORK. <br /> 3.1.5 SHOP DRAWINGS SHALL SPECIFICALLY CALL OUT SIZE, WEIGHT, TYPE AND NUMBER OF 3.2.7 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL WORK OF OTHER <br /> ALL STRUCTURAL MEMBERS. CONTRACTORS ALREADY IN PLACE, AS MAY BE REQUIRED. <br /> 3.1.6 ALL DESIGN LOADS SHALL COMPLY WITH LI.B.0 LATEST EDITION AND LOCAL BUILDING 3.2.8 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND OBTAINING <br /> DEPARTMENT REQUIRED LOADINGS, WHICHEVER IS MOST STRINGENT. MINIMUM DESIGN LOADS SHALL APPROVAL OF GENERAL GASOLINE CONTRACTOR PRIOR TO PLACING OF ANY HEAVY EQUIPMENT <br /> BE CONSIDERED TO BE: WIND 100#, LIVE 35#, UPLIFT 35# AND DEAD LOAD 35# OR AS LOCAL ON TOP OF CONCRETE WORK ALREADY IN PLACE. <br /> STRUCTURAL DESIGN DICTATES. IF APPLICATION IS SUBJECT TO HIGH ALTITUDE (SNOW) LOADING, <br /> DESIGN SHALL BE ADJUSTED TO COMPLY ACCORDINGLY. 3.2.9 ALL FOOTINGS SHALL BE ON FIRM UNDISTURBED SOILS OR FILL COMPACTED TO 95% <br /> 3.1.7 DEFLECTION OF ALL STRUCTURAL MEMBERS SHALL HE LIMITED TO SPAN 240 FOR G.L. MAXIMUM DENSITY BASED ON A.S.T.M. D 1557-70. IF ANY POOR SOIL CONDITION IS DISCOVERED <br /> DURING EXCAVATION, THE DESIGN ENGINEER SHALL BE NOTIFIED IMMEDIATELY FOR SOIL BEARING <br /> ONLY. VERIFICATION. <br /> 3.1.8 ATTACH DECK STRUCTURAL SUPPORTS WITH 3/8" DIAMETER BOLTS. 3.2.10 SUPPORTING COLUMNS SHALL BE PLACED AS PER 7—ELEVEN, INC. GASOLINE PLANS NO. DATE REVISION DESCRIPTION <br /> 3.1.9 ROOF DECK SHALL BE AN LC.B.O. APPROVED DIAPHRAGM DECK AND ATTACHED IN A AND AS PER APPLICABLE SITE PLAN. 7 7 9a-91-09 REV. PER CLIENT <br /> MANNER THAT COULD BE CONSIDERED A DIAPHRAGM. AN ALTERNATE TO THIS IS 1/2" DIAMETER 3.2.11 CANOPY SUPPORT COLUMNS SHALL BE CAPPED AT TOP. <br /> STEEL ROD DIAGONAL X—BRACING WITH TURNBUCKLES. LAYOUT OF ROD BRACING AND <br /> CONNECTIONS TO STRUCTURAL MEMBERS SHALL HE APPROVED BY STRUCTURAL ENGINEER. 3.2.12 ALL MATERIALS SHALL BE ALIGNED TRUE AND FLAT AND ALL PLANES SHALL HE FLAT, <br /> TRUE TO ESTABLISHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL WALLS CORRECT <br /> 3.1.10 CONCRETE FOOTINGS SHALL BE MADE WITH STONE AGGREGATE AND SHALL HAVE A AND ACCEPTABLE, PARAPET FASCIA SHALL BE VERTICAL AND PLUMB. ALL INTERSECTIONS SHALL <br /> COMPRESSIVE STRENGTH TO A MINIMUM 3000 LHS. PER SQUARE INCH WITHIN 28 DAYS AFTER BE TRUE AND STRAIGHTEDGE LINES. MATERIALS SHALL BE LEFT IN ACCEPTABLE CONDITION TO <br /> POURING. BE PAINTED BY OTHERS. ALL METAL SHALL BE FREE OF DEBRIS AS MAY