My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3128
>
2300 - Underground Storage Tank Program
>
PR0501551
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:23:48 AM
Creation date
11/5/2018 12:07:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0501551
PE
2381
FACILITY_ID
FA0005145
FACILITY_NAME
EXXON COMPANY USA
STREET_NUMBER
3128
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09523002
CURRENT_STATUS
02
SITE_LOCATION
3128 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3128\PR0501551\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/28/2011 8:00:00 AM
QuestysRecordID
104696
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°- f <br /> �.r STATE OF CALIFORNIA f4. - 4 <br /> -e s <br /> STATE WATER RESOURCES CONTROL BOARD s <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B �� �; <br /> ^ � . ° <br /> COMPLETE A SEPARATE FORM FOR TANK SYSTEM. °"�"°"".f <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT EVS CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ S TEMPORARY TANK CLOSURE ❑ B TANK REMOVED �7 <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: I Z + L� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.0.1 q B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOCAYNEAR) D. TANK CAPACITY N GALLONS: <br /> ILTANKCONTENTS IFA4 IS MARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL 4 OIL <br /> ❑ ❑ ❑ 1aUNLEA ED 8 4 REGULAR 3 GGASAHOL ❑ <br /> 8. C. IESEL6 AWATION GAS <br /> ❑ 2 PETROLEUM ❑ 90 EMPTY ❑ I PRODUCT ❑ lb <br /> PREMIIIUM 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CFIEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> 0. IF(0.I)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.0.S.f: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.9,AND C.AND ALL THATAPPLIES IN BOX <br /> A. TYPE OF ❑ I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> ❑ <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL E] 3 FIBERGLASS ❑ 4 STEEL CLAD Wl FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B IOOx METHANOL COMPATIBLE W/FRP <br /> (PdmmyTARk) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 90 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 96 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ I POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IFUNDERGROUND,BOTHIFAPPLICABLE <br /> A. SYSTEM TYPE A U I SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U I SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U I RARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 9 CONCRETE A U 7 STEELWICOATING A U B 100% METHANOL COMPATIBLEWIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNIWOWN A U 99 OTHER <br /> INTERSTITAL 99 <br /> D. LEAK DETECTION ❑ I AUTOMATIC LINE LEAK DETECTOR [D2 LINE TIGHTNESS TESTING ❑ T MONITORING C:] OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 9 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOIDAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS IN <br /> MATERIAL? YES ❑ NO❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> IPRNTED 4 SK:NAW REI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATEI.D.#EXXCw3J = © 1 1 1 1 11 aYl 61Z3y' <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> FORM B (9.901 THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORDWIIrJ✓NI <br />
The URL can be used to link to this page
Your browser does not support the video tag.