My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3040
>
2300 - Underground Storage Tank Program
>
PR0506497
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:15:07 AM
Creation date
11/5/2018 12:07:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0506497
PE
2351
FACILITY_ID
FA0007461
FACILITY_NAME
7-ELEVEN INC #14113
STREET_NUMBER
3040
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10027018
CURRENT_STATUS
01
SITE_LOCATION
3040 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3040\PR0506497\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
6/17/2015 10:38:34 PM
QuestysRecordID
104480
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGIOSUND STORAGE TANK MONTTORINt�ROGRAM <br /> L WRITTEN MONTPORING PROCEDURES <br /> 1. Site Name: 7-Eleven Facility#14113 <br /> 2. Site Address: 3040 Benjamin Holt Drive, Stockton, CA <br /> 3. Describe the frequencof performing the monitoring method. <br /> All Southland tanks, both single-wall and double-wall,are equipped with automatic tank gauges <br /> (ATGs). The ATGs monitor the system constantly and test the tanks monthly to obtain a valid <br /> monthly test(tank capacity between 50-90% full,4-hour wait time between deliveries and 6-hour <br /> test time). The piping systems(single-wall and double-wall)are monitored constantly by <br /> mechanical pressure gauges. Additionally, all Southland piping systems receive line tightness tests <br /> annually. <br /> 4. What method and equipment will be used for performing the monitoring? <br /> Quantitative monitoring will be used at all Southland sites. The ATGs test both types of tanks <br /> monthly. The ATG system used by the Southland Corporation is the TIDEL EMS. The piping <br /> systems are tested annually with line tightness tests and are constantly monitored with Red Jackets or <br /> Vaporless LD 2000 which will shut off the piping if the pressure drops too low. <br /> 5. Describe the location(s)where the monitoring will be performed. <br /> The Red Jackets or Vaporless LD 2000 are located in the turbin pit. The ATGs are located in the <br /> tanks. <br /> 6. List the name(s)of the Verson(s)responsible for performing the monitoring and/or maintaining the <br /> equipment. <br /> The individual(s)responsible for monitoring the equipment is/are the store operator(s). The store <br /> operator(s)for this store is/are Jack Fuller . The Southland Corporation is responsible for <br /> maintaining the equipment. <br /> 7. Reporting format: The TIDEL EMS unit keeps the results of leak tests in memory for 12 months. <br /> This information can be printed by following the instructions on the unit. <br /> 8. State the preventive maintenance schedule for the monitoring equipment. Note: The maintenance <br /> schedule shall be in accordance with the manufacturer's instructions. <br /> Equipment repairs and replacement will be performed as needed. Additionally, in accordance with <br /> the manufacturer's instructions,the monitoring equipment will be tested annually to certify that it is <br /> functioning properly. <br /> 9. Describe the training needed for the operation of both the tank system and the monitoring equipment. <br /> Training is provided for new employees. Training refreshers are offered as needed. The operations <br /> manual for the equipment was provided to the store operator when the equipment was installed. <br /> Training also includes emergency procedures and spill clean-up. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.