BE REQUIRED FOR <br /> 3.1.11 ALL FOUNDATION METAL REINFORCEMENT SHALL BE OF FORMED TYPE BARS (EXCEPT #2 FINAL PAINTING/FINISHING. <br /> BARS) AND SHALL CONFORM TO THE REQUIREMENTS OF THE "STANDARD SPECIFICATION A.S.T.M. 3.2.13 GASOLINE CONTRACTOR SHALL HE RESPONSIBLE FOR POURING OF CONCRETE AROUND <br /> 615 GRADE 40". CANOPY COLUMNS, COVERING ANCHOR BOLTS AS MAY BE REQUIRED. <br /> 3.1.12 THE SHOP DRAWINGS SHALL EXPLICITLY SHOW LOCATION OF DOWN SPOUTS, INTERIOR PVC 3.2.14 CANOPY CONTRACTOR SHALL LEAVE ALL EXPOSED STRUCTURAL STEEL FREE OF DEBRIS, <br /> DRAINS IN WARM WEATHER AREAS, ETC., AS RELATED TO ANY AND ALL UTILITIES AND/OR PIPING PRIMED AND READY FOR FINAL PAINTING BY GASOLINE CONTRACTOR. <br /> AT COLUMN LOCATIONS. ROOF DRAINS AND LEADERS SHALL BE DIRECTED DOWN THE INTERIOR <br /> CANOPY COLUMN EXITING SIDE OF ISLAND LEVEL OR ABOVE FINISH GRADE OF CONCRETE SIDE PAD 3.3 RESPONSIBILITIES OF GENERAL GASOLINE CONTRACTOR: <br /> ON DOWNHILL SIDE OF ISLAND. DOWN SPOUTS SHALL BE 4" X 4" CONSTRUCTED OF 16 GA SLIT: <br /> GALVANIZED METAL OF FREEZE—PROOF OR OPEN—FACE DESIGN. 3.3.1 SHALL BE RESPONSIBLE FOR A MINIMUM OF 30 DAY NOTIFICATION OF DATE WHEN SITE <br /> WILL HE READY FOR INSTALLATION OF GASOLINE CANOPY. PROFEss�D� <br /> 3.1.13 INCLUDE IN DESIGN PROVISION FOR OVERFLOW DEVICE AT OPPOSITE CORNERS OF <br /> CANOPY. 3.3.2 UPON AGREED DATE BETWEEN GASOLINE CONTRACTOR AND CANOPY CONTRACTOR, THE <br /> SITE SHALL HE FREE OF MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL AND IN PROPER Q A <br /> 3.1.14 CONSTRUCTION NOT SPECIFICALLY INDICATED SHALL BE ACCOMPLISHED PER MINIMUM CONDITION FOR CANOPY INSTALLATION. GENERAL GASOLINE CONTRACTOR SHALL PERFORM SITE a Nc. c-38123 7 <br /> REQUIREMENTS OF THE UNIFORM BUILDING CODE, LATEST EDITION. WORK AS MAY BE REQUIRED TO COMPLY. E.P. 3-31-2011 <br /> 3.1.15 IF THERE ARE ANY CONFLICTS BETWEEN LINES ON DRAWINGS AND GENERAL NOTES OR 3.3.3 GASOLINE CONTRACTOR SHALL NOT INSTALL GASOLINE DISPENSERS PRIOR TO CANOPY R CIV11- <br /> WITH SPECIFICATIONS, THE MOST STRINGENT REQUIREMENTS GOVERN. ERECTION, UNLESS AGREED UPON IN WRITING BETWEEN THE CANOPY INSTALLER AND GASOLINE "WrE-CF CPLIF <br /> INSTALLER. <br /> 3.1.16 ANY DEVIATION FROM THE PLANS OR SPECIFICATIONS SHALL BE APPROVED BY <br /> 7—ELEVEN, INC.'S CONSTRUCTION REPRESENTATIVE. 3.3.4 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CANOPY <br /> FOOTINGS AS DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, PROVIDING CONFIDENTIALITY STATEMENT: <br /> 3.1.17 FABRICATION DRAWINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE A ALL STEEL, ETC., (WITH THE EXCEPTION OF ANCHOR BOLTS TO BE PROVIDED BY CANOPY 11PUBT�SROUF IN°aa a..errN"ruR,.Io'Ixr�"c ro <br /> MINIMUM OF 4 WEEKS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO WORK SHALL COMMENCE ) coenoENCE mfl mE M.USE or AurncaIIM <br /> INSTALLER), FOOTINGS SHALL HE POURED IN SUFFICIENT AMOUNT OF TIME, SO PROPER wvwNxa Na rAer xEaEor:r l ec c.H% <br /> wvirwrEo, asTweurco, aSCLOSEO ofl .Awvume ro <br /> CURING TIME IS ALLOWED. OTHERS OR essD TO.wr .WSED a TA Ac <br /> PRIOR TO APPROVAL OF DRAWINGS BY 7—ELEVEN, INC.'S CONSTRUCTION REPRESENTATIVE. ElwnEm, <br /> "ARM IN IRI,l. a.n.L.cxouv.Am <br /> IpYT'ER r5,W1flC1MM.alF BER�FA " TOM <br /> 0.IO TO PAVE <br /> 3.3.5 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING OF ALL METAL AND TRIM AaflU.ro M, rTRETO c <br /> AS RELATED TO THE GASOLINE CANOPY AS PER STANDARD COLOR REQUIREMENTS. DEVELOPMENT INFORMATION: <br /> 3.3.6 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLATION OF 7-ELEVEN, INC. <br /> LIGHTS, SIGNS, SECURITY LIGHTS, ETC., IN CONJUNCTION WITH NORMAL GASOLINE INSTALLATION. <br /> G.C. SHALL CAULK SEAL ALL LIGHT FIXTURES TO CANOPY DECK. NEW 4 M.P.D. CANOPY <br /> 3.3.7 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVING BLOCK OUTS AS MAY BY NEW U.G. STORAGE TANKS <br /> REQUIRED FOR INSTALLATION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS. AND & RESTROOM ADDITION <br /> PLACEMENT OF ANCHOR BOLTS IN ACCORDANCE WITH SHOP DRAWINGS AS RELATED THERETO. <br /> 3.4 WARRANTIES: CANOPY CONTRACTOR SHALL WARRANTY, IN WRITING, COMPLETE CANOPY INSTALLATION FOR A SITE ADDRESS: <br /> MINIMUM PERIOD OF 2 YEARS, A 5 YEAR WARRANTY GUARANTEEING INSTALLATION TO BE FREE OF DESIGN <br /> °g AND INSTALLATION DEFECTS. EXCLUDING ACTS OF MAN, GOD AND NORMAL WEAR AND TEAR. 3040 BENJAMIN HOLT DR. <br /> 3.5 CLEAN—UP: CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND REMOVAL FROM SITE ALL @ GRIGSBY PLACE <br /> TRASH AND DEBRIS RESULTING FROM WORK RELATING TO INSTALLATION OF CANOPY. STOCKTON, CA 95219 <br /> STORE #14113 <br /> DESIGNED BY: NTP FG PM. KE <br /> Y CHECKED BY: KE MEP PM: <br /> DRAWN BY: DO CONSULTANT OR: <br /> DATE: PROJECT NO: <br /> E 04.01.09 12728 <br /> N DRAWING TITLE: — - <br /> a <br /> G SPECIFICATIONS <br /> E <br /> 8 <br /> 3 SHEEP N0: <br /> V <br /> g <br /> G13A <br />